40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 265 of 357  Not logged in ELOG logo
    Reply  Sun Jul 5 18:14:13 2015, Ignacio, Update, PEM, Wilcoxon Accelerometer Huddle Test 8x
Entry  Thu Jul 23 15:41:41 2015, Steve, Update, PEM, fitting ants with TERRO 
Entry  Fri Jul 24 23:08:53 2015, Ignacio, Update, PEM, MC1 accelerators moved for future huddle test image1.JPG
Entry  Wed Jul 29 17:51:56 2015, Ignacio, Update, PEM, Accelerators moved back to MC1 and MC2 FullSizeRender.jpgFullSizeRender_2.jpg
    Reply  Thu Jul 30 10:38:18 2015, Steve, Update, PEM, Y sesimostation is back on Guralps_are_back_on.pngYstation.jpg
    Reply  Thu Jul 30 13:34:52 2015, Koji, Update, PEM, Y sesimostation is back on 
    Reply  Thu Jul 30 15:24:54 2015, Steve, Update, PEM, Y sesimostation is back on NewShortCable-Y-B-Gur2.pnginterfaceInputSwapped.pngsameasAtm2.png
    Reply  Fri Jul 31 10:36:22 2015, Steve, Update, PEM, X seismo station short cable removed IMG_0009.JPG
    Reply  Sat Aug 1 20:46:29 2015, Koji, Update, PEM, X seismo station short cable removed 
Entry  Mon Aug 10 15:25:05 2015, Steve, Update, PEM, wasp nest waspN.jpg
    Reply  Tue Aug 11 11:56:36 2015, Ignacio, Jessica, Update, PEM, Wasps obliterated maybe... IMG_1942.JPGIMG_1943.JPGIMG_1944.JPG
    Reply  Wed Aug 12 11:44:13 2015, ericq, Update, PEM, Gur2 Channels still wonky gur2_centered.png
    Reply  Fri Aug 14 09:07:45 2015, Steve, Update, PEM, Gur interface box is wonky Gur1&2.pnglongCablesSwapped.png
    Reply  Fri Aug 14 12:10:08 2015, Koji, Update, PEM, Gur interface box is wonky 
    Reply  Fri Aug 14 17:20:01 2015, Jenne, Update, PEM, Gur interface box is wonky 
    Reply  Mon Aug 17 17:48:12 2015, Koji, Update, PEM, Wasps obliterated maybe... 
    Reply  Tue Aug 18 11:16:17 2015, Steve, Update, PEM, Gur interface box is wonky IMG_0009.JPG
    Reply  Wed Aug 19 07:58:25 2015, Steve, Update, PEM, Gur interface box  GurADCbox.jpg
    Reply  Thu Aug 20 11:31:55 2015, Koji, Update, PEM, Gur interface box  IMG_1958.JPG
    Reply  Fri Aug 21 17:15:13 2015, Steve, Update, PEM, Gur interface box  
Entry  Tue Aug 25 16:33:31 2015, Ignacio, Steve, Configuration, PEM, Seismometer enclosure copper foil progress picture1.jpgpicture2.jpgIMG_1966.JPGIMG_1969.JPG
    Reply  Fri Aug 28 17:04:12 2015, Steve, Update, PEM, Gur interface box cable fixedNewLongCable.png
    Reply  Fri Aug 28 20:20:26 2015, rana, Update, PEM, Gur interface box cable 
    Reply  Tue Sep 1 10:36:06 2015, Steve, Update, PEM, Gurs swapped GurA@ETMY.png
    Reply  Mon Sep 7 19:46:46 2015, rana, Update, PEM, Seismic BLRMS filters T240_150907.png
    Reply  Wed Sep 9 15:45:11 2015, ericq, Update, PEM, Inverted STS filters in C1OAF 
Entry  Thu Sep 17 08:36:14 2015, Steve, Update, PEM, earth quake Chilian_eq_8.3M.pngBS_UR_0.220V.pngLowSensingV_BS-UR.png
    Reply  Thu Sep 17 16:04:09 2015, Steve, Update, PEM, Gurs  
Entry  Fri Oct 2 15:11:08 2015, Steve, Update, PEM, cable squashed 
    Reply  Wed Nov 4 15:48:58 2015, Steve, Update, PEM, ETMX wirestadoff vs EQ 8.3mChili.png
Entry  Thu Nov 12 10:22:33 2015, Steve, Update, PEM, possible vibration for 4days  
    Reply  Mon Dec 21 14:31:41 2015, Steve, Update, PEM, Rat traps set ratsNC.jpg
    Reply  Tue Jan 5 09:48:52 2016, Steve, Update, PEM, Rat trap moved  
Entry  Wed Jan 6 08:09:04 2016, Steve, Update, PEM, 4.5 Mag Banning EQ 4.5Mag__Banning.png
Entry  Tue Jan 12 08:40:06 2016, Steve, Update, PEM, Air cond maintenance 
    Reply  Mon Jan 25 11:06:08 2016, Steve, Update, PEM, noisy fan belt replaced 
Entry  Tue Jan 26 15:07:47 2016, Steve, Update, PEM, accelerometers moved to ETMX ETMX_floor_vs_optab.pngETMX_floor_vs_optabtop.png
    Reply  Wed Jan 27 08:17:38 2016, Steve, Update, PEM, ETMX floor vs table noise 6x
    Reply  Wed Jan 27 20:51:00 2016, rana, Update, PEM, ETMX floor vs table noise 
    Reply  Wed Jan 27 23:14:25 2016, gautam, Update, PEM, ETMX floor vs table noise X_end_ACC_Data.pngX_End_ACC_Data.xml.tar.gz
    Reply  Fri Jan 29 08:18:13 2016, Steve, Update, PEM, PEM PEM.png
    Reply  Mon Feb 1 09:16:32 2016, Steve, Update, PEM, Rat got cut bingo.jpgbingo3.png
Entry  Mon Feb 1 14:08:06 2016, Steve, Update, PEM, roof condtion is good 
Entry  Fri Feb 19 15:12:38 2016, Koji, Summary, PEM, Guralp Health Check Guralp_Raw_PSD.pdflow_vel_comparison.pdfGuralp_TF.pdf
Entry  Fri Mar 11 16:52:53 2016, Steve, Update, PEM, leaky roof leakyRoof.jpgleakyRoofA.jpg
    Reply  Wed Mar 23 15:23:12 2016, Steve, Summary, PEM, Guralps as connected GUR_A.jpgGUR_B.jpgGUR_Interface_Box.jpg
    Reply  Thu Mar 24 08:20:52 2016, Steve, Update, PEM, Guralp-A calibration sheet 
    Reply  Fri Mar 25 19:17:28 2016, Nikhil, Update, PEM, Guralp Seismometers 16x
    Reply  Fri Mar 25 23:54:04 2016, rana, Update, PEM, Guralp Seismometers 
    Reply  Wed Apr 20 14:36:45 2016, Steve, Update, PEM, dusty lab AP_accm.jpgwiped_AP.jpgtemp-partic_6months.png3_years_PEM.png
ELOG V3.1.3-