  13442   Tue Nov 21 23:47:51 2017 gautamConfigurationComputersnodus post OS migration adminI restored the nodus crontab (copied over
from the Nov 17 backup of the same at /opt/rtcds/caltech/c1/scripts/crontab/crontab_nodus.20171117080001.
There wasn't a crontab, so I made one
  
  13443   Wed Nov 22 00:54:18 2017 johannesOmnistructureComputersSlow DAQ replacement computer progressI got the the SuperMicro 1U server box
from Larry W on Monday and set it up in the
CryoLab for initial testing.
  
  13444   Wed Nov 22 05:41:32 2017 ranaUpdateOptical LeversOplev "noise budget"For the OL NB, probably don't have
to fudge any seismic noise, since that's
a thing we want to suppress. More important
  
  13445   Wed Nov 22 11:51:38 2017 gautamConfigurationComputersnodus post OS migration adminConfirmed that this crontab is running
- the daily backup of the crontab seems to
have successfully executed, and there is
  
  13446   Wed Nov 22 12:13:15 2017 KiraUpdatePEMseismometer can testingUpdated some values, most importantly,
the k-factor. I had assumed that it was in
the correct units already, but when converting
 cooling_fit_1.png 
  13447   Wed Nov 22 14:47:03 2017 KiraUpdatePEMseismometer can testingFor the insulation, I have decided to use
this
one (Buna-N/PVC Foam Insulation
  
  13448   Wed Nov 22 15:29:23 2017 gautamUpdateOptical LeversOplev "noise budget"[steve,
gautam]

What is the best way to set this
 OplevTest.jpg 
  13449   Wed Nov 22 16:40:00 2017 KojiUpdateOptical LeversOplev "noise budget"You may want to consult with the cryo Q
people (Brittany, Aaron) for a Si QPD. If
you want the same QPD architecture, I can
  
  13450   Wed Nov 22 17:52:25 2017 gautamUpdateOptimal ControlVisualizing cost functionsI've attempted to visualize the various
components of the cost function in the way
I've defined it for the current iteration
 globalCosts.pdf 
  13451   Wed Nov 22 19:20:01 2017 ranaUpdateOptical LeversOplev "noise budget"too complex; just shoot straight from the
HeNe to the QPD. We lower the gain of the
QPD by changing the resistors; there's
  
  13452   Wed Nov 22 23:56:14 2017 gautamUpdateOptical LeversOplev "noise budget"Do not turn
on BS/ITMY/SRM/PRM Oplev servos without reading
  
  13453   Thu Nov 23 18:03:52 2017 gautamUpdateOptical LeversOplev "noise budget"Here are a couple of preliminary plots
of the noise from a 20minute stretch of data
- the new curve is the orange
 ITMY_P_noise.pdfITMY_Y_noise.pdf 
  13454   Sun Nov 26 19:38:40 2017 SteveUpdateVACTP3 drypump replaced againThe TP3 foreline pressure was 4.8 Torr,
50K rpm 0.54A and 31C........Maglev rotation
normal 560 Hz.......    IFO pressure
 after_replacement.png 
  13455   Tue Nov 28 16:02:32 2017 ranaUpdatePEMseismometer can testingI've ordered 4 of these from McMaster.
Should be delivered to the 40m by noon tomorrow.

  
  13456   Tue Nov 28 17:27:57 2017 awadeBureaucracyCalibration-RepairSR560 return, still not chargingI brought a bunch of SR560s over for repair
from Bridge labs. This unit, picture attached
(SN 49698), appears to still not be
 96B6ABE6-CC5C-4636-902A-2E5DF553653D.jpegimage.jpg 
  13457   Wed Nov 29 15:33:16 2017 ranaUpdatePSLPMC lockingPMC wasn't locking. Had to power down
c1psl. Did burt restore. Still not great.

