Entry  Wed Mar 4 23:42:45 2009, rana, Configuration, PSL, psl db change 
I made the following change
to correct the sign of the 126MON channel:
allegra:c1aux>ezcawrite C1:PSL-126MOPA_126MON.EGUF -410
Entry  Thu Mar 12 18:44:02 2009, Yoichi, Update, PSL, MZ aligned 
The MC lost the alignment somehow this afternoon.
So I thought it was good time to touch the MZ because I had to align the MC using the periscope anyway.
Entry  Tue Mar 24 13:10:07 2009, Alberto, Configuration, PSL, new mirror installed on the AP table 
New flipping mirror installed on the AP table on the beam path to the REFL199 PD.
If you're missing the double demod signal, please check that it is actually down.
Entry  Thu Mar 26 04:01:24 2009, Yoichi, Update, PSL, FSS Open Loop Gain OpenLoopTF.png
Yoichi, Peter, Jenne

Attached is the open loop transfer function of the FSS as of today with the common gain = 12dB and the fast gain = 16dB.
Entry  Fri Apr 10 18:11:18 2009, Jenne, Update, PSL, ISS has a bad cable? 
[Rob, Jenne]
I noticed that the ISS Mean Value and CS Saturation were both RED
and unhappy. (The alarms were going off, and they were both red on the MEDM screen).  None of the MEDM settings seemed off kilter, so we went out
Entry  Fri Apr 10 19:09:48 2009, Jenne, Update, PSL, PMC LO Calibration RFSliderAdjustCalib.pngRFSliderAdjustCalibWithOsc.png
I measured the RF LO output level from the PMC's LO board which goes directly into the LO input on the PMC Servo board.  This goes hand-in-hand with Rana's
thoughts 
that we might be giving the PMC mixer a too-low LO value, and we might need to switch out the mixer.  Steve ordered some new mixers today to try out.
    Reply  Sat Apr 11 00:45:41 2009, Yoichi, Update, PSL, PMC LO Calibration 
[quote]
I then changed the RF Output Adjust slider in increments of 0.5, and measured the peak-to-peak values on the scope. In the table and on the plots, I've
taken into account the 12dB attenuation.  i.e I actually measured 964mV, so 964mV*10^.6 = 3838mV.
    Reply  Sun Apr 12 19:27:20 2009, rana, Update, PSL, PMC LO Calibration 
[quote]
3.8Vpp is about 16dBm. 
The mixer for the PMC demodulator is level 23. So 16dBm is insufficient.
    Reply  Mon Apr 13 08:59:57 2009, steve, Update, PSL, mixers on order 
[quote][quote]
I then changed the RF Output Adjust slider in increments of 0.5, and measured the peak-to-peak values on the scope. In the table and on the plots, I've
taken into account the 12dB attenuation.  i.e I actually measured 964mV, so 964mV*10^.6 = 3838mV.
Entry  Mon Apr 13 17:55:37 2009, Jenne, Update, PSL, PMC LO Mon Calibration LOmonCalibration.png
I have calibrated the PMC LO Mon (C1:PSL-PMC_LODET) on the PMC's EPICS screen, by inputting different RF LO levels into the LO input of the PMC servo
board.
 
Entry  Wed Apr 15 17:11:37 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon 



Following the method in Peter's Elog, 

I edited c1psl.db to include the following:



grecord(calc, "C1:PSL-PMC_LOCALC")
{
        field(INPB,"C1:PSL-PMC_LODET")
        field(SCAN,".1 second")

       field(PREC,"4")
        field(CALC,".955*LOGE(B)-17.11")
}
 
    Reply  Thu Apr 16 11:17:56 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon 


    
        
            Quote:
        
        
            
            

