  14855   Fri Aug 23 18:46:17 2019 JonUpdateCDSc1iscaux remaining workI added the list of new c1iscaux channels
to /opt/rtcds/caltech/c1/chans/daq/C0EDCU.ini
  
  14856   Fri Aug 23 19:10:02 2019 JonUpdateCamerasGigE camera server is onlineFollowing the death of rossa, which was
hosting the only working environment for
the 
  
  15093   Wed Dec 11 15:01:57 2019 JonSummaryPSLPMC cavity ringdown measurement[Jon, Yehonathan]

We carried out a set of cavity
ringdown measurements of the PMC. The 1/e
 IMG_0101.jpg 
  15111   Mon Jan 6 15:36:55 2020 JonUpdatePSLAssembly underway for c1psl upgrade[Jon, Yehonathan]

We've begun assembling the
new c1psl Acromag chassis based on Yehonathan's
  
  15114   Tue Jan 7 18:51:51 2020 JonUpdatePSLNew c1psl server assembledI've assembled a new SuperMicro rackmount
machine to replace c1psl. It is currently
set up on the electronics bench.
  
  15125   Wed Jan 15 14:10:28 2020 JonConfigurationPSLNew EPICS database for C1PSL + C1IOOSummary

I have completed the
new EPICS channel database for the c1psl
and c1ioo channels
  
  15140   Wed Jan 22 16:19:47 2020 JonUpdateVACTP3 controller errorsGautam and I debugged a communications
problem with TP3 that was causing its python
service to fail. We traced the problem back
  
  15150   Thu Jan 23 23:07:04 2020 JonConfigurationPSLc1psl breakout board wiringTo facilitate wiring the c1psl chassis
and scripting loopback tests, I've
compiled a distilled spreadsheet with the
 c1psl_feedthrough_wiring.pdf 
  15151   Fri Jan 24 13:56:21 2020 JonUpdateBHDBHD optics specificationsI've started a spreadsheet for the
BHD optics specifications and populated it
with my best initial guesses. There are a
  
  15168   Tue Jan 28 19:12:30 2020 JonConfigurationPSLSpare channels added to c1psl chassisAfter some discussion with Gautam, I decided
to build more spare channels into the new
c1psl machine. This is anticipation of adding
 c1psl_feedthrough_wiring_v2.pdf 
  15176   Thu Jan 30 12:52:10 2020 JonUpdateBHDMetal OMCs procuredLast night Yehonathan and I located the
two steel PMCs in the QIL, with help from
Anchal. They are currently sitting on my
  
  15178   Thu Jan 30 17:31:28 2020 JonUpdatePSLErrant FSS_INOFFSET changeA script I was testing errantly set C1:PSL-FSS_INOFFSET
=> 10 V at about 5:30 pm. I manually reverted
the channel value to 0, but I don't know
  
  15184   Mon Feb 3 15:22:39 2020 JonUpdatePSLc1psl progress/Acromag ADC groundingI tested the c1psl AO channels on the electronics
bench on Friday. While I found all the wiring
to be correct, some of the channels exhibited
  
  15194   Thu Feb 6 21:54:13 2020 JonUpdatePSLc1psl bench testing completeToday I engineered the last piece
of the new c1psl system: the multi-bit
binary output (mbbo) channels that control
  
  15226   Wed Feb 26 21:43:48 2020 JonSummaryBHDProjected IFO noise budget, post-BHD upgradeTo supplement the material presented during
the BHD review, I've put together a projected
noise budget for the 40m. Note these are
 40m_phase_quad.pdf40m_aligo_comp.pdf40m_ampl_quad.pdfnoise_budget.tar 
  15241   Mon Mar 2 23:49:03 2020 JonSummaryBHDProjected IFO noise budget, post-BHD upgradeUpdated noise budget curves, now computed
using the latest version of pygwinc. This
resolves the inconsistency between the gwinc
 40m_phase_quad.pdf40m_ampl_quad.pdf40m_aligo_comp.pdf 
  15244   Tue Mar 3 18:11:05 2020 JonSummaryBHDProjected IFO noise budget, post-BHD upgradeRevised noise estimates, correcting a couple
of factor of 2 and factor of pi errors found
in the coil driver noise calculation. Also
 40m_phase_quad.pdf40m_ampl_quad.pdf40m_aligo_comp.pdf 
  15253   Wed Mar 4 22:38:31 2020 JonUpdatePSLc1psl communications problem resolvedI investigated the problem
reported earlier today with the BIO1 channels.
By logging the systemd messages generated
  
  15256   Thu Mar 5 19:45:23 2020 JonSummaryPSLC1PSL in-situ test resultsWe've completed
almost all of the in-situ testing of the
c1psl channels. During this
 c1psl_feedthrough_wiring_-_By_Connector_(3).pdf 
  15276   Fri Mar 13 20:00:50 2020 JonUpdateComputersLoopback monitoring for slow machinesSummary

Today
I finished implementing loopback monitors
of the up/down state of the slow controls
 Screen_Shot_2020-03-13_at_7.59.55_PM.png 
  15284   Thu Mar 26 17:41:18 2020 JonOmnistructureBHDBHD docs compilationSince there has been a proliferation of
BHD Google docs recently, I've linked
them all from the BHD
  
  15292   Thu Apr 2 16:31:33 2020 JonUpdateCDSC1AUXEY wiring + channel list


Quote:


  
  15294   Fri Apr 3 12:09:53 2020 JonUpdateCDSC1AUXEY wiring + channel list


Quote:


  
  15295   Fri Apr 3 13:40:07 2020 JonUpdateBHDBHD front-end complicationI wanted to pass along a complication pointed
out by K. Thorne re: our plan to use Gen1
(old) Dolphin IPC cards in the new real-time
  