I think many of the readbacks on
  
  13458   Wed Nov 29 21:40:30 2017 johannesOmnistructureComputersSlow DAQ replacement computer progress[Aaron, Johannes]

We
configured the AtomServer for the Martian
  
  13459   Thu Nov 30 10:38:39 2017 SteveUpdateVACannuloses are not pumpedAnnuloses are not pumped for 30 days, since
TP2 failed.  IFO pressure 7e-6 Torr
it,  Rga 2.6e-6 Torr
 AnnulosesNotPumped.png 
  13460   Fri Dec 1 17:09:29 2017 Udit KhandelwalSummaryGeneral Current objectives and statuses:


CAD Model of 40m lab (facility,
chambers, invacuum components etc)

Status:
  
  13461   Sun Dec 3 05:25:59 2017 gautamConfigurationComputerssendmail installed on nodus Pizza mail didn't go out last weekend
- looking at logfile, it seems like the "sendmail"
service was missing. I installed sendmail
  
  13462   Sun Dec 3 17:01:08 2017 KojiConfigurationComputerssendmail installed on nodus An email has come at 5PM on Dec 3rd.

 
  
  13463   Mon Dec 4 22:06:07 2017 johannesOmnistructureComputersAcromag XEND progressI wired up the power distribution, and
ethernet cables in the Acromag chassis today.
For the time being it's all kind of loose
  
  13464   Thu Dec 7 11:14:37 2017 johannesHowToComputer Scripts / ProgramsLots of red on the FE status screenSince we're getting ready to put the
replacement slow DAQ for c1auxex in I wanted
to bring the IFO back to operating condition
 22.png 
  13465   Thu Dec 7 15:02:37 2017 KojiHowToComputer Scripts / ProgramsLots of red on the FE status screenOnce a realtime machine was rebooted, it
did not come back. I suspect that the diskless
hosts have a difficulty to boot up.
 DSC_0552.JPG 
  13466   Thu Dec 7 15:46:31 2017 johannesHowToComputer Scripts / ProgramsLots of red on the FE status screen[Koji, Johannes]

The issue was partially fixed and
the interferometer is in workable condition
 04.png 
  13467   Thu Dec 7 16:28:06 2017 KojiUpdateIOOLots of red on the FE status screenOnce the RT machines were back, we launched
only the five IOPs. They had bunch of red
lights, but we continued to run essential
  
  13468   Thu Dec 7 22:24:04 2017 johannesOmnistructureComputersAcromag XEND progress 




 sourcing_input.pngsourcing_to_sourcing_with_common_supply.pngIMG_20171207_193128928.jpg 
  13469   Fri Dec 8 12:06:59 2017 johannesOmnistructureComputersc1auxex2 ready - but need more cablesThe new slow machine c1auxex2
is ready to deploy. Unfortunately we don't
have enough 37pin DSub cables to connect
  
  13470   Fri Dec 8 23:31:31 2017 johannesFrogsASSc1ass slow channel offloading scripts with small While staring at epics records all day
I noticed something about the PIT/YAW offset
sliders and ASS offset offloading to slow
  
  13471   Wed Dec 13 09:49:23 2017 johannesUpdateASSwiring diagramI attached a wiring schematic from the
slow DAQ to the eurocrate modules. Of these,
pins 1-32 (or 1A-16C) and pins 33-64 (17A-32C)
 1Y9.pdf 
  13472   Wed Dec 13 17:46:08 2017 Udit KhandelwalSummaryGeneralSummary of Current Tasks40m
Lab CAD

1. 40m_bldg.dwg has 2D drawing
 top_view.pngisometic_view.png 
  13473   Thu Dec 14 00:32:56 2017 johannesUpdateASSAcromag new crate; c1auxex2 configured as gateway server for acromagThis splicing in of fast binary channels
we discussed at yesterday's and today's
meetings is getting messy with the current
 fp_mod_4U.pdfIMG_20171213_171541850_HDR.jpg 
  13474   Thu Dec 14 07:07:09 2017 ranaUpdateIOOLots of red on the FE status screenI had to key the c1psl crate to get the
PMC locking again. Without this, it would
still sort of lock, but it was very hard
  