I edited c1psl.db to include the following: 


grecord(calc, "C1:PSL-PMC_LOCALC")
{
Entry  Mon Apr 20 19:51:51 2009, Jenne, Configuration, PSL, PMC has new Level 13 Mixer installed PMColg20Apr2009.png
The new Level 13 mixer on the PMC servo board is installed (minicircuits SRA-3MH).   Since the RF output of the LO board was ~16dBm, I put
a 3dB attenuator between the LO board and the LO input on the servo board.  Since the previous cable was *just* the right length, this required adding
a tiny bit of cable.  I found a very short cable, which worked out nicely, and didin't leave bunches of extra cable between the two boards. 
Entry  Sat May 9 00:15:21 2009, Yoichi, Update, PSL, Laser head temperature oscillation laser.png
After the laser cooling pipe was unclogged, the laser head temperature has been oscillating in 24h period.
The laser power shows the same oscillation.
Moreover, there is a trend that the temperature is slowly creeping up.
    Reply  Sat May 9 02:20:11 2009, Jenne, Update, PSL, Laser head temperature oscillation 
[quote]After the laser cooling pipe was unclogged, the laser head temperature has been oscillating in 24h period.
The laser power shows the same oscillation.
Moreover, there is a trend that the temperature is slowly creeping up.
    Reply  Sat May 9 15:19:10 2009, rana, Update, PSL, Laser head temperature oscillation Picture_2.png
This is 8 days of 10-minute trend.

DTEC is just the feedback control signal required to keep the NPRO's pump diode at a constant temperature.
    Reply  Mon May 11 11:49:20 2009, steve, Update, PSL, MOPA cooling water lines are backwards htempvar80d.jpg
[quote]This is 8 days of 10-minute trend.

DTEC is just the feedback control signal required to keep the NPRO's pump diode at a constant temperature.
    Reply  Thu May 21 18:07:32 2009, rana, Update, PSL, Screw on Needle valve loosened Untitled.png
Alberto and I went in to loosen up the needle valve yesterday around 4:30 PM. The idea was to cut down on 
the flow to the NPRO so that the cooling power of the chiller would be used almost entirely on the 
amplifier instead of the NPRO block.
Entry  Fri May 22 17:03:14 2009, rob, steve, Update, PSL, MOPA takes a holiday 
The MOPA is taking the long weekend off.
Steve went out to wipe off the condensation inside the MOPA and found beads of water inside the NPRO box, perilously close to the PCB board. 
He then measured the water temperature at the chiller head, which is 6C.  We decided to "reboot" the MOPA/chiller combo, on the off chance
Entry  Tue May 26 17:05:44 2009, rob, Update, PSL, MOPA re-activated DSC_0513.JPGDSC_0517.JPG
steve, rob, alberto
 
Steve installed two rotary flow meters into the MOPA chiller system--one at the chiller flow output and one in the NPRO cooling line.  After
    Reply  Tue May 26 17:34:14 2009, rob, Update, PSL, MOPA re-deactivated laser_temp.jpg


    
        
            Quote:
        
        
            
            steve, rob, alberto
    Reply  Wed May 27 10:54:09 2009, rob, Update, PSL, we don't understand the chiller (broken) 


    
        
            Quote:
        
        
            
            
            
    
    Reply  Wed May 27 15:59:44 2009, rob, Update, PSL, we don't understand the chiller (broken) 
steve, alberto, rob
After some futzing around with the chiller, we have come to the tentative conclusion that the refrigeration unit is not working.  Steve called
facilities to try to get them to recharge the refrigerant (R-404a) tomorrow, and we're also calling around for a spare chiller somewhere in the project
    Reply  Thu May 28 14:34:25 2009, rob, Update, PSL, chiller diagnosis 


    
        
            Quote:
        
        
            
            steve, alberto, rob
Entry  Thu May 28 18:41:26 2009, steve, Update, PSL, the saga of the chiller is ending 
I drained the water and removed side covers from the Neslab RTE 140 refrigerated water cooler unit this morning. The hoses to the laser were disconnected.
This abled you to see the little window of refregerant  R404A was free of bubles, meaning: no recharge was needed.
The circulator bath was refilled with 7 liters of Arrowhead distilled water and the unit was turned on.
Entry  Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back laserisback.jpg
Steve, Rob and Alberto
 
Starting capacitor 216 miroFarad was installed on the compressor. Water lines were connected to the MOPA as corrected, so the flow meter readings
Entry  Sat May 30 11:24:56 2009, rob, Configuration, PSL, NPRO slow scan slowSCAN.png
I'm setting SLOWDC to about -5.
I had to edit FSSSlowServo because it had hard limits on SLOWDC at (-5 and 5).  It now goes from -10 to 10.
 
