40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 258 of 341  Not logged in ELOG logo
Entry  Mon Jun 9 17:32:14 2008, Yoichi, Configuration, PSL, PMC transmittance 
Entry  Mon Jun 9 17:57:59 2008, Yoichi, Configuration, PSL, PMC input power backed to the original 
Entry  Tue Jun 10 08:37:18 2008, steve, Update, PSL, beam trap is being tested trapss3w.png
Entry  Wed Jun 11 11:45:25 2008, steve, Update, PSL, ss trap works P1020534.pngP1020533.png
Entry  Fri Jun 13 11:17:25 2008, Yoichi, Update, PSL, PMC transmittance at high power 
Entry  Tue Jun 17 22:00:53 2008, John, HowTo, PSL, Problems turning MZ servo on/off 
Entry  Wed Jun 18 00:19:29 2008, rob, Update, PSL, MOPA trend MOPAtrend.png
Entry  Wed Jun 18 18:20:10 2008, Yoichi, Update, PSL, Investigation on the NPRO temperature stabilization glitches LTEC-loop-HeatGun-Response.pdfLTMP-glitches.pdf
Entry  Wed Jun 18 18:26:19 2008, Yoichi, Update, PSL, Finding the optimal operation temperature for the NPRO by the slow act scan FSS-slow-scan.pdf
Entry  Fri Jun 20 17:42:48 2008, steve, Update, PSL, SS trap scattering compared to black glass trap cSSt_1.pngcSSt_2.pngscatset_61908.pngcSSt&wBGt.pngcSStbeam.png
Entry  Wed Jun 25 18:03:21 2008, Yoichi, Configuration, PSL, FSS Input Offset slider problem 
Entry  Thu Jun 26 18:24:28 2008, Yoichi, Update, PSL, FSS input ofset slider problem - fixed 
Entry  Sun Jun 29 11:31:52 2008, John, Summary, PSL, ISS 
    Reply  Sun Jun 29 19:53:26 2008, John, Summary, PSL, ISS 
Entry  Sun Jun 29 20:29:48 2008, rana, Update, PSL, Correlation of PSL SLOW control v. Room temperature slowtemp.png
Entry  Mon Jun 30 13:48:47 2008, John, Rob, Configuration, PSL, Don't put the bin in front of the air conditioning unit binremoval.png
    Reply  Mon Jun 30 14:07:26 2008, Rob, Configuration, PSL, Don't put the bin in front of the air conditioning unit DSC_0140.png
Entry  Mon Jun 30 15:08:52 2008, John, Summary, PSL, MZ alignment mzalign.png
Entry  Mon Jun 30 18:36:01 2008, Yoichi, Update, PSL, MZ alignment again 
Entry  Tue Jul 1 10:15:22 2008, steve, Update, PSL, eventfull two days 2d.jpg
Entry  Tue Jul 1 11:57:24 2008, Yoichi, Configuration, PSL, MZ servo switch problem again 
Entry  Tue Jul 1 12:08:38 2008, John, Joe, Configuration, PSL, PMC input PD 
    Reply  Tue Jul 1 16:48:42 2008, rob, john, Configuration, PSL, MZ servo switch problem resolved forever 
Entry  Tue Jul 1 21:45:48 2008, John, Update, PSL, Mach Zehnder script and screen 
Entry  Mon Jul 7 13:49:27 2008, Yoichi, HowTo, PSL, MZ offset, gain tips 
Entry  Mon Jul 7 16:30:08 2008, steve, Update, PSL, PSL-PEM 16 days trend pempsl16d.jpg
Entry  Tue Jul 8 08:16:56 2008, steve, Update, PSL, PMC problem pmc.jpg
Entry  Tue Jul 8 12:25:54 2008, John, Summary, PSL, ISS gain set to 2dB 
Entry  Tue Jul 8 21:46:38 2008, Yoichi, Configuration, PSL, GC650M moved to the PMC transmission 
Entry  Fri Jul 11 09:29:02 2008, steve, Update, PSL, the PMC still hangs up pmc4d.jpg
Entry  Sat Jul 12 23:28:31 2008, rana, Update, PSL, PMC needs help Untitled.png
Entry  Sun Jul 13 17:19:29 2008, rana, Summary, PSL, MOPA SLOWM Calibration SLOWDCcalibration.png
Entry  Mon Jul 14 00:36:19 2008, John, Summary, PSL, Slow sweep of laser temp - PMC PZT response SlowTsweep.png
Entry  Tue Jul 15 10:24:57 2008, steve, Update, PSL, PMC temp & pzt voltage pmctemp.jpg
Entry  Wed Jul 16 17:36:51 2008, John, DAQ, PSL, FSS input offset 
Entry  Thu Jul 17 08:30:15 2008, steve, Update, PSL, PMC relocked manually pmc4d.jpg
Entry  Thu Jul 17 12:15:21 2008, Eric, Update, PSL, Swept PMC PZT voltage range 
Entry  Thu Jul 17 20:13:34 2008, Yoichi, Update, PSL, PMC alignment/mode matching effort 
Entry  Fri Jul 18 19:41:09 2008, Yoichi, Update, PSL, PMC PZT investigation Hysteresis.pngStepResponse.png
    Reply  Fri Jul 18 23:24:24 2008, rob, Update, PSL, PMC PZT investigation 
    Reply  Sat Jul 19 19:39:44 2008, rob, Update, PSL, PMC PZT investigation 
Entry  Sat Jul 19 19:41:56 2008, Yoichi, AoG, PSL, The author of the entry 702 is Yoichi not Rob 
Entry  Tue Jul 22 03:03:22 2008, John, Rob, Update, PSL, FSS open loop transfer function 
Entry  Tue Jul 22 09:24:17 2008, steve, Update, PSL, laser power power120d.jpg
Entry  Tue Jul 22 11:55:22 2008, rana, Update, PSL, Note from R. Abbott re: the PMC 
    Reply  Tue Jul 22 13:15:14 2008, rob, Update, PSL, Note from R. Abbott re: the PMC 
    Reply  Tue Jul 22 13:16:09 2008, John, Rob, Update, PSL, FSS open loop transfer function 
Entry  Wed Jul 23 01:42:26 2008, rana, Configuration, PSL, FSS RFPD: Examined, "repaired", and re-installed Untitled.pdf
Entry  Wed Jul 23 18:42:18 2008, Jenne, Update, PSL, Alignment of AOM 
Entry  Thu Jul 24 19:29:26 2008, Yoichi, Configuration, PSL, C1:PSL-STAT_FSS_NOM_C_GAIN is changed from 30 to -0.7 
ELOG V3.1.3-