  10680   Thu Nov 6 12:53:09 2014 diegoUpdateASCX arm restored[Diego, Koji]
X arm has been restored, after modifying
the two parameters mentioned in http://nodus.ligo.caltech.edu:8080/40m/10676
  
  12474   Tue Sep 6 20:45:14 2016 gautamUpdateSUSX arm test masses back in chamber[Teng, Johannes,
Lydia, gautam]


The
 IMG_3137.JPGIMG_3143.JPGIMG_3142.JPGIMG_3148.JPG 
  10702   Wed Nov 12 15:14:09 2014 manasaUpdateGeneralX end AUX laser fiber setup I looked at the endtable for possible
space to setup optics in order to couple
the X end laser into a PM fiber.
 ETMXtable.png 
  10831   Mon Dec 22 17:06:14 2014 manasaUpdateGeneralX end AUX laser fiber setup

    

       
            
  
  10834   Tue Dec 23 13:18:37 2014 manasaUpdateGeneralX end AUX laser fiber setup

    

       
            
  
  12526   Fri Sep 30 19:53:07 2016 gautamUpdateendtable upgradeX end IR pickoff fiber coupled[johannes, gautam]

Today we re-installed the fiber
coupler on the X-endtable to couple some
  
  9455   Thu Dec 12 00:21:04 2013 KojiUpdateGreen LockingX end PDH box oscillation issue solved (Re: screwed up the end PDH box)What
a such long pain we suffered.
After more than three years from
  
  4297   Tue Feb 15 06:59:57 2011 Suresh, JenneOmnistructureGeneralX end enclosure left open[Jenne, Suresh]
 Jenne found the X-end table
enclosure had been left open.  She replaced
  
  10730   Fri Nov 21 11:41:24 2014 manasaUpdateGeneralX end fiber insulated and on cable tray

    

       
            
  
  10739   Mon Dec 1 15:41:38 2014 SteveUpdateGeneralX end fiber insulated and on cable tray


   
        
            
  
  7274   Fri Aug 24 21:00:40 2012 KojiUpdateLSCX end green investigationI checked and fixed the X end green situation.
Now
the X green beam is locked with TEM00.
  
  10873   Wed Jan 7 19:49:09 2015 manasaUpdateGeneralX end space issuesI have attached a photo of the ETMX table.
The path of the 1064nm light rejected after
the doubler and the green light are indicated
 ETMXspace.png 
  10955   Thu Jan 29 10:14:21 2015 manasaUpdateGeneralX end space issuesIt is certain that we have space issues
at the X end that has been preventing us
from sticking in a lens to couple light into
 photo.pngdrawing.png 
  12056   Wed Mar 30 17:38:52 2016 gautamUpdateendtable upgradeX end table proposed layout Attachment 1: This
is a photo of the current X end table optical
layout with the beampaths of the various
 ETMX_3x2.JPGlayout_details_20160328.pdfETMX_proposed_layout.pdf 
  10457   Fri Sep 5 04:07:44 2014 ericqUpdateGreen LockingX end uPDH Box ReplacedJust a quick note, plots and data will
come tomorrow:
I grabbed an unused uPDH board from
  
  12073   Wed Apr 13 00:56:07 2016 gautamUpdateendtable upgradeX endtable repopulationOver the last couple of days, I've
been working on restoring the optical layout
on the X-endtable. Some notes about the status
  
  12074   Wed Apr 13 11:00:28 2016 SteveUpdateendtable upgradeX endtable repopulationETMX optical table is grounded to ETMX
chamber through 1 Mohms

The doubling oven temp controller
  
  10981   Thu Feb 5 15:21:25 2015 manasaUpdateGeneralX endtable work [EricG, Manasa]

We were at the X end today trying
to couple AUX X light into the fiber. 
  
  10978   Wed Feb 4 21:09:43 2015 manasaUpdateGeneralX endtable work scheduled tomorrowThe X end fiber setup will be put together
tomorrow morning.
  
  5133   Sun Aug 7 14:01:58 2011 kiwamuUpdateGreen LockingX green beam re-aligned[Jenne / Kiwamu]
 The
  
  5135   Sun Aug 7 18:41:12 2011 JenneUpdateGreen LockingX green beam re-aligned


   
        
            
  
  6342   Wed Feb 29 20:27:00 2012 JenneUpdateGreen LockingX green beat - found it!Found it!
The actual temperature of the Xend
  
  8666   Mon Jun 3 21:09:55 2013 ManasaUpdateGreen LockingX green beatnote through beatboxI connected the X green beat PD output
back to the beatbox, did the usual PSL alignment
for green and searched for the beat note
 IMG_0608.JPG 
  10000   Wed May 28 17:51:48 2014 manasaUpdateLSCX green broadband PD NOT working

    

       
            
  
  10001   Wed May 28 19:15:38 2014 KojiUpdateLSCX green broadband PD NOT workingIf the PD is the suspect, just pull it
from the table and bring it to the PD testing
setup.
  
