40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 260 of 341  Not logged in ELOG logo
    Reply  Wed Feb 4 21:09:43 2015, manasa, Update, General, X endtable work scheduled tomorrow 
    Reply  Sun Aug 7 14:01:58 2011, kiwamu, Update, Green Locking, X green beam re-aligned 
    Reply  Sun Aug 7 18:41:12 2011, Jenne, Update, Green Locking, X green beam re-aligned 
Entry  Wed Feb 29 20:27:00 2012, Jenne, Update, Green Locking, X green beat - found it! 
    Reply  Mon Jun 3 21:09:55 2013, Manasa, Update, Green Locking, X green beatnote through beatbox IMG_0608.JPG
    Reply  Wed May 28 17:51:48 2014, manasa, Update, LSC, X green broadband PD NOT working 
    Reply  Wed May 28 19:15:38 2014, Koji, Update, LSC, X green broadband PD NOT working 
Entry  Tue May 27 21:48:31 2014, Jenne, Update, LSC, X green broadband PD not working???!? ALS_outofloop_27May2013_2.pdf
    Reply  Fri Jul 31 10:36:22 2015, Steve, Update, PEM, X seismo station short cable removed IMG_0009.JPG
    Reply  Sat Aug 1 20:46:29 2015, Koji, Update, PEM, X seismo station short cable removed 
Entry  Thu Dec 19 19:45:12 2013, ericq, Update, Green Locking, X-Arm Green PDH Loop Stuff xarmPDHtfs.pdfxarmCLG.pdflayout.pdf
Entry  Tue Aug 14 04:53:45 2012, Yoichi, Summary, LSC, X-Arm noise spectrum xarm-spectrum.png
    Reply  Wed Aug 7 23:40:49 2013, gautam, Update, CDS, X-End Green ASS - A first update time-series.pdf
    Reply  Sat Aug 10 05:53:51 2013, gautam, Update, CDS, X-End Green ASS - Roundup New_ASX_MEDM_MAIN.pdf
    Reply  Mon Aug 12 12:57:59 2013, Jenne, Update, CDS, X-End Green ASS - Roundup 
    Reply  Mon Aug 12 13:30:33 2013, Jamie, Update, CDS, X-End Green ASS - Roundup 
Entry  Wed Aug 21 00:18:03 2013, Masayuki, Summary, Green Locking, X-arm PDH OLTF measurement IMG_1226.JPGIMG_1228.JPG
Entry  Wed Aug 21 19:37:25 2013, Masayuki, Summary, Green Locking, X-arm PDH OLTF measurement OLTF_PDH_Glock_6_5_2.png
Entry  Tue Apr 5 21:20:11 2011, Koji, Summary, Green Locking, X-arm cavity locked with LB1005 servo box servo.pngOLTF.pdf
Entry  Tue Jul 22 22:11:58 2008, Yoichi, Update, LSC, X-arm g factor measurement 
Entry  Sat Aug 18 03:55:12 2012, Yoichi, Summary, LSC, X-arm locking again MC_Trans.png
    Reply  Fri Feb 5 15:02:13 2016, gautam, Update, Green Locking, X-end NE cable 
Entry  Tue May 3 15:59:22 2011, steve, Frogs, Photos, X-mas comes early P1070634.JPG
Entry  Tue Jan 28 23:32:12 2014, Koji, Update, General, X/Y arm locked with the IR beam good_alignment.png
Entry  Wed Sep 10 22:17:29 2014, Koji, Summary, LSC, X/Y green beat mode overlap measurement 
    Reply  Mon Jun 22 12:57:09 2015, ericq, Summary, LSC, X/Y green beat mode overlap measurement redone 
    Reply  Mon Jun 22 14:53:37 2015, rana, Summary, LSC, X/Y green beat mode overlap measurement redone 
    Reply  Fri Oct 28 15:46:29 2016, gautam, Summary, LSC, X/Y green beat mode overlap measurement redone 
    Reply  Tue Oct 4 22:18:24 2016, Johannes, Update, General, X/YARM loss measurement anomalousData.png
    Reply  Wed May 8 22:36:42 2013, Koji, Update, ASS, XARM ASS (YARM ASS - faster and more precise convergence) XARM_ASS.png
Entry  Thu Mar 17 16:50:53 2022, Paco, Update, BHD, XARM AUX alignment 
    Reply  Fri Mar 18 17:15:19 2022, Paco, Update, BHD, XARM AUX alignment cont. Screen_Shot_2022-03-18_at_4.09.38_PM.png
    Reply  Mon Mar 21 18:00:05 2022, Ian MacMillan, Update, BHD, XARM AUX alignment cont. PXL_20220322_015247138.jpg
Entry  Wed Oct 13 15:36:38 2021, Hang, Update, Calibration, XARM OLTF Screenshot_2021-10-13_15-32-16.png
    Reply  Tue Sep 28 16:31:52 2021, Paco, Summary, Calibration, XARM OLTF (calibration) at 55.511 Hz OLTF_Calibration_Scheme.jpgXARM_POX_Lock_Model_TF.pdfXARM_OLTF_Total_Model.pdfXARM_OLTF_55p511_Hz_timeseries.pdfGmag_55p511_Hz_ASD.pdf
    Reply  Thu Sep 30 18:04:31 2021, Paco, Summary, Calibration, XARM OLTF (calibration) with three lines XARM_OLTF_Model_and_Meas.pdfGmag_ASD_nb_withTRX.pdf
Entry  Tue Aug 14 04:37:06 2012, Yoichi, Summary, LSC, XARM Open Loop Gain xarm-opltf.png
Entry  Mon Aug 30 17:49:43 2021, Paco, Summary, LSC, XARM POX OLTF XARM_POX_OLTF.pdfXARM_POX_Coh.pdf
    Reply  Tue Aug 31 14:55:24 2021, rana, Summary, LSC, XARM POX OLTF 
    Reply  Tue Sep 21 11:09:34 2021, Anchal, Summary, CDS, XARM YARM UGF Servo and Oscillators added 
    Reply  Wed Sep 22 12:40:04 2021, Anchal, Summary, CDS, XARM YARM UGF Servo and Oscillators shifted to OAF 
    Reply  Wed May 4 15:08:59 2022, Tega, Update, BHD, XARM alignment to get flashing IFO_XY_ARMS_Flashing.png
    Reply  Tue Sep 21 11:13:01 2021, Paco, Summary, Calibration, XARM calibration noise XARM_signal_asd.pdfXARM_demod_timeseries.pdfXARM_demod_asds.pdfXARM_cal_0921_timeseries.pdf
    Reply  Wed Sep 22 11:43:04 2021, rana, Summary, Calibration, XARM calibration noise 
Entry  Tue Mar 9 10:57:06 2021, Paco, Anchal, Summary, IMC, XARM lock and POX spectra 20210309_POX11_Spec_XARMLocked.pdf20210309_XARM_Locked.tar.gz
Entry  Thu Dec 3 19:10:28 2015, yutaro, Update, LSC, XARM lock with ITMX actuated and related change on ASS 40.png
    Reply  Mon Dec 7 15:56:35 2015, yutaro, Update, LSC, XARM lock with ITMX actuated and related change on ASS 
Entry  Tue Nov 6 15:36:03 2007, rob, Update, LSC, XARM locked 
    Reply  Fri Nov 4 00:13:24 2011, Koji, Update, LSC, XARM locked with POX11 POX11.pdf
    Reply  Mon Oct 3 21:24:02 2016, Johannes, Update, General, XARM loss measurement ReflectionLoss.pdf
ELOG V3.1.3-