  12449   Sun Aug 28 21:40:11 2016 gautamUpdateSUSETMY UL sensor problematic I wanted to observe the UL coil for any
excursions over the weekend. Looking at the
2 day trend, something is definitely wrong.
 ETMY_UL_problematic.png 
  12450   Mon Aug 29 09:37:05 2016 gautamUpdateSUSETMY UL sensor problematic It looks like the problem is indeed in
the Satellite box. Attachment #1 shows the
second trend for the last 12 hours (~930pm
 satelliteBox.png 
  12451   Mon Aug 29 14:42:06 2016 gautamUpdateSUSETMY Satellite box diagnosticsI opened up the ETMY satellite box to investigate
the glitches seen in the UL sensor output. 

Attachments #1 & 2: The
 IMG_6840.JPGIMG_6841.JPG 
  12452   Mon Aug 29 21:53:14 2016 LydiaUpdateSUSETMY bounce mode coupling[gautam, johannes, lydia]

We decided to try some different
approaches on minimizing the ETMY bounce
 IMG_3051.JPG42.png 
  12453   Tue Aug 30 09:51:37 2016 SteveUpdateSUSthe chamber HEPA tents are backHow to minimize particles entering the
vacuum envelope.

 
 ETMYtentHEPA.jpgvented_for_60_days.png 
  12454   Tue Aug 30 15:44:28 2016 SteveUpdateSUS wire standoffs update100
Sapphire prisms ordered. Delivery date
9-30-2016
  
  12455   Tue Aug 30 20:26:36 2016 gautamUpdateSUSITMY installed[gautam,
johannes, lydia]
 IMG_3052.JPGSRM_sensor_level_comp.pngETMY_BounceSpectra_30Aug2016.pdf 
  12456   Wed Aug 31 18:07:43 2016 JohannesUpdateSUSITMY free swinging[Lydia, Gautam, Koji, Johannes]

Summary of things done today:
  
  12457   Wed Aug 31 22:09:18 2016 gautamUpdateSUSY arm locked to Green Koji tweaked the alignment sliders till
we were able to get the Y arm locked to green
in a 00 mode, GTRY ~ 0.5 which is the prevent
  
  12458   Wed Aug 31 23:01:02 2016 gautamUpdateSUSthe chamber HEPA tents are backSome more numbers we found while working
in/around the chamber today:

  
  12459   Thu Sep 1 08:30:24 2016 SteveUpdateSUSITMY_UL is sickSo if the SRM satellite box is good, than
the ITMY sensor UL or vacuum cabeling from
sersor to sat amp is bad.
 ITMY_SENSOR_UL.pngspareSatAmp.jpg 
  12460   Thu Sep 1 15:28:01 2016 ranaUpdateElectronicsAcoustic Tab and Amp Suspension
add photo of installation
no
more secret personal pages! put channels
into the actual pages that we look at
make
  
  12461   Thu Sep 1 15:40:52 2016 SteveUpdateSUSHEPAs on each chamber doorThis is an option to isolate the vacuum
chamber from the dusty 40m lab: 4x8 HEPA
unit or
 chamberDoorHepaEA.pdf 
  12462   Thu Sep 1 15:43:16 2016 ranaUpdateSUSOSEM adjustmentsOn the bounce roll balancing:

Recall that back in 2006, the main
issue was not with the bounce mode coupling
  
  12463   Thu Sep 1 17:25:02 2016 PrafulUpdateElectronicsAcoustic Tab and Amp SuspensionI'll add a picture of the installation
when I get back to campus and finish hooking
up the power cable. I haven't added this
  
  12464   Thu Sep 1 19:18:14 2016 JohannesUpdateSUSITMX and ETMX preemptive table levelingI balanced the ITMX and ETMX tables into
level position today, for which I had to
move quite a few of the on-table weights.
 8x 
  12465   Thu Sep 1 19:59:22 2016 JohannesUpdateSUSIR mode flashes in Y arm[Gautam, Lydia, Johannes]


After placing the irises
on the ETMY and ITMY cages we found that
  
  12466   Fri Sep 2 21:09:08 2016 gautamUpdateSUSY arm locked in air[johannes, lydia, gautam]


The Y arm has been locked
to IR in air using POY11 as an error signal 
 03.png56.png 
  12467   Fri Sep 2 21:15:53 2016 gautamUpdateSUSITMX and ETMX preemptive table levelingThe ITMX table had relaxed overnight into
a slightly misaligned state overnight - since
the ITMX table holds PR2 and hence can affect
  
  12468   Fri Sep 2 21:16:45 2016 ranaUpdateElectronicsSatellite AmplifierIn November of 2010, Valera Frolov (LLO),
investigated
our satellite amplifiers and made some recommendations
  
  12469   Mon Sep 5 19:57:24 2016 OsamuUpdateSUSOSEM adjustmentsHi 40m people,

As Rana is saying, the bounce mode
does not matter, or we cannot do anything. Generally
  
  12470   Mon Sep 5 21:05:06 2016 ranaUpdateElectronicsSatellite AmplifierThe attached PDF shows the output noise
of the satellite amp. This was calculated
using 'osempd.fil' in the 40m/LISO
 osempd.pdf 
  12471   Tue Sep 6 00:14:14 2016 gautamUpdateElectronicsSatellite Amplifier 




 osempdComparison.pdf 
  12472   Tue Sep 6 18:21:13 2016 ranaUpdateSUSOSEM issuesI looked at the PRM free swing spectra.
The modes look like they're at the right
frequencies, so pointing more and more towards
 PRMswing.png 
  12473   Tue Sep 6 20:30:56 2016 ranaUpdateSUSITMY_UL is sickIn the morning, Steve will start opening
the north BS door so that we can enter to
inspect the PRM LR OSEM.
  
