40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 266 of 341  Not logged in ELOG logo
    Reply  Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic  ETMY-ULhistory.png
    Reply  Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic  
    Reply  Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction ETMY_BounceSpectra_26Aug2016_1.pdf
    Reply  Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic  ETMY_UL_problematic.png
    Reply  Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic  satelliteBox.png
    Reply  Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics IMG_6840.JPGIMG_6841.JPG
    Reply  Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling IMG_3051.JPG42.png
    Reply  Tue Aug 30 09:51:37 2016, Steve, Update, SUS, the chamber HEPA tents are back ETMYtentHEPA.jpgvented_for_60_days.png
    Reply  Tue Aug 30 15:44:28 2016, Steve, Update, SUS, wire standoffs update 
    Reply  Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed IMG_3052.JPGSRM_sensor_level_comp.pngETMY_BounceSpectra_30Aug2016.pdf
    Reply  Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging 
    Reply  Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green  
    Reply  Wed Aug 31 23:01:02 2016, gautam, Update, SUS, the chamber HEPA tents are back 
    Reply  Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick ITMY_SENSOR_UL.pngspareSatAmp.jpg
    Reply  Thu Sep 1 15:28:01 2016, rana, Update, Electronics, Acoustic Tab and Amp Suspension 
    Reply  Thu Sep 1 15:40:52 2016, Steve, Update, SUS, HEPAs on each chamber door chamberDoorHepaEA.pdf
    Reply  Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments 
    Reply  Thu Sep 1 17:25:02 2016, Praful, Update, Electronics, Acoustic Tab and Amp Suspension 
    Reply  Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
    Reply  Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm 
    Reply  Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 03.png56.png
    Reply  Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling 
Entry  Fri Sep 2 21:16:45 2016, rana, Update, Electronics, Satellite Amplifier 
    Reply  Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments 
    Reply  Mon Sep 5 21:05:06 2016, rana, Update, Electronics, Satellite Amplifier osempd.pdf
    Reply  Tue Sep 6 00:14:14 2016, gautam, Update, Electronics, Satellite Amplifier osempdComparison.pdf
    Reply  Tue Sep 6 18:21:13 2016, rana, Update, SUS, OSEM issues PRMswing.png
    Reply  Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick 
    Reply  Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber IMG_3137.JPGIMG_3143.JPGIMG_3142.JPGIMG_3148.JPG
    Reply  Tue Sep 6 20:52:42 2016, gautam, Update, SUS, OSEM issues P9060254.JPG
    Reply  Wed Sep 7 17:23:26 2016, gautam, Update, SUS, PRM LR fixed for now IMG_3208.JPGIMG_3211.JPG
Entry  Wed Sep 7 18:00:47 2016, Lydia, Update, General, Acromag Progress 
    Reply  Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible 
    Reply  Fri Sep 9 11:24:15 2016, Steve, Update, safety, safety training 
    Reply  Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers 
    Reply  Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment Osamu.JPG
    Reply  Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment IMG_3273.JPGIMG_3275.JPG
    Reply  Mon Sep 12 17:54:24 2016, Steve, Update, VAC, pumpdown 79 
Entry  Mon Sep 12 20:15:22 2016, Lydia, Update, SUS, Diagonalization in air ITMY_fit.jpgBS_diag.jpg
Entry  Mon Sep 12 20:19:25 2016, Lydia, Update, General, MC REFL beam splitter not replaced 
    Reply  Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned 
    Reply  Tue Sep 13 17:47:04 2016, Steve, Update, VAC, pumpdown 79 completed 
Entry  Tue Sep 13 19:02:56 2016, Teng, Update, General, ITMX sensor 47.png34.png
    Reply  Tue Sep 13 19:18:43 2016, Lydia, Update, SUS, Diagonalization in air ITMY_diag.jpg38.png
    Reply  Wed Sep 14 09:33:54 2016, Steve, Update, General, ITMX magnets are stucked ITMXmagStuck.png
    Reply  Wed Sep 14 09:44:09 2016, Steve, Update, VAC, pumpdown 79 completed pd79.pngpd79d2.jpgCCcg.jpg
    Reply  Wed Sep 14 19:41:23 2016, Johannes, Update, General, PSL back to high power 
    Reply  Wed Sep 14 20:05:32 2016, Lydia, Update, General, ITMX magnets are stucked 
    Reply  Wed Sep 14 20:27:03 2016, Lydia, Update, SUS, Diagonalization ETMY_diag.png
    Reply  Thu Sep 15 10:36:32 2016, Steve, Update, VAC, pumpdown 79 day 3 vent78for73d.png
ELOG V3.1.3-