40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 264 of 344  Not logged in ELOG logo
   +  Reply  Mon Apr 13 08:59:57 2009, steve, Update, PSL, mixers on order 
Entry  Mon Apr 13 17:55:37 2009, Jenne, Update, PSL, PMC LO Mon Calibration LOmonCalibration.png
Entry  Wed Apr 15 17:11:37 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon 
   +  Reply  Thu Apr 16 11:17:56 2009, Jenne, Update, PSL, Edited c1psl.db to calibrate PMC's LO mon 
Entry  Mon Apr 20 19:51:51 2009, Jenne, Configuration, PSL, PMC has new Level 13 Mixer installed PMColg20Apr2009.png
Entry  Sat May 9 00:15:21 2009, Yoichi, Update, PSL, Laser head temperature oscillation laser.png
   +  Reply  Sat May 9 02:20:11 2009, Jenne, Update, PSL, Laser head temperature oscillation 
   +  Reply  Sat May 9 15:19:10 2009, rana, Update, PSL, Laser head temperature oscillation Picture_2.png
   +  Reply  Mon May 11 11:49:20 2009, steve, Update, PSL, MOPA cooling water lines are backwards htempvar80d.jpg
   +  Reply  Thu May 21 18:07:32 2009, rana, Update, PSL, Screw on Needle valve loosened Untitled.png
Entry  Fri May 22 17:03:14 2009, rob, steve, Update, PSL, MOPA takes a holiday 
Entry  Tue May 26 17:05:44 2009, rob, Update, PSL, MOPA re-activated DSC_0513.JPGDSC_0517.JPG
   +  Reply  Tue May 26 17:34:14 2009, rob, Update, PSL, MOPA re-deactivated laser_temp.jpg
   +  Reply  Wed May 27 10:54:09 2009, rob, Update, PSL, we don't understand the chiller (broken) 
   +  Reply  Wed May 27 15:59:44 2009, rob, Update, PSL, we don't understand the chiller (broken) 
   +  Reply  Thu May 28 14:34:25 2009, rob, Update, PSL, chiller diagnosis 
Entry  Thu May 28 18:41:26 2009, steve, Update, PSL, the saga of the chiller is ending 
Entry  Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back laserisback.jpg
Entry  Sat May 30 11:24:56 2009, rob, Configuration, PSL, NPRO slow scan slowSCAN.png
Entry  Sat May 30 12:03:34 2009, rob, Update, PSL, MC locked 
Entry  Mon Jun 1 13:56:52 2009, Alberto, Update, PSL, Laser Power after fixing the laser chiller MOPAtrend.jpg
Entry  Mon Jun 1 14:49:07 2009, rob, Summary, PSL, psl thoughts 
   +  Reply  Mon Jun 1 15:01:31 2009, rana, Update, PSL, Laser Power after fixing the laser chiller: more traces Picture_7.png
   +  Reply  Mon Jun 1 19:19:26 2009, rana, Update, PSL, 1000 days of hour-trend u.png
Entry  Thu Jun 4 15:53:15 2009, steve, Update, PSL, NPRO cooling flowrate adjusted needlevalve.jpg
Entry  Wed Jun 10 09:28:14 2009, steve, Update, PSL, PMC pmctemphv.jpg
Entry  Wed Jul 8 19:13:19 2009, Alberto, Update, PSL, PSL beam aligned to the Mode Cleaner 
Entry  Wed Jul 22 10:49:40 2009, Alberto, Update, PSL, MC Alignment Trend 2009-07-21_MC-align-trend.pdf2009-07-22_mc-align-trend.pdf
Entry  Thu Jul 23 10:05:38 2009, Alberto, Update, PSL, Summary of the latest adventures with the alignment of the mode cleaner 
Entry  Thu Jul 23 20:30:23 2009, Alberto, Update, PSL, Beam aligned to the Farady 
Entry  Fri Jul 24 21:02:46 2009, Alberto, Update, PSL, Aligning the beam to the Faraday 
   +  Reply  Sat Jul 25 16:04:32 2009, rob, Update, PSL, Aligning the beam to the Faraday 
   +  Reply  Sat Jul 25 19:04:01 2009, Koji, Update, PSL, Aligning the beam to the Faraday MC2_Cam.jpg
   +  Reply  Sun Jul 26 13:19:54 2009, rana, Update, PSL, Aligning the mode cleaner Untitled.png
   +  Reply  Sun Jul 26 16:05:17 2009, Alberto, Update, PSL, Aligning the mode cleaner 
Entry  Wed Jul 29 11:58:57 2009, Alberto, Update, PSL, MC not locking 
Entry  Mon Aug 3 01:08:20 2009, Alberto, Update, PSL, MC unlocked 
   +  Reply  Mon Aug 3 12:57:09 2009, Alberto, Update, PSL, MC unlocked 
Entry  Wed Aug 5 16:33:50 2009, steve, Configuration, PSL, new PSL output iris psliris.png
Entry  Thu Aug 6 17:45:37 2009, Jenne, Update, PSL, HEPAs on high 
Entry  Thu Aug 6 18:26:26 2009, Jenne, Update, PSL, Ref Cav and PMC aligned 
   +  Reply  Thu Aug 6 19:54:04 2009, Stephanie, Update, PSL, HEPAs back to normal 
Entry  Thu Aug 6 23:29:47 2009, Jenne, Update, PSL, Ref cav reflection PD is funky 
   +  Reply  Fri Aug 7 00:10:14 2009, rana, Update, PSL, Ref cav reflection PD is funky 
Entry  Fri Aug 7 11:39:13 2009, Alberto, Update, PSL, MZ Alignment 
Entry  Fri Aug 7 14:31:39 2009, Alberto, Update, PSL, DAQ REstarted 
   +  Reply  Fri Aug 7 17:05:34 2009, Jenne, Update, PSL, Ref cav reflection PD is funky 
Entry  Sat Aug 8 15:08:14 2009, rana, Configuration, PSL, SMOO settings updated in psl.db and SVN updated 
Entry  Mon Aug 10 11:33:58 2009, Jenne, Update, PSL, Non-Elogged Beam dump on the PSL table - BadBadBad commodusthumbsdown.jpg
   +  Reply  Mon Aug 10 15:21:15 2009, Jenne, Update, PSL, Non-Elogged Beam dump on the PSL table - BadBadBad 
ELOG V3.1.3-