40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 265 of 341  Not logged in ELOG logo
Entry  Thu Jun 3 00:47:17 2010, Kevin, Update, PSL, 2W Beam Profile of Second Reflected Beam profile_2nd.png
Entry  Wed Jun 23 18:05:00 2010, Koji, Configuration, PSL, FSS SLOWDC should be ~-4.0 C1PSL_FSS.png
    Reply  Wed Jun 23 23:08:30 2010, rana, Configuration, PSL, FSS SLOWDC should be ~-4.0 
Entry  Wed Jul 7 00:15:29 2010, tara,Rana, Summary, PSL, power spectral density from RefCav transmitted beam  RIN_rftrans.pngtara.png
    Reply  Wed Jul 7 10:42:29 2010, Koji, Summary, PSL, power spectral density from RefCav transmitted beam  
Entry  Fri Jul 9 20:16:19 2010, rana, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc. 
    Reply  Sun Jul 11 20:11:48 2010, rana, Summary, PSL, RC trend after the insulation removal rc.png
    Reply  Mon Jul 12 14:22:36 2010, Jenne, Summary, PSL, Things I did to the PSL today: Refcav, PMC, cameras, etc. 
Entry  Tue Jul 13 21:04:49 2010, tara,rana, Summary, PSL, Transfer function of FSS servo TF_FSS_ser.png
    Reply  Thu Jul 15 19:27:04 2010, rana, Summary, PSL, RC trend after the insulation removal Untitled.pnga.pngb.png
Entry  Fri Jul 16 20:25:52 2010, Megan, Update, PSL, Reference Cavity Insulation DSC_2271.JPGDSC_2266.JPG
    Reply  Fri Jul 16 23:53:27 2010, Rana, Update, PSL, Reference Cavity Insulation 
Entry  Wed Jul 21 15:43:38 2010, Megan, Summary, PSL, Copper Layer Thickness on the Reference Cavity 
Entry  Thu Jul 22 14:07:20 2010, kiwamu, Update, PSL, PSL front end machine PSL-PMC2010-07-22.png
    Reply  Thu Jul 22 15:59:29 2010, Alberto, Update, PSL, PSL front end machine 
    Reply  Thu Jul 22 18:18:54 2010, Alberto, Update, PSL, Problem Solved 
    Reply  Fri Jul 23 00:13:11 2010, rana, Update, PSL, Problem NOT REALLY Solved 
Entry  Fri Jul 23 08:15:59 2010, steve, Update, PSL, ref cavity ion pump 
    Reply  Fri Jul 23 16:02:16 2010, Rana, Update, PSL, Reference Cavity Insulation Untitled.png
    Reply  Fri Jul 23 21:14:29 2010, Rana, Update, PSL, Reference Cavity Insulation 
Entry  Sun Aug 1 21:40:27 2010, rana, Summary, PSL, FSS: SLOWDC response Untitled.png
Entry  Thu Aug 5 00:17:41 2010, Koji, Update, PSL, PSL preparation work 
Entry  Thu Aug 5 17:59:23 2010, Koji, Update, PSL, Cable removal from the control room IMG_2684.jpg
    Reply  Thu Aug 5 22:36:11 2010, Koji, Update, PSL, PSL preparation work 
    Reply  Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work 
    Reply  Fri Aug 6 20:00:03 2010, Koji, Update, PSL, PSL preparation work PSL_cable_map.pdf
Entry  Sat Aug 7 11:07:44 2010, Koji, Configuration, PSL, MC kept locked / PMC control gain reduced to +13dB 
Entry  Tue Aug 10 05:56:07 2010, Koji, Update, PSL, PSL Table Lifting Preparation IMG_2686.jpgIMG_2691.jpgIMG_2692.jpgIMG_2711.jpg
Entry  Fri Aug 20 17:46:30 2010, rana, Update, PSL, 40m PSL Upgrade Layout v0.3 
Entry  Tue Aug 24 12:03:57 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png
    Reply  Wed Aug 25 15:32:52 2010, rana, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png
    Reply  Wed Aug 25 15:42:01 2010, Jenne, Update, PSL, PSL Upgrade: Mode Matching from PMC to IMC 
Entry  Fri Aug 27 22:09:37 2010, Jenne, Update, PSL, The beginnings of the new PSL phoenix.jpg
    Reply  Sat Aug 28 01:02:31 2010, rana, Update, PSL, The beginnings of the new PSL 
Entry  Mon Aug 30 13:57:25 2010, Koji, Summary, PSL, PSL table vibrational performance after the upgrade PEM_100830_SPE.pdfPEM_100830.pdf
    Reply  Mon Aug 30 18:22:00 2010, rana, Summary, PSL, PSL Enclosure is UNSTABLE 
Entry  Mon Aug 30 23:21:36 2010, rana, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software LaserMount.png
    Reply  Tue Aug 31 19:46:00 2010, rana, Update, PSL, PSL upgrade update 
    Reply  Wed Sep 1 08:28:43 2010, Koji, Update, PSL, PSL upgrade update 
    Reply  Wed Sep 1 08:36:59 2010, Koji, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software 
Entry  Thu Sep 2 01:44:13 2010, Jenne, Update, PSL, PSL beam hitting the PMC! 
    Reply  Fri Sep 3 06:55:42 2010, rana, Update, PSL, PSL beam hitting the PMC! 
Entry  Fri Sep 3 23:42:34 2010, Jenne, Update, PSL, PSL update of the day 
    Reply  Mon Sep 6 01:46:58 2010, rana, Update, PSL, PSL update of the day 
Entry  Wed Sep 8 00:01:07 2010, rana, valera, Update, PSL, PMC update 
    Reply  Wed Sep 8 09:50:13 2010, rana, Update, PSL, PSL update 
    Reply  Wed Sep 8 11:46:53 2010, kiwamu, Update, PSL, update of the layout 40mPSL.png
Entry  Thu Sep 9 05:58:04 2010, kiwamu, Update, PSL, mode matching from PMC to IMC 
Entry  Fri Sep 10 02:35:30 2010, rana, kiwamu, valera, tara, Configuration, PSL, update 40mPSL.pdf
Entry  Sat Sep 11 22:42:07 2010, valera, Update, PSL, PSL update DSC_2502.JPGDSC_2505.JPG
ELOG V3.1.3-