  9996   Tue May 27 21:48:31 2014 JenneUpdateLSCX green broadband PD not working???!?Grr.  I am very frustrated. 
After lunch I redid alignment for both X
and Y green systems (Yarm both at the end
 ALS_outofloop_27May2013_2.pdf 
  11473   Fri Jul 31 10:36:22 2015 SteveUpdatePEMX seismo station short cable removed 




 IMG_0009.JPG 
  11475   Sat Aug 1 20:46:29 2015 KojiUpdatePEMX seismo station short cable removedOMG   
  9496   Thu Dec 19 19:45:12 2013 ericqUpdateGreen LockingX-Arm Green PDH Loop StuffWith the fixed servo box, I remeasured the
OLTF, the servo, and the low pass filter
between the mixer output and servo input.
 xarmPDHtfs.pdfxarmCLG.pdflayout.pdf 
  7171   Tue Aug 14 04:53:45 2012 YoichiSummaryLSCX-Arm noise spectrumYoichi, Rana
Here is the noise spectrum of the
X-arm error signal along with the TRX DC
 xarm-spectrum.png 
  8983   Wed Aug 7 23:40:49 2013 gautamUpdateCDSX-End Green ASS - A first update I
have done some preliminary testing of the
X-End Green ASS Servo. I will write a more
 time-series.pdf 
  8993   Sat Aug 10 05:53:51 2013 gautamUpdateCDSX-End Green ASS - RoundupOver
the last three days, I've had the interferometer
to test and optimize the ASX Servo. Based
 New_ASX_MEDM_MAIN.pdf 
  8995   Mon Aug 12 12:57:59 2013 JenneUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8996   Mon Aug 12 13:30:33 2013 JamieUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  9044   Wed Aug 21 00:18:03 2013 MasayukiSummaryGreen LockingX-arm PDH OLTF measurement[Manasa Masayuki]
Today we measured the openloop transfer
function of the PDH green lock of the x-arm.
 IMG_1226.JPGIMG_1228.JPG 
  9047   Wed Aug 21 19:37:25 2013 MasayukiSummaryGreen LockingX-arm PDH OLTF measurement[Manasa, Masyauki]

Today we measured OLTF of PDH green
 OLTF_PDH_Glock_6_5_2.png 
  4490   Tue Apr 5 21:20:11 2011 KojiSummaryGreen LockingX-arm cavity locked with LB1005 servo boxLast Thursday, I tested Newport
Servo Controller LB1005 with the X_arm
green PDH servo.
 servo.pngOLTF.pdf 
  717   Tue Jul 22 22:11:58 2008 YoichiUpdateLSCX-arm g factor measurementAlberto, Yoichi

We measured the g factor of the X-arm by
  
  7224   Sat Aug 18 03:55:12 2012 YoichiSummaryLSCX-arm locking againTonight, I worked on the X-arm locking
again. I did not have any significant progress,
but observed several issues and will give
 MC_Trans.png 
  11978   Fri Feb 5 15:02:13 2016 gautamUpdateGreen LockingX-end NE cable[Steve, gautam]

Steve thinks that the X-end Innolight
does not come with the noise-eater option
  
  4615   Tue May 3 15:59:22 2011 steveFrogsPhotosX-mas comes earlyThe little red all terrain cargo wagon
40" x 18"  has just arrived
on pneumatic wheels.
 P1070634.JPG 
  9584   Tue Jan 28 23:32:12 2014 KojiUpdateGeneralX/Y arm locked with the IR beam[Koji EricQ]
The both arms have been locked
with IR and aligned by ASS.
 good_alignment.png 
  10492   Wed Sep 10 22:17:29 2014 KojiSummaryLSCX/Y green beat mode overlap measurement[Koji Manasa]
We made quantitative inspection of
the X/Y green beat setup on the PSL table.
  
  11368   Mon Jun 22 12:57:09 2015 ericqSummaryLSCX/Y green beat mode overlap measurement redoneI took measurements at the green beat setup
on the PSL table, and found that our power
/ mode overlap situation is still consistent
  
  11370   Mon Jun 22 14:53:37 2015 ranaSummaryLSCX/Y green beat mode overlap measurement redone
Why is there a factor of 20 power
difference? Some of it is the IR laser power
difference, but I thought that was just a
  
  12587   Fri Oct 28 15:46:29 2016 gautamSummaryLSCX/Y green beat mode overlap measurement redoneI've been meaning to do this analysis
ever since putting in the new laser at the
X-end, and finally got down to getting all
  
  12531   Tue Oct 4 22:18:24 2016 JohannesUpdateGeneralX/YARM loss measurement[gautam, johannes]

We let the PSL shutter closed overnight
and observed the POXDC, POYDC and ASDC offsets.
 anomalousData.png 
  8554   Wed May 8 22:36:42 2013 KojiUpdateASSXARM ASS (YARM ASS - faster and more precise convergence)Same ASS setup for the X arm has been
done.
Now
 XARM_ASS.png 
  16732   Thu Mar 17 16:50:53 2022 PacoUpdateBHDXARM AUX alignment[Ian, Paco]

We opened the ITMX chamber and


Inspected PR2 and LO1 and
  
  16735   Fri Mar 18 17:15:19 2022 PacoUpdateBHDXARM AUX alignment cont.[Paco, Ian]

First, we re-balanced the ITMX
OSEMs so that they would damp at around half-a-shadow.
 Screen_Shot_2022-03-18_at_4.09.38_PM.png 