  15299   Tue Apr 7 10:56:39 2020 JonUpdateBHDBHD front-end complication


Quote:


  
  15300   Tue Apr 7 15:30:40 2020 JonSummaryNoiseBudget40m noise budget migrated to pygwincIn the past year, pygwinc has expanded
to support not just fundamental noise calculations (e.g.,
quantum, thermal) but also any number of
  
  15305   Thu Apr 16 21:13:20 2020 JonUpdateBHDBHD optics specificationsSummary

I've generated
specifications for the new BHD optics. This
includes the suspended relay mirrors as
 LO_Beam_Calc-v1.pdfAS_Beam_Calc-v1.pdf 
  15311   Thu Apr 23 09:52:02 2020 JonUpdateCamerasGigE w better NIR sensitivvityNice, and we should also permanently install
the camera server (c1cam)
which is still sitting on the electronics
  
  15334   Fri May 15 09:18:04 2020 JonUpdateBHDBHD telescope designs accounting for ASCHang and I have reanalyzed the BHD telescope
designs, with the goal of identifying
sufficiently non-degenerate locations for
 LOpath.pdfASpath.pdf 
  15379   Sat Jun 6 14:07:30 2020 JonUpdateBHDStock-Part Mode-Matching Telescope OptionSummary

For the initial phase of
BHD testing, we recently discussed whether
the mode-matching telescopes could be built
 ASpathStock.pdfLOpathStock.pdf 
  15382   Mon Jun 8 17:40:22 2020 JonUpdateBHDAstigmatism and scattering plotsMM_total = (MM_vert + MM_horiz) / 2. 

The large astigmatic MM loss in
the LO case is mainly due to the strong LO4
 LOpathStock2.pdf 
  15384   Mon Jun 8 21:45:47 2020 JonUpdateBHDAstigmatism and scattering plotsHmm? T1300364
suggests MM_total = Sqrt(MM_Vert * MM_Horiz)
  
  15386   Tue Jun 9 14:55:43 2020 JonUpdateBHDMM telescope actuation range requirmentsI don't think we ever discussed why
the angular RMS of the ETMs is so much higher
than the ITMs. Maybe that's a separate
  
  15389   Thu Jun 11 09:37:38 2020 JonUpdateBHDConclusions on Mode-Matching TelescopesAfter further astigmatism/tolerance analysis
[ELOG
15380, 15387]
  
  15402   Tue Jun 16 13:35:03 2020 JonUpdateVACTemporary vac fix / IFO usable again[Jon, Jordan, Koji]

Today Jordan reconfigured the vac
system to allow pumping of the main volume
 Pumpdown.png 
  15406   Thu Jun 18 11:00:24 2020 JonUpdateVACQuestions/comments on vacuum


Quote:


  
  15408   Thu Jun 18 14:13:03 2020 JonUpdateVACQuestions/comments on vacuumI agree there
were MEDM fields, but I can't find any
  
  15412   Thu Jun 18 22:33:57 2020 JonOmnistructureVACVac hardware purchase listReplacement Hardware Purchase List

I've
created a purchase
list of hardware needed to restore the aging
  
  15413   Fri Jun 19 07:40:49 2020 JonUpdateVACQuestions/comments on vacuumI think we should discuss interlock possibilities at
a 40m meeting. I'm reluctant to make
the system more complicated, but perhaps
  
  15421   Mon Jun 22 10:43:25 2020 JonConfigurationVACVac maintenance at 11 amThe vac system is going down at 11 am today
for planned maintenance:


Re-install the repaired
  
  15424   Mon Jun 22 20:06:06 2020 JonConfigurationVACVac maintenance completeThis work is finally complete. The dry
pump replacement was finished quickly but
the controls updates required some substantial
 Pumpdown-6-22-20.png 
  15446   Wed Jul 1 18:03:04 2020 JonConfigurationVACUPS replacements​I looked into how the new UPS devices
suggested by Chub would communicate with
the vac interlocks. There are several possible
  
  15456   Mon Jul 6 15:10:40 2020 JonSummaryBHD40m --> A+ BHD design analysisAs suggested last week, Hang and I have
reviewed the A+ BHD status
(DRD, CDD, and reviewers' comments) and
  
  15462   Thu Jul 9 16:02:33 2020 JonHowToCDSProcedure for setting up BHD front-endsHere is the procedure for setting up the
three new BHD front-ends (c1bhd, c1sus2,
c1ioo - replacement). This plan is based
  
  15465   Thu Jul 9 18:00:35 2020 JonConfigurationVACUPS replacementsChub has placed the order for two new UPS
units (115V for TP2/3 and a 220V version
for TP1).
  
  15499   Thu Jul 23 15:58:24 2020 JonSummaryVACVacuum controls refurbishment planThis year we've struggled with vacuum
controls unreliability (e.g., spurious interlock
triggers) caused by decaying hardware. Here
  
  15501   Mon Jul 27 15:48:36 2020 JonSummaryVACVacuum parts orderedTo carry out the next steps of the vac
refurbishment plan [ELOG
15499], I've ordered parts necessary
  
  15502   Tue Jul 28 12:22:40 2020 JonUpdateVACVac interlock test today 1:30 pmThis afternoon Jordan is going to carry
out a test of the V4 and V5 hardware
interlocks. To inform the interlock improvement
  
  15504   Tue Jul 28 14:11:14 2020 JonUpdateVACVac interlock test today 1:30 pmThis test has been completed. The IFO configuration
has been reverted to nominal.

For future reference: yes,
  
  15525   Fri Aug 14 10:03:37 2020 JonUpdateCDSTiming distribution slot availabilityThat's great news we
won't have to worry about a new timing
fanout for the two new machines, c1bhd and
  
ELOG V3.1.3-