  10529   Wed Sep 24 08:39:32 2014 Jenne, EricQUpdateGeneralVent prep for SRC length change

    

       
            
  
  8889   Mon Jul 22 16:30:31 2013 KojiUpdateGeneralVent preparation[Annalisa, Manasa, Jenne, Koji]
We are working on the vent preparation.
First of all, 
  
  8890   Mon Jul 22 16:56:14 2013 JenneUpdateGeneralVent preparation - In progressPre-vent checklist


   Center all oplevs/IPPOS/IPANG

   Align the arm cavities for
  
  8893   Mon Jul 22 18:49:16 2013 JenneUpdateGeneralVent preparation - In progressI have just centered IPPOS, as well as
PSL POS and PSL ANG (also called IOO POS
and IOO ANG on the screens).  Annalisa
  
  8894   Mon Jul 22 21:23:04 2013 manasaUpdateGeneralVent preparation - In progress[Gautam, Manasa]
Green steering mirrors have been
swapped with PZT mirrors at the X end table.
  
  8898   Tue Jul 23 03:10:57 2013 KojiUpdateGeneralVent preparation - In progressCentering
of the oplev beams: done
 OSEM_RECORD.pngOPLEVS.png 
  8899   Tue Jul 23 03:43:32 2013 manasaUpdateGeneralVent preparation - In progressThere seems to be an unexplained oscillation
in X arm cavity transmission for IR when
  
  8901   Tue Jul 23 04:22:03 2013 KojiUpdateGeneralVent preparation - In progress[Koji Jenne]
Low
power MC locking
  
  8903   Tue Jul 23 04:31:36 2013 JenneUpdateGeneralVent preparation - Ready for VentAfter
everyone's work today (good teamwork everybody!!),
  
  14059   Thu Jul 12 16:18:22 2018 SteveUpdateVACVent preparationsWe are getting ready to vent.

 
 before_Vent.pngbefore_Vent_cond.png 
  8929   Fri Jul 26 22:45:14 2013 manasaUpdateGeneralVent progress[Koji, Manasa]
The arms were brought back to resonance
after yesterday's vent work.
  
  8936   Tue Jul 30 00:21:15 2013 KojiUpdateGeneralVent progress[Koji, Manasa, Sujan] 
Tomorrow we'll make final checks
  
  10541   Thu Sep 25 19:42:12 2014 ericqUpdateGeneralVent progress[q, Jenne, Manasa]
ELOG Outline

    Aligned arms
  
  
  10544   Fri Sep 26 12:25:34 2014 ericqUpdateGeneralVent progressI figured out that didn't change the initial
guess for the fit routine in Gabriele's code.
I also changed the fminsearch criteria to
  
  12243   Tue Jul 5 17:14:02 2016 ericqUpdateGeneralVent progressRough summary of today's progress:


IMC locked, reasonably
aligned. (Only have MC2 trans reference,
 noOsemSide.JPGOSEMside.JPG 
  12245   Tue Jul 5 19:10:41 2016 ranaUpdateGeneralVent progressI'd suggest clamping and moving it
to the flow bench so you can inspect with
a bright light. Then remove the wire and
 jumpEvent20151105.png 
  12246   Tue Jul 5 21:51:35 2016 ericqUpdateGeneralVent progressOne glitch was seen to occur without a
change in the output voltage monitors in ELOG
  
  12270   Thu Jul 7 17:12:50 2016 JohannesUpdateGeneralVent progressI performed a visual inspection of ITMY
in its natural habitat today. I did not get
any great pictures from the HR side because
 IMG_2621.JPGIMG_2623.JPGIMG_2628.JPGIMG_2595.JPG 
  12285   Sun Jul 10 17:33:00 2016 ericqUpdateGeneralVent progressIt took a little time, but I relocked the
IMC and realigned to the point where the
PRC is flashing, visible on REFL and AS,
  
  12247   Tue Jul 5 23:38:42 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationWith Koji's help, I've hacked together
an arrangement that will allow us to monitor
the output of the coil driver to the UL coil. 
 image.jpeg 
  12261   Wed Jul 6 22:58:01 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationI've made a few changes to the monitoring
setup in the hope we catch a glitch in the
DAC output/ sus coil driver electronics.
  
  12263   Thu Jul 7 00:25:07 2016 ericqUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationIt may be advantageous to look at the coil
output data from when the OSEM damping is
on, to try and reproduce the real output
  
  12265   Thu Jul 7 10:49:03 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigation


 UL_glitchMon_Striptool.png 
  12271   Fri Jul 8 11:35:45 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationYesterday, I expanded the extent of the
ETMX suspension coil driver investigation.
I set up identical monitors for two more
 coilGlitchMon.png 
  12272   Fri Jul 8 11:48:09 2016 KojiUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationYES

Move the suspension on the south
  
  12281   Fri Jul 8 21:22:38 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationWhile ETMX is out, I'm leaving
the larger amplitude excitations to the coils
on over the weekend, in case any electronic
  
  12297   Wed Jul 13 00:38:25 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We attempted to move the ETMY suspension
near the access port in preparation for the
  
  12310   Tue Jul 19 13:21:42 2016 JohannesUpdateGeneralVent progress - ETMY attempted repositioning[Lydia, Johannes]

We moved ITMY from its original
position to a place near the access point.
  
