40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 271 of 344  Not logged in ELOG logo
    Reply  Thu Oct 24 23:25:37 2013, Jenne, Update, LSC, End transmission triggering 


    
        
            Quote:
        
        
            

           Software (schmidt triggering) for end transmission QPDs.
    Reply  Tue Nov 5 16:47:09 2013, Jenne, Update, LSC, End transmission QPDs 
I think Steve is trying to align the end transmission QPDs, since the arms are locked nicely right now.  I noticed that the QPDX pitch and yaw signals
were digital zeros.  A quick look determined that the QPDX matrix to go from 4 quadrants to 3 degrees of freedom had been filled in for the POS row,
but not pitch and yaw.  So, I copied the QPDY matrix over to QPDX (so the ordering of the rows and columns is assumed to be the same).  
    Reply  Tue Nov 20 11:40:19 2012, rana, Configuration, Green Locking, End table upgrade for auxiliary green laser : ETMX layout on new table 
 
 Mounts:

    No more mounts using the 1" dia. pedestal / fork technology.
    No more mounts using the 1/2" post / post holder
Entry  Mon Jul 22 17:17:30 2013, annalisa, Update, endtable upgrade, End table picture YendTable.jpg
 
    Reply  Tue Jul 23 00:51:46 2013, Koji, Update, endtable upgrade, End table picture P7224222.JPGP7224223.JPGP7224224.JPGP7224238.JPG
The spot on the IPANG QPD was checked. The spot is higher than the center and South side of the lens.
Some photos are found below.
The spot on the IPANG steering mirrors in the ETMY chamber was also checked.
    Reply  Tue Jul 23 19:37:08 2013, Annalisa, Update, endtable upgrade, End table picture IMG950073.jpgIMG950072.jpg


    
        
            Quote:
        
        
            

           The spot on the IPANG QPD was checked. The spot is higher than the center and South side of the lens.
Entry  Wed Aug 18 11:40:59 2010, josephb,kiwamu,yoichi, Update, CDS, End station working with latest RCG code 
We were able to get the latest SVN checkout (revision 2009), working with the c1x00 (IOP) and c1vgl models at the new X end on the c1iscex machine.
We were unable to get it working yesterday, and as far as we can tell, the only significant change was a reboot of the c1sus machine.  Before
the reboot, it did not look like there were any conflicting models running on the c1sus machine, but apparently something was preventing the models on
    Reply  Mon May 23 13:16:59 2022, Paco, Update, BHD, End of vent - checks OSEMs20220523.txtScreenshot_2022-05-23_13-24-06_IFOaligned_GTRY_still_clipping_but_less.pngPR3position.JPG
[Paco, Yuta]

Prep for closing and pump down.


Aligned IFO to maximize DC levels.

YARM (flashing peak 0.05 with PRM misaligned), XARM (flashing peak 0.06 with PRM misaligned),
Entry  Thu Nov 1 16:42:48 2007, Andrey Rodionov, Summary, Environment, End of Daylight Saving Time this weekend 
Useful information for everyone, as a friendly reminder:

According to the web-page
Entry  Tue Oct 21 18:40:46 2014, manasa, Update, General, End laser fiber setup 
 [Manasa, Diego]
This is our first time touching tables for Frequency Offset Locking. 
The goal was to couple the 1064nm that leaks after the SHG crystal and couple it into the fiber before we run it along the length of the arm. 
Entry  Sun Jan 2 20:46:46 2022, Koji, Update, SUS, End SUS Electronics building PXL_20220103_081133119.jpg
19:00~ Start working on the electronics bench

