  17181   Mon Oct 10 10:14:05 2022 ChrisUpdateCDSCDS Upgrade remaining issuesList of remaining tasks to iron out various
wrinkles with the upgrade:


Complete the upgrade on
 timingslip.pngadctimingglitch.png 
  17182   Tue Oct 11 10:58:36 2022 ChrisUpdateCDSCDS Upgrade remaining issuesThe original fb1 now boots from its new
drive, which is installed in a fixed drive
bay and connected via SATA. There are no
 PXL_20221010_212415180.jpg 
  17192   Sat Oct 15 17:22:56 2022 ChrisUpdateOptimal ControlIMC alignment controller testing[Anchal, Radhika, Jamie, Chris]

We conducted a test of three alternative
controllers for the IMC pitch DOFs on Friday.
 180.png066.png202.png 
  17193   Mon Oct 17 11:57:27 2022 ChrisOmnistructureCDSTiming system monitoringI started a GPS timing monitor script,
/opt/rtcds/caltech/c1/Git/40m/scripts/cds/tempusTimingMon/tempusTimingMon.py,
which runs inside a docker container on optimus.
 timing.png 
  17226   Thu Nov 3 17:01:47 2022 ChrisUpdateCDSSLwebview fixedThe simulink webview generation cronjob
on megatron was not working, apparently due
to a matlab license problem. I switched it
  
  17262   Fri Nov 11 20:59:13 2022 ChrisFrogsComputer Scripts / ProgramsFSS SLOW servo not runningThe problem with trends was due to the
epics data collection process (standalone_edc)
that runs on c1sus. When all the FEs were
  
  17314   Sun Nov 27 15:30:22 2022 ChrisUpdateOptimal ControlIMC alignment controller testingFive more mode cleaner alignment controllers
were tested this morning (remotely). These
were designed to run in tandem with the standard
  
  17333   Sun Dec 4 10:03:02 2022 ChrisUpdateOptimal ControlIMC alignment controller testingAnother five
mode cleaner alignment controllers were tested
last night (remotely), running in tandem
  
  1694   Wed Jun 24 10:53:34 2009 Chris ZimmermanUpdateGeneralWeek 1/2 UpdateI've spent most of the last week doing
background reading; fourier transforms, shm,
e&m, and other physics that I didn't
  
  1710   Wed Jul 1 10:56:42 2009 Chris ZimmermanUpdateGeneralWeek 2/3 UpdateI spent the last week working a lot with
the differences between a basic Michelson
readout and the new one as a displacement
  
  1720   Wed Jul 8 11:05:40 2009 Chris ZimmermanUpdateGeneralWeek 3/4 UpdateThe last week I've spent mostly working
on calculating shot noise and other sensitivities
in three michelson sensor setups, the standard
 NSD_Displacement.png 
  1750   Wed Jul 15 12:44:28 2009 Chris ZimmermanUpdateGeneralWeek 4/5 UpdateI've spent most of the last week working
on finishing up the UCSD calculations, comparing
it to the EUCLID design, and thinking about
 Comparison.pdf 
  1779   Wed Jul 22 16:15:52 2009 Chris ZimmermanUpdateGeneralWeek 5/6 UpdateThe last week I've started setting up the
HeNe laser on the PSL table and doing some
basic measurements (Beam waist, etc) with
 Beam_Scan.jpgLong_Range_Michelson_Setup_1_-_Actual.pngNSD_Displacement.png 
  14305   Mon Nov 19 14:59:48 2018 ChubUpdateVACVent 81Vent 80 is nearly complete; the instrument
is almost to atmosphere.  All four ion
pump gate valves have been disconnected,
  
  14350   Thu Dec 13 10:03:07 2018 ChubUpdateGeneralOMC chamberBob, Aaron, and I removed the door from
the OMC chamber this morning.  Everything
went well.
  