  13475   Thu Dec 14 08:59:17 2017 SteveUpdateGeneralwe are here   8_days.png 
  13476   Thu Dec 14 19:33:20 2017 gautamFrogsASSc1ass slow channel offloading scripts with small I
don't think this is really a problem
  
  13477   Thu Dec 14 19:41:00 2017 gautamUpdateCDSCDS recovery, NFS woes[Koji, Jamie(remote), gautam]

Summary:
The CDS system seems to be back up and functioning.
 CDS_14Dec2017.pngCDS_errors.png 
  13478   Thu Dec 14 23:27:46 2017 johannesUpdateDAQaux chassis designMade a front and back panel and slot panels
for DSub and IDC breakouts. I want to send
this out soon, are there any comments? Preferences
 auxdaq_40m_4U_front.pdfauxdaq_40m_4U_rear.pdfauxdaq_40m_4U_DSub37x2.pdfauxdaq_40m_4U_IDC50.pdf 
  13479   Fri Dec 15 00:26:40 2017 johannesUpdateCDSRe: CDS recovery, NFS woes


Quote:


  
  13480   Fri Dec 15 01:53:37 2017 jamieUpdateCDSCDS recovery, NFS woes


Quote:


  
  13481   Fri Dec 15 11:19:11 2017 gautamUpdateCDSCDS recovery, NFS woesLooking at the dmesg on c1iscex for example,
at least part of the problem seems to be
associated with FB1 (192.168.113.201, see
 NFS.pngMCautolocker.png 
  13482   Fri Dec 15 17:05:55 2017 gautamUpdatePEMTrillium seismometer DC offsetYesterday, while we were bringing the CDS
system back online, we noticed that the control
room wall StripTool traces for the seismic
 Trillium.png 
  13483   Fri Dec 15 18:23:03 2017 ranaUpdatePEMTrillium seismometer DC offsetUVW refers to the 3 internal, orthogonal
velocity sensors which are not aligned with
the vertical or horizontal directions. XYZ
  
  13484   Fri Dec 15 18:24:46 2017 ranaSummaryOptical LeversPRMToday Angelina and I looked at the PRM
OL with an eye towards installing a 2nd QPD.
We want to try out 
  
  13485   Fri Dec 15 19:09:49 2017 gautamUpdateIOOIMC lockloss correlated with PRM alignment?Motivation:

To
test the hypothesis that the IMC lock duty
 PSL_layout.JPG 
  13486   Mon Dec 18 16:45:44 2017 gautamUpdateIOOIMC lockloss correlated with PRM alignment?I stopped the test earlier today morning
around 11:30am. The log file is located at
  
  13487   Mon Dec 18 17:48:09 2017 ranaUpdateComputersrossa: SL7.3 upgrade continuesFollowing instructions
from LLO-CDS fo the rossa upgrade. Last time
there were some issues with not being to
  
  13488   Mon Dec 18 20:37:18 2017 gautamUpdatePSLPMC MEDM cleanupThere are fewer lies on this screen now.
For reference, the details of the electronics
modifications made are in this
 PMC_revamped.png 
  13489   Wed Dec 20 00:43:58 2017 KevinSummaryGeneralDAC noise contribution to squeezing noise budgetGautam and I looked into the DAC noise
contribution to the noise budget for homodyne
detection at the 40m. DAC noise is currently
 40m_squeezing.pdf40mDAC_squeezing.pdf 
  13490   Thu Dec 21 19:25:48 2017 KevinSummaryGeneralDAC noise contribution to squeezing noise budgetGautam and I redid our calculations, and
the updated plot of squeezing as a function
of DAC current noise per coil is shown in
 40mDAC_squeezing.pdf 
  13491   Fri Dec 22 09:40:19 2017 ranaSummaryGeneralDAC noise contribution to squeezing noise budget
Should not count the ITMs. On those
we can use big resistors / filters to cut
out the noise.
For the initial
  
ELOG V3.1.3-