40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 272 of 344  Not logged in ELOG logo
Entry  Wed Jul 20 14:03:01 2016, ericq, Update, SUS, Effect of thicker ruby standoffs 
Entry  Thu Apr 23 18:09:11 2009, Yoichi, Update, Environment, Effect of cryopump SeisTrend.pdf
Entry  Wed Jan 8 13:01:48 2014, Gabriele, Summary, LSC, Effect of PRC length mismatch on error signals REFL_vs_PRClength.pdf
    Reply  Wed Jan 8 16:08:52 2014, ericq, Summary, LSC, Effect of PRC length mismatch on error signals phaseVlength.pdf
    Reply  Wed Jan 8 19:05:30 2014, Gabriele, Summary, LSC, Effect of PRC length mismatch on error signals as11.pngas55.png
    Reply  Thu Jan 9 17:58:31 2014, ericq, Summary, LSC, Effect of PRC length mismatch on error signals 
    Reply  Fri Jan 10 15:31:07 2014, rana, Summary, LSC, Effect of PRC length mismatch on error signals 
    Reply  Sun Jan 12 09:57:24 2014, Gabriele, Summary, LSC, Effect of PRC length mismatch on error signals 
Entry  Wed Sep 28 14:15:40 2011, Jenne, Update, Computers, Edits to c1pem, c1oaf 
Entry  Sun Jul 13 22:39:16 2008, John, Summary, General, Edited medm screens  
Entry  Wed Apr 15 17:11:37 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon 
    Reply  Thu Apr 16 11:17:56 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon 
Entry  Wed Aug 30 15:00:06 2017, gautam, Update, General, Edgeswitch fiber swap 
    Reply  Mon Mar 11 17:18:00 2013, Manasa, Update, Environment, Earthquake: Suspensions tripped and MC realigned 
Entry  Tue Mar 16 04:22:02 2010, Jenne, Update, Environment, Earthquake, Mag 4.4  EQ_16Mar2010.png
    Reply  Tue Mar 16 05:10:39 2010, koji, Update, Environment, Earthquake, Mag 4.4  100316_MC_SUS.png
Entry  Tue Feb 19 15:21:47 2008, Andrey, Update, SUS, Earthquake tripped watchdogs in ETMY, ITMY 
Entry  Tue Oct 25 14:29:56 2022, Paco, Summary, SEI, Earthquake tripped SUS 
Entry  Fri Aug 12 15:46:51 2011, Jenne, Update, SUS, Earthquake stop procedure 
Entry  Thu Jul 4 10:47:37 2019, Milind, Update, General, Earthquake now after_earthquake2.jpgafter_earthquake.jpg
Entry  Thu Jan 8 20:26:17 2009, rob, Omnistructure, General, Earthquake in San Bernardino 
Entry  Sun Aug 19 01:41:27 2012, Masha, Update, PEM, Earthquake Classified Earthquake_Found.png
Entry  Thu Apr 12 00:16:38 2012, Jenne, Update, Environment, Earthquake - moderate 
Entry  Fri Dec 14 03:49:02 2012, Ayaka, Update, General, Earthquake earthquake.pngseis.pdf
Entry  Tue Jan 29 20:28:11 2013, ericq, Update, General, Early work on Mirror Mounts early.pdf
    Reply  Wed Jan 30 03:01:55 2013, Koji, Update, General, Early work on Mirror Mounts 
    Reply  Mon Dec 2 18:20:29 2019, gautam, Update, ALS, EY uPDH post mixer LPF EY_uPDH_LPF.pdfEY_uPDH_OLTF.pdf
    Reply  Mon Dec 2 20:18:18 2019, rana, Update, ALS, EY uPDH post mixer LPF 
    Reply  Tue Dec 3 00:10:15 2019, Koji, Update, ALS, EY uPDH post mixer LPF 
    Reply  Tue Dec 3 00:51:25 2019, gautam, Update, ALS, EY uPDH post mixer LPF 
    Reply  Tue Dec 3 18:15:42 2019, gautam, Update, ALS, EY uPDH post mixer LPF 
    Reply  Tue Dec 3 21:28:24 2019, gautam, Update, ALS, EY uPDH post mixer LPF uPDH.pdf
    Reply  Tue Aug 6 23:09:20 2019, gautam, Update, ALS, EY table work 
Entry  Wed Nov 21 16:48:11 2018, gautam, Update, COC, EY mini cleanroom setup IMG_7174.JPG
Entry  Tue Jan 15 10:52:38 2019, gautam, Update, SUS, EY door opened 
    Reply  Tue Jan 15 15:49:47 2019, gautam, Update, SUS, EY door opened EY_OSEMs.png
    Reply  Mon Nov 26 17:16:27 2018, gautam, Update, SUS, EY chamber work IMG_5251.JPG
    Reply  Wed Jan 23 12:39:18 2019, gautam, Update, SUS, EY chamber work 6x
    Reply  Wed May 15 10:57:57 2019, gautam, Update, SUS, EY chamber opened 
Entry  Fri Apr 27 16:55:31 2018, gautam, Update, General, EY area access blocked 
Entry  Fri Aug 2 11:37:38 2019, gautam, Update, ALS, EY IR ALS Assay IMG_7780.JPGEy_MM_20190802.pdf
Entry  Mon Jun 11 23:22:53 2018, gautam, Update, CDS, EX wiring confusion 
    Reply  Wed Jun 13 23:23:44 2018, johannes, Update, CDS, EX wiring confusion c1auxex_channels.pdfXEND_slow_wiring.pdf
    Reply  Thu Jun 14 10:41:00 2018, gautam, Update, CDS, EX wiring confusion 
    Reply  Thu Jun 14 15:31:18 2018, johannes, Update, CDS, EX wiring confusion XEND_slow_wiring.pdfc1auxex_channels.pdf
    Reply  Tue Oct 22 15:32:15 2019, gautam, Update, ALS, EX uPDH electronics checkout uPDH_X_OLTFs.pdf
    Reply  Wed Oct 23 10:23:26 2019, rana, Update, ALS, EX uPDH electronics checkout 
    Reply  Wed Oct 23 11:11:01 2019, gautam, Update, ALS, EX uPDH electronics checkout 
    Reply  Wed Oct 5 16:28:10 2016, gautam, Update, endtable upgrade, EX laser power monitor PD installed 
Entry  Fri Apr 13 16:59:12 2018, gautam, Update, ALS, EX green mode-matching 
ELOG V3.1.3-