  14364   Tue Dec 18 11:42:40 2018 ChubUpdateGeneralAcromag box wiredThe Auxiliary DAQ Chassis, or Acromag box,
is now wired and ready for testing. 
I will be sorting the cables at the vacuum
  
  14395   Thu Jan 10 11:32:40 2019 ChubUpdateVACManual valve interfaced with CDSConnected the manual gate valve status
indicator to the Acromag box this morning. 
Labeled the temporary cable (a 50' 9p
  
  14420   Tue Jan 29 16:12:21 2019 ChubUpdate  The foam in the cable tray wall passage
had been falling on the floor in little bite-sized
pieces, so I investigated and found a fiber
  
  14437   Wed Feb 6 10:07:23 2019 ChubUpdate pre-construction inspectionThe Central Plant building will be undergoing
seismic upgrades in the near future. 
The adjoining north wall along the Y arm
  
  14572   Thu Apr 25 10:13:15 2019 ChubUpdateGeneralAir Handler Out of CommissionThe air handler on the roof of the 40M
that supplies the electronics shop and computer
room is out of operation until next week. 
  
  14601   Fri May 10 13:00:25 2019 ChubUpdateGeneralcrane inspection completeThe 40M jib cranes all passed inspection!  20190510_110245.jpg 
  14749   Thu Jul 11 13:08:36 2019 ChubSummaryCDSP2 interface boardIt's nice and compact, and the cost
of new 15-pin DSUB cables shouldn't be
a factor here.  What does the 15p cable
  
  14869   Tue Sep 10 16:10:40 2019 ChubUpdate Rack UpdateStill removing old cable, terminal blocks
and hardware.  Once new strain reliefs
and cable guides are in place, I will need
 20190910_154018.jpg20190910_154006.jpg 
  15222   Mon Feb 24 08:36:32 2020 ChubUpdateGeneralHVAC repairThe HVAC people replaced a valve and repaired
the pneumatic plumbing on the roof air handler. 
Temperature has been stable during the day
  
  15304   Wed Apr 15 15:15:17 2020 ChubUpdateVACnitrogen cylinders deliveredFour nitrogen cylinders replaced the empties
in the rack at the west entrance.  Additionally,
Airgas will now deliver only once a week.
  
  15314   Thu Apr 30 07:29:01 2020 ChubUpdateVACN2 delivered.Hi All,

The new nitrogen cylinders were
delivered to the rack at the west entrance.
  
  15416   Fri Jun 19 11:02:10 2020 ChubUpdateGeneralcustom feedthrough flanges are here!The four 4x25DSUB and single 8x25DSUB feedthrough
flanges have arrived and will be picked up
from the dock and brought to the 40M lab.
  
  15680   Tue Nov 17 13:24:40 2020 ChubUpdateGeneralbig UPS on the wayOrdered 11/16 from CDW, on PO# S492940, the
high voltage Tripp Lite SMART5000XFMRXL 
  
  15722   Thu Dec 10 11:07:24 2020 ChubUpdateVACUPS faultIs that a fault code that you can decipher
in the manual, or just a light telling you
nothing but your UPS is dead?
  
  15723   Thu Dec 10 11:17:50 2020 ChubUpdateVACUPS faultI can't find anything in the manual
that describes the nature of the FAULT message. 
In fact, it's not mentioned at all. 
  
  16058   Wed Apr 21 05:48:47 2021 ChubUpdateGeneralPSL HEPA MaintenanceYikes!  That's ONE filter. 
I'll get another from storage.
  
  16074   Thu Apr 22 14:41:55 2021 ChubUpdatePSLNew HEPA speed controlWhen adjusting the blower speed, give the
blower at least 30 seconds to speed up or
slow down to the set speed.  The flywheel
 40M_PSL_HEPA.jpg 
  16121   Wed May 5 13:05:07 2021 ChubUpdateGeneralchassis delivery from De LeoneAssembled chassis from De Leone placed
in the 40 Meter Lab, along the west wall
and under the display pedestal table. 
 de_leone_del_5-5-21.jpg 
  16155   Mon May 24 08:38:26 2021 ChubUpdateElectronics18-bit AI, 16-bit AI and 16-bit AA- High priority units: 2x 18AI / 1x 16AI
/ 3x 16AA

All six are reworked and on the
  
  16160   Tue May 25 17:08:17 2021 ChubUpdateElectronicschassis rework complete!All remaining chasses have been reworked
and placed on the floor along the west wall
in Room 104. 
 40M_chassis_reworked_5-25-21.jpg 
  16472   Wed Nov 17 07:32:48 2021 ChubUpdateGeneralwire clamp plate modThis will be difficult to modify with the
magnets and dumbells in place.  Even
if someone CAN clamp this piece into an endmill
  