Entry  Sat May 30 12:03:34 2009, rob, Update, PSL, MC locked 
I locked to PSL loops, then tweaked the alignment of the MC to get it to lock. 
I first steering MC1 until all the McWFS quads were saturated.  This got the MC locking in a 01 mode.  So I steered MC1 a little more
till it was 00.  Then I steered MC2 to increase the power a little bit.  After that, I just enabled the MC autolocker.
Entry  Mon Jun 1 13:56:52 2009, Alberto, Update, PSL, Laser Power after fixing the laser chiller MOPAtrend.jpg
The laser power seems to have become more stable after fixing the laser chiller. The power is lower than it used to be (MOPA amplitude 2.5 versus 2.7)
but, as shown in the attchement, it became more steady.
Entry  Mon Jun 1 14:49:07 2009, rob, Summary, PSL, psl thoughts 
Some thoughts on what happened with the MOPA cooling.  
Some unknown thing happened to precipitate the initial needle valve jiggle, which unleashed a torrent of flow through the NPRO.  This flow
was made possible by the fact that the cooling lines are labeled confusingly, and so flow was going backwards through the needle valve, which was thus
    Reply  Mon Jun 1 15:01:31 2009, rana, Update, PSL, Laser Power after fixing the laser chiller: more traces Picture_7.png
If you look at the correlation between RMTEMP and HTEMP, you see what we knew: namely that there
was a 1:1 correlation before. After the chiller fix, I can see no correlation between the room and
amplifier temperature at the resolution of 10:1. So the chiller loop has a gain > 10 at 24 hour time
    Reply  Mon Jun 1 19:19:26 2009, rana, Update, PSL, 1000 days of hour-trend u.png
 
Entry  Thu Jun 4 15:53:15 2009, steve, Update, PSL, NPRO cooling flowrate adjusted needlevalve.jpg
The Neslab chiller is working well. It's temp display shows 20.0 C rock solid. Flow meter rotating at 13.5Hz at the out put of the chiller.
The MOPA temp was measured with a hand held thermocouple . The  PA was  34 C and 29 C at NPRO heat sink.
The NPRO flow meter was not rotating at this time. There was just trickeling water flow though the meter.
Entry  Wed Jun 10 09:28:14 2009, steve, Update, PSL, PMC pmctemphv.jpg
The PMC alarm was on this morning. It was relocked at lower HV
The FSS_RMTEMP jumped 0.5 C so The PZT was compensating for it.
 
Entry  Wed Jul 8 19:13:19 2009, Alberto, Update, PSL, PSL beam aligned to the Mode Cleaner 
Today I tuned the periscope on the PSL table to align the beam to the Mode Cleaner. With the Wave Front Sensor control off, I minimized the reflection
from the MC and maximized the transmission. While doing that I also checked that the transmitted beam after the MC didn't lose the alignment with the interferometer's
main Faraday isolator.
Entry  Wed Jul 22 10:49:40 2009, Alberto, Update, PSL, MC Alignment Trend 2009-07-21_MC-align-trend.pdf2009-07-22_mc-align-trend.pdf
Trying to track the MC positions back for a few days, it seems that the data hasn't been recorded properly for a while. Something happened yesterday
after my boot fest and then the record got restored. Attached here are the readbacks showing the event for MC1.
Is anything wrong with the data record?
Entry  Thu Jul 23 10:05:38 2009, Alberto, Update, PSL, Summary of the latest adventures with the alignment of the mode cleaner 