The following units were tested and ready to be installed. These are the last SUS electronics units and we are now ready to upgrade the
end SUS electronics too.
Entry  Thu Oct 24 04:07:32 2013, Masayuki, Update, Green Locking, End PDH control signal, X-end PDH servo gain optimization outojloop.png
Control signal measurement of end PDH control
The Yarm ALS wasn't robust. Yesterdays night, we found that  suspension kicked by something and that was the reason why the end PDH  control lost
lock. To make sure that the PDH loop itself is robust, I  measured control signals of End PDH loops. When the gain inclease, the  peak at UGF appeared
Entry  Wed Oct 16 19:19:14 2013, Masayuki, Update, Green Locking, End PDH 60 Hz comb noise in YARM comb_noise.pdf
[Manasa, Masayuki]
- Motivation
For PRMI + 2arm, we tried to make the ALS control noise better. As this entry we had huge 60 Hz comb noise
    Reply  Fri May 29 02:05:08 2015, ericq, Update, LSC, End Laser temperatures set 
Both green beatnotes have been found with nominal amplitudes. (X: -30dBm Y: -20dBm), at temperatures which don't
seem to be prone to mode hopping. 

X = 42.64, Y ~40.15

Both arms can lock on ALS, but as Koji mentioned in ELOG
Entry  Mon Sep 20 14:11:40 2021, Koji, Update, BHD, End DAC Adapter Unit D2100647 D2100647_End_DAC_Adapter.pdf
I've uploaded the schematic and PCB PDF for End DAC Adapter Unit D2100647.

Please review the design.


CH1-8 SUS actuation channels.

5CHs out of 8CHs are going to be used, but for future extensions, all the 8CHs are going
Entry  Mon Apr 19 09:17:51 2021, Jordan, Update, VAC, Empty N2 Tanks N2_Pressure.PNG
When I came into the lab this morning, I noticed that both N2 tanks were empty. I had swapped one on Friday (4-16-21) before I left the lab. Looking
at the logs, the right tank (T2) sprung a leak shortly shortly after install. I leak checked the tank coupling after install but did not see a leak. There
could a leak further down the line, possibly at the pressure transducer.
    Reply  Wed Apr 21 12:56:00 2021, Jordan, Update, VAC, Empty N2 Tanks Screenshot_2021-04-21_12-53-26.png
Installed T2 today, and leaked checked the entire line. No issues found. It could have been a bad valve on the tank itself. Monitored T2 pressure for
~2 hours to see if there was any change. All seems ok.




Quote:


    Reply  Wed Apr 28 11:31:40 2021, Jon, Update, VAC, Empty N2 Tanks 
I checked out what happened on c1vac. There are actually two independent monitoring codes running:


The interlock service, which monitors the line directly connected to the valves.
A seaparate convenience mailer, running
as a cronjob, that monitors the tanks.


The interlocks did not trip because the low-pressure delivery line, downstream of the dual-tank
Entry  Wed Sep 1 14:16:21 2021, Jordan, Update, VAC, Empty N2 Tanks 
The right N2 tank had a bad/loose valve and did not fully open. This morning the left tank was just about empty and the right tank showed 2000+ psi on
the gauge. Once the changeover happened the copper line emptied but the valve to the N2 tank was not fully opened. I noticed the gauges were both reading
zero at ~1pm just before the meeting. I swapped the left tank, but not in time. The vacuum interlocks tripped at 1:04 pm today when the N2 pressure to
Entry  Wed Jul 15 19:23:44 2020, gautam, Update, General, Emergency light on in control room 
The emergency lamps above the exit sign on the NW entrance to the control room are on. I tried opening and closing the door, but it remains on. Probably
nothing to worry about, but noting here anyway.
    Reply  Wed Jul 15 19:51:51 2020, Koji, Update, General, Emergency light on in control room 
It happened before too. Doesn't it say it has occasional self-testing or something?
    Reply  Wed Jul 15 20:58:40 2020, gautam, Update, General, Emergency light on in control room 
True - it is now not on anymore.




