ID Date Author Type Categoryup Subject Text Attachments
  3268   Thu Jul 22 14:07:20 2010 kiwamuUpdatePSLPSL front end machineIt
looks like something wrong happened around
the PSL front end.  One
 PSL-PMC2010-07-22.png 
  3269   Thu Jul 22 15:59:29 2010 AlbertoUpdatePSLPSL front end machine


   
        
            
  
  3270   Thu Jul 22 18:18:54 2010 AlbertoUpdatePSLProblem Solved


   
        
            
  
  3271   Fri Jul 23 00:13:11 2010 ranaUpdatePSLProblem NOT REALLY SolvedSo...who was working around the PSL rack
this morning and afternoon? Looks like there was
  
  3272   Fri Jul 23 08:15:59 2010 steveUpdatePSLref cavity ion pumpThe ref cavity ion pump was running at
7.7kV instead of 5kV
This Digitel SPC-1 20 l/s ion pump
  
  3280   Fri Jul 23 16:02:16 2010 RanaUpdatePSLReference Cavity InsulationThis is the trend so far with the copper
foil wrapping. According to Megan's calculation,
we need ~1 mm of foil and the thickness of
 Untitled.png 
  3282   Fri Jul 23 21:14:29 2010 RanaUpdatePSLReference Cavity InsulationI wrapped another ~3 layers onto there.
It occurs to me now that we could just get
some 2mm thick copper plates made to fit
  
  3346   Sun Aug 1 21:40:27 2010 ranaSummaryPSLFSS: SLOWDC responseI bet you thought that the NPRO slow actuator
response could be well represented by a pole
at ~0.1 Hz? Well, that's just what they want
 Untitled.png 
  3364   Thu Aug 5 00:17:41 2010 KojiUpdatePSLPSL preparation workWe start the work on the cables at around
the PSL table.
  
  3369   Thu Aug 5 17:59:23 2010 KojiUpdatePSLCable removal from the control room[Alberto, Kiwamu, and Koji]
We removed the BNC cables from the
control room. 
 IMG_2684.jpg 
  3370   Thu Aug 5 22:36:11 2010 KojiUpdatePSLPSL preparation workPSL preparation work

  
  3371   Fri Aug 6 08:09:15 2010 steveUpdatePSLPSL preparation work


   
        
            
  
  3381   Fri Aug 6 20:00:03 2010 KojiUpdatePSLPSL preparation workPSL preparation work report
Aug 6th
10am-5pm: (Steve
 PSL_cable_map.pdf 
  3383   Sat Aug 7 11:07:44 2010 KojiConfigurationPSLMC kept locked / PMC control gain reduced to +13dBJenne asked us to keep th MC locked
and let the seismometers happy through this
weekend.
  
  3391   Tue Aug 10 05:56:07 2010 KojiUpdatePSLPSL Table Lifting PreparationWork
on Aug 9th
Steve, Jenne,
Koji, Alberto, Aidan, Jan, Sharmila, Katherine
From
 IMG_2686.jpgIMG_2691.jpgIMG_2692.jpgIMG_2711.jpg 
  3451   Fri Aug 20 17:46:30 2010 ranaUpdatePSL40m PSL Upgrade Layout v0.3http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL/LayoutUpgrade
P-pol = purple
S-pol = red
  
  3463   Tue Aug 24 12:03:57 2010 ranaUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCI used the free software called 'ABCD'
for Mac to construct this mode matching solution
for going from the PMC to the IMC.
 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png 
  3469   Wed Aug 25 15:32:52 2010 ranaUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCIn a manner similar to the now classic
'Mode Matching from PMC to  IMC' entry, I
have calculated the lenses and positions
 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png 
  3470   Wed Aug 25 15:42:01 2010 JenneUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCThoughts on where to take the pickoff for
the SHG for the PSL-green?  We discussed
today at the meeting the possibility of putting
  
  3482   Fri Aug 27 22:09:37 2010 JenneUpdatePSLThe beginnings of the new PSL[Rana, Jenne]
Like
 phoenix.jpg 
  3483   Sat Aug 28 01:02:31 2010 ranaUpdatePSLThe beginnings of the new PSLIn fact, many of the mounts need
to be adapted to 4": the beefy
steering mirrors going into the PMC, the
  
  3487   Mon Aug 30 13:57:25 2010 KojiSummaryPSLPSL table vibrational performance after the upgradeJenne and Koji
Last week Jenne has put the accelerometers
on and under the PSL table immediately after
 PEM_100830_SPE.pdfPEM_100830.pdf 
  3488   Mon Aug 30 18:22:00 2010 ranaSummaryPSLPSL Enclosure is UNSTABLEThe lifting and resetting of the
BLUE PSL enclosure has made it unstable somehow.
When I push on it a little it rocks
  
  3491   Mon Aug 30 23:21:36 2010 ranaHowToPSL2W NPRO Mount designed with emachineshop.com softwareTo test out this website - emachineshop.com,
Jenne and I are designing some of the mounts
for the new beam height.
 LaserMount.png 
  3500   Tue Aug 31 19:46:00 2010 ranaUpdatePSLPSL upgrade update
    Steve is handling the mount
height increase for the PMC and RC steering
mirrors, as well as a mount (non-steerable)
  
  3502   Wed Sep 1 08:28:43 2010 KojiUpdatePSLPSL upgrade update


   
        
            
  
  3503   Wed Sep 1 08:36:59 2010 KojiHowToPSL2W NPRO Mount designed with emachineshop.com software1. I can not see whether the attaching
surface is flat or not.
It should have ~1mm step to avoid
  
  3511   Thu Sep 2 01:44:13 2010 JenneUpdatePSLPSL beam hitting the PMC![Rana, Jenne]
More PSL progress. 
The new laser was raised to a 4 inch
  
  3519   Fri Sep 3 06:55:42 2010 ranaUpdatePSLPSL beam hitting the PMC!NPRO
Koji and I inspected and photographed
the laser after opening up its case. I then
  
  3523   Fri Sep 3 23:42:34 2010 JenneUpdatePSLPSL update of the dayRana and I were poking around on the PSL
table today, getting a few more items raised
to the correct height.
  