Entry  Thu Jul 23 20:30:23 2009, Alberto, Update, PSL, Beam aligned to the Farady 
After yesterday's changes in the MC cavity state today it was necessary to optimize the alignment to the Faraday.
The way I did it was by tuning the PSL periscope in pitch and yaw trying to maximize TRX with the arm locked. After a small change in either one
of the two directions I first maximized the MC transmitted power and then I ran the alignment script for the X arm.
Entry  Fri Jul 24 21:02:46 2009, Alberto, Update, PSL, Aligning the beam to the Faraday 
This afternoon I kept working on the alignment of the beam so that it matches at the same the PSL periscope, the Mode Cleaner and the Faraday isolator
at the input of the IFO.
The camera looking at the Farady showed a beam quite low from the center of the Faraday's entrance. I wanted to move it up.
    Reply  Sat Jul 25 16:04:32 2009, rob, Update, PSL, Aligning the beam to the Faraday 


    
        
            Quote:
        
        
            
    Reply  Sat Jul 25 19:04:01 2009, Koji, Update, PSL, Aligning the beam to the Faraday MC2_Cam.jpg


    
        
            Quote:
        
        
            
            
            
    
    Reply  Sun Jul 26 13:19:54 2009, rana, Update, PSL, Aligning the mode cleaner Untitled.png
I set the MC back to its good alignment (June 21st) using this procedure. The trend of the
OSEM values over the last 40 days and 40 nights is attached.
Then I aligned the periscope to that beam. This took some serious periscope knob action. Without WFS, the transmission went to 2.7 V and the reflection
    Reply  Sun Jul 26 16:05:17 2009, Alberto, Update, PSL, Aligning the mode cleaner 


    
        
            Quote:
        
        
            
            I set the MC back to its good alignment (June 21st) using this
Entry  Wed Jul 29 11:58:57 2009, Alberto, Update, PSL, MC not locking 
This morning I found the Mode Cleaner unlocked.
I check the sliders for the mirrors bias and they have not changed. Also the OSEMs readbacks show no change in the optics positions.
I don't understand what's wrong because in the previous days, in this state of alignmanet, it could lock.
Entry  Mon Aug 3 01:08:20 2009, Alberto, Update, PSL, MC unlocked 
Friday afternoon the mode cleaner got unlocked. Then some adjustment of the MC1 bias sliders locked it again. The driftmon showed the excursion for pitch
and yaw of MC1 becasue it wasn't updated after the change.
Tonight Rana found the MC unlocked and simply touched the sliders to bring the OSEMs back to the driftmon values.
    Reply  Mon Aug 3 12:57:09 2009, Alberto, Update, PSL, MC unlocked 


    
        
            Quote:
        
        
            
            Friday afternoon the mode cleaner got unlocked. Then some adjustment of the MC1 bias sliders locked it again. The driftmon
Entry  Wed Aug 5 16:33:50 2009, steve, Configuration, PSL, new PSL output iris psliris.png
I installed an improvised version of PSL output beam iris at the output periscope last week.
Entry  Thu Aug 6 17:45:37 2009, Jenne, Update, PSL, HEPAs on high 
Stephanie has needed the doors to the PSL open all day, and still has them open, so I just turned the HEPAs on high. 
Entry  Thu Aug 6 18:26:26 2009, Jenne, Update, PSL, Ref Cav and PMC aligned 
[Alberto, Jenne]
We aligned both the reference cavity and the PMC, each by looking at their Trans PD on Davaviewer, and adjusting the two steering mirrors to maximize
the transmission power.  We got a pretty good amount of improvement for the ref cav, but since the PMC hasn't decayed a whole lot, we got a much smaller
    Reply  Thu Aug 6 19:54:04 2009, Stephanie, Update, PSL, HEPAs back to normal 


    
        
            Quote:
        
        
            
            Stephanie has needed the doors to the PSL open all day, and still has them open, so I just turned the HEPAs on high. 