  12474   Tue Sep 6 20:45:14 2016 gautamUpdateSUSX arm test masses back in chamber[Teng, Johannes,
Lydia, gautam]


The
 IMG_3137.JPGIMG_3143.JPGIMG_3142.JPGIMG_3148.JPG 
  12475   Tue Sep 6 20:52:42 2016 gautamUpdateSUSOSEM issues



The
 P9060254.JPG 
  12476   Wed Sep 7 17:23:26 2016 gautamUpdateSUSPRM LR fixed for now[johannes, gautam]


We took the heavy door
off in the morning with Steve's help
The
 IMG_3208.JPGIMG_3211.JPG 
  12477   Wed Sep 7 18:00:47 2016 LydiaUpdateGeneralAcromag Progress[Teng, Lydia]

We
would like to establish a system for setting
  
  12478   Thu Sep 8 22:12:36 2016 gautamUpdateSUSX arm in place, locked to green, IR flashes visibleDetailed elog to follow but summary of
todays activities:


ITMX and ETMX are back
  
  12479   Fri Sep 9 11:24:15 2016 SteveUpdatesafetysafety trainingVisiting
graduate student Teng Zhang from Glasglow
  
  12480   Fri Sep 9 17:50:02 2016 gautamUpdateSUSHeavy doors on BS-PRM, ETMY chambers[steve, teng, johannes, lydia, gautam]


we set about doing some
final checks on the Y arm while Johannes
  
  12481   Sat Sep 10 14:26:01 2016 ranaUpdateGeneralPRM SRM alignmentFor the PRM, I aligned it until the arm
flashes were maximized and the REFL camera
showed a centered spot with dips happening
 Osamu.JPG 
  12482   Mon Sep 12 17:15:22 2016 JohannesUpdateGeneralPRM SRM alignment[Gautam, Steve, Johannes]

We put on the remaining heavy doors
on the chambers (ITMY, ITMX,ETMX, in this
 IMG_3273.JPGIMG_3275.JPG 
  12483   Mon Sep 12 17:54:24 2016 SteveUpdateVACpumpdown 79 We are pumping down. The annuloses
are below 10 mTorr

The vacuum gauges are not communicating
  
  12484   Mon Sep 12 20:15:22 2016 LydiaUpdateSUSDiagonalization in air[Lydia, Teng]

We ran the scripts to diagonalize
the damping matrices using the free swinging
 ITMY_fit.jpgBS_diag.jpg 
  12485   Mon Sep 12 20:19:25 2016 LydiaUpdateGeneralMC REFL beam splitter not replacedThe
beam splitter that directs light into the
MC REFL photodiode has not been replaced;
  
  12486   Tue Sep 13 11:00:59 2016 LydiaUpdateSUSETMY UL glitch returned 




  
  12488   Tue Sep 13 17:47:04 2016 SteveUpdateVACpumpdown 79 completedP1 IFO pressure is 1 mTorr, valve configuration: vacuum normal,
annulosses are pumped, RGA is off, not pumped.
  
  12489   Tue Sep 13 19:02:56 2016 TengUpdateGeneralITMX sensor[Lydia,Teng]

Something strange happened to the
ITMX osem reading around 4.pm. PDT as shown
 47.png34.png 
  12490   Tue Sep 13 19:18:43 2016 LydiaUpdateSUSDiagonalization in air[Lydia, Teng]

We continued to work on the diagonalization
scripts today and devised a way of choosing
 ITMY_diag.jpg38.png 
  12491   Wed Sep 14 09:33:54 2016 SteveUpdateGeneralITMX magnets are stuckedI believe that the UR and LR magnets are
stuck. There was no earth quake at 16:18
yesterday. Something had to kick it into
 ITMXmagStuck.png 
  12492   Wed Sep 14 09:44:09 2016 SteveUpdateVACpumpdown 79 completedThe pumpdown started at
9-12-2016

The IFO is at 5e-5 Torr vacuum
 pd79.pngpd79d2.jpgCCcg.jpg 
  12493   Wed Sep 14 19:41:23 2016 JohannesUpdateGeneralPSL back to high powerToday's summary:


Replaced mirror in MC REFL
path with R=10% BS and aligned beam on PD
  
  12494   Wed Sep 14 20:05:32 2016 LydiaUpdateGeneralITMX magnets are stuckedWhen I restarted c1susaux yesterday, I
didn't know that I needed to disable
the coil outputs first. So when it came back
  
  12495   Wed Sep 14 20:27:03 2016 LydiaUpdateSUSDiagonalizationToday the main optics were free swinging
for several hours, so I attempted diagonalization
in vacuum.
 ETMY_diag.png 
  12496   Thu Sep 15 10:36:32 2016 SteveUpdateVACpumpdown 79 day 3IFO pressure 3.7e-5 Torr at new cold cathode
InstruTech - Hornet

New
 vent78for73d.png 
  12497   Thu Sep 15 18:37:20 2016 LydiaUpdateSUSDiagonalization[Teng, Lydia]


We fixed the 60Hz filter
on ITMY. This improved the phase problems
 ETMY_osemspec.pngITMY_osemspec.png 
  12498   Fri Sep 16 14:15:28 2016 steveUpdatePEMpartical countsSouth end flow bench and both clean room
assembly flow benches measured zero counts
for 0.3 and 0.5 micron size particales.
 80days.png 
  12499   Fri Sep 16 19:14:27 2016 LydiaUpdateSUSDiagonalization[Lydia, Teng]

We built matrices for ITMY
and ETMY by driving one degree of freedom
 ETMY_yawdrivedefault.pngETMY_yawdrivenew.pngETMY_yawdriveold.png57.png 