  3525   Mon Sep 6 01:46:58 2010 ranaUpdatePSLPSL update of the dayTo bypass the polarizer issue, I just used
cubes. One I took from the FSS-Refcav path
and the other from the power control part
  
  3542   Wed Sep 8 00:01:07 2010 rana, valeraUpdatePSLPMC updateWe ran the cables for the PMC: The RF cable
for the 35.5 MHz drive was cheap and so we
swapped the 29.5 MHz cable for it.
  
  3543   Wed Sep 8 09:50:13 2010 ranaUpdatePSLPSL updateAlso, Kiwamu has modified the layout drawing
to add the green PLL stuff. This has collapsed
the reference cavity's wave function placing
  
  3544   Wed Sep 8 11:46:53 2010 kiwamuUpdatePSLupdate of the layoutI put some
green stuff on the layout drawing.
 40mPSL.png 
  3548   Thu Sep 9 05:58:04 2010 kiwamuUpdatePSLmode matching from PMC to IMC I started mode matching of the
beam going to IMC. The work is still going
on.
  
  3556   Fri Sep 10 02:35:30 2010 rana, kiwamu, valera, taraConfigurationPSLupdateOver the last couple nights we got the
beam into the FSS path and all the way to
the IMC and out onto the AP table.
 40mPSL.pdf 
  3558   Sat Sep 11 22:42:07 2010 valeraUpdatePSLPSL update- The PMC REFL PD was moved from the temporary
location to the one called for by the PSL
layout (picture attached). The leakage beams
 DSC_2502.JPGDSC_2505.JPG 
  3566   Mon Sep 13 11:49:34 2010 kiwamuUpdatePSLmode matching from PMC to IMCI have been working on the mode matching
lenses which are sitting after the boradband
EOM.
 psl_mmt1.pngnewMM.png 
  3568   Mon Sep 13 19:41:38 2010 ranaUpdatePSLFSS AOM alignmentThe IR sensitive Olympus 570 camera gives
us a really nice view of these IR beams.
Its actually a lot better than what you can
  
  3570   Mon Sep 13 22:51:07 2010 tara,valeraConfigurationPSLbeam scan for RCAVOn Friday, Valera and I calculated the
modematching for reference cavity from AOM.
We scan the beam profile where the
 2010_09_10_w.mat 
  3573   Wed Sep 15 01:27:52 2010 rana, steve, valeraUpdatePSLFSS cables connected- connected the TTFSS cables (FSS fast
goes directly to NPRO PZT for now)
- measured the reference cavity 21.5
  
  3574   Wed Sep 15 01:58:28 2010 valeraUpdatePSLFSS lockingThe RefCav is locked and aligned. I changed
the fast gain sign by changing the jumper
setting on the TTFSS board. The RefCav visibility
 DSC_2510.JPG 
  3575   Wed Sep 15 03:08:26 2010 KojiUpdatePSLFSS lockingBrilliant! This is the VERY way
how the things are to be conquered!

  
  3587   Sun Sep 19 18:52:52 2010 ranaConfigurationPSLNPRO SLOW servo settings updated for Innolight NPROOur new 2W Mephisto has a pretty zippy
"SLOW" temperature input. Tuning
the perl PID servo, I found that the best
 Untitled.png 
  3591   Mon Sep 20 17:10:10 2010 steveConfigurationPSL enclosure beam guides to IFO are installed The PSL out  2" OD beam guide
tube was cut  1.5" shorter to 13.5"
The 10" OD  0.25"
  
  3603   Thu Sep 23 23:24:43 2010 rana, johnny, taraSummaryPSLAM modulate AOM to measure RefCav Thermo-Optic coefficientBig Johnny and I hacked a function
generator output into the cross-connect of
the 80 MHz VCO driver so that we could modulate
  
  3610   Mon Sep 27 00:33:50 2010 ranaUpdatePSLHigh Voltage Driver added to TTFSS -> NPROWe added the Thorlabs HV Driver in
between the FSS and the NPRO today.
The FSS is locking with it, but we
  
  3618   Wed Sep 29 01:53:44 2010 ranaUpdatePSLpaths broken and VCO turned offI found that several linux libraries have
been moved around and disabled today. In
particular, I see a bunch of new stuff in
  
  3640   Fri Oct 1 21:34:14 2010 rana, taraUpdatePSLHigh Voltage Driver added to TTFSS -> NPRO

    
        
 NPROTF.png2010_10_01.png 
  3641   Mon Oct 4 06:47:46 2010 rana, taraUpdatePSLHigh Voltage Driver added to TTFSS -> NPROInside the FSS box, the FAST path has a
~10 Hz pole made up from the 15k resistor
and the 1 uF cap before the output connector.
  