  12295   Tue Jul 12 23:51:16 2016 JohannesUpdateGeneralVent progress - ETMY inspectionOn Monday I inspected ETMY, and found nothing
really remarkable. There was only little
dust on the HR side, and nothing visible
 IMG_2679.JPGIMG_2673.JPG 
  12289   Mon Jul 11 15:13:22 2016 gautamUpdateGeneralVent progress: in-date First Contact procuredI have obtained 2x100cc bottles of in-date
first contact from Garilynn (use before date
is 09/14/2016) for cleaning of our test-masses.
 image.jpeg 
  12534   Wed Oct 5 19:43:13 2016 gautamSummaryGeneralVent reviewThis elog is meant to review some of the
important changes made during the vent this
summer - please add to this if I've forgotten
  
  9572   Thu Jan 23 23:10:19 2014 ericq UpdateGeneralVent so far[ericq, Manasa, Jenne]
Summary: We opened up the
BS and both ITM chambers today, and put the
  
  9579   Mon Jan 27 21:36:35 2014 ericq UpdateGeneralVent so farAfter turning the slow FSS threshold down,
the mode cleaner stays locked enough to do
other things. We were able to align the tip
  
  2360   Mon Dec 7 09:38:05 2009 KojiUpdateVACVent startedSteve, Jenne, Koji
The PSL was blocked by the
  
  14607   Tue May 14 10:35:58 2019 gautamUpdateGeneralVent underway
PSL had stayed on overnight. There
was an EQ (M 4.6 near Costa Rica) which showed
up on the Seis BLRMS, and I noticed that
 vent.pngScreenshot_from_2019-05-14_16-35-16.png 
  10545   Fri Sep 26 16:10:14 2014 ericqUpdateGeneralVent updateToday so far:

    I moved SRM forward by
3mm
    Then I leveled the ITMY
  
  10546   Fri Sep 26 17:13:39 2014 ericqUpdateGeneralVent update

    

       
            
  
  10549   Mon Sep 29 12:47:51 2014 ericqUpdateGeneralVent update

    

       
            
  
  10550   Mon Sep 29 17:10:51 2014 ericqUpdateGeneralVent updateEverything is aligned, AS and POY make
it out of vacuum unclipped, OSEM readings
look good.
  
  10551   Mon Sep 29 18:12:24 2014 ericqUpdateGeneralVent updateI closed the PSL shutter as we didn't want
to burn the mirror surface when we are not
working.
  
  10552   Tue Sep 30 11:53:29 2014 ericqUpdateGeneralVent update 
Photos have been taken of the ITMY
chamber, and uploaded to picasa. Here's a
  
  7306   Wed Aug 29 11:47:21 2012 ericqUpdateVACVenting [Steve, Eric]
I've been helping Steve vent this
morning. The following things were done (from
  
  38   Wed Oct 31 10:31:23 2007 Andrey RodionovRoutineVACVenting is in progress
We (Steve, David, Andrey) started venting
the vacuum system at 9.50AM Wednesday morning.
  
  17866   Thu Sep 21 14:22:02 2023 RadhikaSummaryElectronicsVertex Electronics CDS UpdateI recalculated the scale factors between
OSEM sensor readings after/before the upgrade.
The expected factor is 8.64, although we
  
  17867   Fri Sep 22 16:20:25 2023 RadhikaSummaryElectronicsVertex Electronics CDS UpdateToday we tried to debug the unreasonable
OSEM readings (see previous ELOG)

 IMG_9200.jpgIMG_9201.jpg 
  17868   Fri Sep 22 18:26:08 2023 RadhikaSummaryElectronicsVertex Electronics CDS Update[Koji, Radhika, Murtaza]

All upgraded suspensions
 PXL_20230923_003545536.jpgPXL_20230923_005555079.jpg 
  17871   Fri Sep 22 19:38:06 2023 MurtazaSummaryElectronicsVertex Electronics CDS UpdatePRM
CHANNEL 1-4 (BS FEEDTHROUGH 1-3)
 IMG_9203.jpgIMG_9202.jpg 
  17830   Thu Sep 7 14:09:37 2023 KojiSummaryElectronicsVertex Electronics TransitionThe vertex electronics transition work
will begin on Monday. We expect the ongoing
ASS-X work to be completed by then. But if
 diagram_1X345.pdfrack_plan.pdf 
  17838   Tue Sep 12 18:55:55 2023 KojiSummaryElectronicsVertex Electronics TransitionWe are ready to do the transition
from Wed 1PM.

The items for the upgrade was collected
 PXL_20230913_013735728.jpg 
  17839   Tue Sep 12 23:10:06 2023 KojiSummaryElectronicsVertex Electronics TransitionNote on Sorensen:

- Eurocard crate requires
+-15V. We can place two 15V Sorensens on
  