  16513   Thu Dec 16 15:04:12 2021 ChubUpdateElectronicsITMX feedthroughs and in-vac cables installedThe ITMX 10" flange with four DSUB-25
feedthroughs has been install with the cables
connected at the in-vac side.  See photo;
 ITMX_feedthrough_install_12-16-21.jpg 
  16644   Thu Feb 3 14:47:12 2022 ChubUpdateElectronicsnew UPS in placeReceived the new 1100VA APC UPS today and
placed it at the bottom of the valve rack. 
I'd connected the battery and plugged
  
  16646   Fri Feb 4 10:04:47 2022 ChubUpdateGeneraldish soap and clean scrub sponges!Bought dish soap and scrub sponges today
and placed them under the sink with the other
dish supplies.
 40m_supplies.jpg 
  16921   Wed Jun 15 17:12:39 2022 CiciSummaryGeneralPreparation for AUX Loop Characterization[Deeksha, Cici]

We went to the end Xarm station
and looked at the green laser setup and electronics.
  
  16926   Thu Jun 16 19:49:48 2022 CiciUpdateGeneralUsing the SR785[Deeksha, Cici]

We used a python script to collect
data from the SR785 remotely. The SR785 is
  
  16933   Tue Jun 21 14:59:22 2022 CiciSummaryGeneralAUX Transfer Function Loop Exploration[Deeksha, Cici]

We learned about the auxillary
laser control loop, and then went into the
  
  16950   Mon Jun 27 13:25:50 2022 CiciUpdateGeneralCharacterizing the Transfer Loop[Deeksha, Cici]

We first took data of a simple
low pass filter, and attempted to perform
 TF_measurement_b.pngtransfer_function_mag_fit.pngtransfer_function_phase_fit.pngcontrol_flow.png 
  16955   Tue Jun 28 16:26:58 2022 CiciSummaryGeneralVector fitting open loop transfer function/Audio cancellation of optical table enclosure[Deeksha, Cici]

We attempted to use vectfit to
fit our earlier transfer function data, and
 vectfit_firstattempt.pngTFSR785_28-06-2022_161937.pdfenclosure_open.MP4enclosure_closed.MP4 
  17051   Mon Aug 1 17:19:39 2022 CiciSummaryGeneralRPitaya Data on Jupyter NotebookHave successfully plotted data from the
Red Pitaya on Jupyter Notebook! Have
lost years of my life fighting with PyQt.
  
  17070   Wed Aug 10 15:33:59 2022 CiciUpdateGeneralWorking Red Pitaya VNATL;DR: I am now able to inject a swept
sine and measure a transfer function with
python on my Red Pitaya! Attached is
 rpi_vna_test.pdf 
  17076   Thu Aug 11 17:15:33 2022 CiciUpdateGeneralMeasuring AUX Laser UGF with Red PitayaTL;DR: Have successfully measured the UGF
of the AUX laser on my Red Pitaya! Attached
is one of my data runs (pdf + txt file). 
 rpi_OLG_2022_08_11_16_51_53.pdfrpi_OLG_2022_08_11_16_51_53.txt 
  17087   Wed Aug 17 10:27:49 2022 CiciUpdateGeneralLocking X-arm AUX laserTL;DR: Got the x-arm aux laser locked again
and took more data - my fit on my transfer
functions need improvement and my new method
 rpi_OLG_2022_08_16_17_00_41.pdfrpi_OLG_2022_08_16_17_01_21.pdf 
  17090   Thu Aug 18 16:35:29 2022 CiciUpdateGeneralUGF linked to optical gain!TL;DR: When the laser has good lock, the
OLTF moves up and the UGF moves over!

-----------------------------------------------------------
 rpi_OLG_2022_08_17_18_03_52.pdfrpi_OLG_2022_08_17_18_00_50.pdf 
  17101   Wed Aug 24 10:49:43 2022 CiciUpdateGeneralMeasuring DFD output/X-arm laser PZT TF with MokuWe measured the TF of the X-arm laser PZT
using the Moku so we can begin fitting to
that data and hopefully creating a digital
 AUX_PZT_Actuator_nofit.pdf 