Quote:



It happened before too. Doesn't it say it has occasional self-testing or something?
Entry  Thu Aug 16 18:59:18 2012, Jenne, Update, SAFETY, Emergency Exit door unlocked again 
Koji just found the emergency exit door unlocked again.  NOT GOOD.
We have determined that if you use the emergency door to enter
the lab, it leaves the door unlocked, unless you go back outside and deliberately lock it.  This means that someone has been using
Entry  Mon Jan 4 17:21:30 2010, Jenne, Configuration, IOO, Elusive Mode Matching Solution found! Awesome_MM_Solution.png
I think I have finally found a Mode Matching solution for our new Input Mode Matching
Telescope!  And after looking at the layout diagram with Koji and Raffaele, it seems like all of the optics will fit into the chambers
/ onto the tables (not true as of last week). 
    Reply  Wed Jan 6 03:44:41 2010, Koji, Configuration, IOO, Elusive Mode Matching Solution found! 
I am in the way to get a reasonable optical layout.
Please calculate the final results with the following conditions.
"Result" = 
Entry  Tue Aug 24 06:34:01 2010, Alastair, Update, General, Elog... 
...was down.  Have restarted it.
Entry  Tue Feb 2 18:15:47 2010, Alberto, Update, elog, Elog restarted it 
 Zach made me notice that the elog had crashed earlier on this afternoon. 
I just restarted it with the restarting script.
Instructions on how to run the last one are now in the wiki page. Look on the "How To" section, under "How to restart the elog".
Entry  Tue Nov 30 12:10:44 2010, josephb, Update, elog, Elog restarted again 
The elog seemed to be down at around 12:05pm.  I waited a few minutes to see if the browser would connect, but
it did not.
I used the existing script in /cvs/cds/caltech/elog/ (as opposed to Zach's new on in elog/elog-2.8.0/) which also
Entry  Wed Jan 19 10:31:24 2011, josephb, Update, elog, Elog restarted again 
Elog wasn't responding at around 10 am this morning.  I killed the elogd process, then used the restart script.
Entry  Fri Nov 6 18:02:22 2009, josephb, Update, Computers, Elog restarted 
While I was writing up an elog entry, the elog died again, and I restarted it.  Not sure what caused it to die since no one was uploading to it
at the time.
Entry  Mon Feb 23 15:04:10 2015, Zach, Update, General, Elog restarted 
The elog crashed while I was creating an entry to the Cryo log. I restarted it with the start-elog.csh
script.
Entry  Wed Mar 31 10:34:02 2010, josephb, Update, elog, Elog not responding this morning 
When I went to use the elog this morning, it wasn't responding.  I killed the process on nodus, and then restarted, per the 40m wiki instructions.
Entry  Wed Oct 27 11:52:45 2010, josephb, Update, elog, Elog needed to be restarted 
I had to restart the elog on Nodus because it was no longer responding.
Entry  Fri Dec 5 20:40:38 2008, Yoichi, HowTo, Computers, Elog multi-keyword search 
The current Elog search allows you to look for only one keyword in the text.
You cannot search for two keywords by simply separating them with a white space. 
That is, a search term "abc def" matches a literal "abc def", not a text containing "abc" and "def". 
Entry  Fri Nov 6 00:23:34 2009, Alberto, Configuration, Computers, Elog just rebooted 
The elog just crashed and I rebooted it
Entry  Tue Sep 27 11:43:59 2011, Jenne, Update, elog, Elog has been dying a lot lately... 
WTF?
Entry  Tue Aug 24 14:29:18 2010, josephb, Update, elog, Elog down for 1 minute 
I'm going to take the elog down for one minute and restart it under gdb (using a copy of gdb stolen from fb40m since I couldn't figure out how to install
an old enough version on nodus from source).  The terminal with information is running on Rosalba under the "Phase Noise" panel, so please
don't close it.  Ideally, the next time the elog crashes, I'll have some output indicating why or at least the line in the code.  I can then
Entry  Thu Aug 19 09:52:51 2010, Alastair, Update, Computers, Elog down 
 I restarted it using start-elog-nodus and this worked out fine - even though I did it from Pete's on my phone ;-)
Entry  Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
We want the elog process to run in verbose mode so that we can see what's going. The idea is to track the events that trigger the elog crashes.
Following an entry on the Elog Help Forum, I added this line to the elog starting script start-elog-nodus:
./elogd -p 8080 -c /cvs/cds/caltech/elog/elog-2.7.5/elogd.cfg -D -v > elogd.log 2>&1
    Reply  Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 


    
        
            Quote:
        
        
            
            We want the elog process to run in verbose mode so that we can see what's going. The idea is to track the events that
Entry  Fri Aug 1 15:32:07 2014, ericq, Update, Computer Scripts / Programs, Elog and svn backups 
Koji and Evan have both brought up a good point that we may not be backing up the svn and ELOG properly.
I have modified the rsync.backup script that nodus' cron runs every night that backs up /cvs/cds to what I presume are the tape backups at ldas-cit.ligo.caltech.edu.
Specifically, I added two rsync commands that grab the svn and elog directories from /export/home and copy them to their old locations in /cvs/cds/caltech. This
Entry  Tue Oct 25 21:23:17 2011, Dmass, Bureaucracy, elog, Elog Restarted 
Elog went nonreponsive. SSH'ed into nodus to run restart script. Elog came back ~15 minutes later.
Entry  Fri Aug 20 20:36:05 2010, Alastair, Update, General, Elog 
 Elog was down, I restarted it.
Entry  Fri Jan 18 15:34:37 2019, gautam, Update, Thermal Compensation, Elliptical reflector part number 
Nobody documented this, but here is the part number with mechanical drawings of the elliptical reflector installed at EY: Optiforms
E180. Heater is from Induceramics,
but I can't find the exact part which matches the dimensions of the heater we have (diameter = 3.8mm, length = 30mm), perhaps it's a custom part?
Entry  Wed Oct 8 22:23:43 2008, Yoichi, Configuration, Electronics, Electronics work bench cleanup Cleanup.jpg
Yesterday, I cleaned up the electronics work bench. I figured that keeping the work bench
in order has larger effect on the work efficiency than buying expensive soldering stations. 
Whoever works there should clean up the table after the work to the state shown on 
Entry  Thu Apr 28 22:38:38 2011, Aidan, Update, Green Locking, Electronics schematic for vertex beatbox Canvas_1.pngCanvas_2.png
 With some assistance from Kiwamu and Koji, I've drawn up the electronics design for the Beat Box for the vertex green locking. The Omingraffle
schematic is posted
on the Green Locking Wiki page. It's also attached below. Some final touches are necessary before we can Altium this up.
    Reply  Sat Apr 30 05:14:33 2011, Koji, Update, Green Locking, Electronics schematic for vertex beatbox freq_divider.png
- AC coupling for the comparator circuit of the green locking
In order to relieve the power consumption of the RF buffer, ac coupling circuits have been added.
The ac coupling before the buffer amp helps to relieve the power consumption in the chip. 
Entry  Tue Jul 12 14:56:17 2022, Tomislav, Summary, Electronics, Electronics noise measurements 23x
[Paco, Tomislav]

We measured the electronics noise of the demodulation board, whitening board, and ADC for WFSs, and OPLEV board and ADC for DC QPD in MC2 transmission.
We were using SR785.
    Reply  Wed Jul 13 13:26:44 2022, rana, Summary, Electronics, Electronics noise measurements 
as I said to you yesterday, I don't think image 2a shows the output of the demod board. The
output of the demod board is actually the output connector ON the demod board. What you are showing in 2a, is the signal that goes from the whitening board
to the ADC I believe. I may be msitaken, so please check with Tega for the signal chain.
Entry  Tue Jun 28 18:19:09 2022, Tomislav, Update, Electronics, Electronics noise electronics_noise_spectra.pngerror_signal.png
I measured electronics noise of WFSs and QPD (of the WFS/QPD, whitening, ADC...) by closing PSL and measuring the error signal. It was needed to put
the offset in C1:IOO-MC_TRANS_SUMFILT_OFFSET to 14000 cts (without offset the sum of quadrants would give zero, and 14000 cts is the value when the cavity
is locked). For WFS that are RF, if there is intensity noise at low frequencies, it is not affecting the measurement.
ELOG V3.1.3-