ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
4021
|
Tue Dec 7 17:19:33 2010 |
kiwamu | Update | Computers | pyNDS available | I moved the Pynds |
|
4023
|
Tue Dec 7 19:34:58 2010 |
kiwamu | Update | CDS | rebooted DAQ and all the front end machines | I
found that all the front end machine showed
the red light indicators of DAQ on the XXX_GDS_TP.adl |
|
4024
|
Tue Dec 7 20:38:17 2010 |
kiwamu | Update | SUS | watchdogs off at ITMX and ETMX | I am leaving ITMX and ETMX freely swinging,
so that later I can take the spectra and
diagonalize the input matrices. |
|
4026
|
Wed Dec 8 12:47:18 2010 |
kiwamu | Update | SUS | diagonalisation of ITMX input matrix | The input
matrix of ITMX has been diagonalized. |
|
4030
|
Wed Dec 8 22:35:50 2010 |
kiwamu | Update | SUS | oplev installed on ITMX and ETMX | The oplevs
have been installed on ITMX and ETMX. |
|
4031
|
Wed Dec 8 22:47:09 2010 |
kiwamu | Update | SUS | watchdogs off at ITMX and ETMX | Tonight,
swing again.
|
|
4036
|
Thu Dec 9 12:24:46 2010 |
kiwamu | Update | SUS | strange ETMX suspension | [Koji, Osamu and Kiwamu]
We
found that the ETMX free swinging spectra |
|
4038
|
Thu Dec 9 22:04:40 2010 |
kiwamu | Update | SUS | Re:strange ETMX suspension | [Koji, Osamu and Kiwamu]
We
checked the ETMX suspension and found the |
|
4039
|
Thu Dec 9 23:17:47 2010 |
kiwamu | Update | SUS | beam pointing has been done | [Koji, Osamu and Kiwamu]
We |
|
4044
|
Sat Dec 11 00:41:55 2010 |
kiwamu | Update | IOO | alignment of IP_ANG is done | [Jenne, Koji and Kiwamu]
|
|
4049
|
Mon Dec 13 22:21:41 2010 |
kiwamu | Summary | SUS | funny output matrix of ETMX: solved ! | I found that
a few connections in the simulink model of |
|
4050
|
Tue Dec 14 01:04:23 2010 |
kiwamu | Update | SUS | alignment of ITMs and PRM done | The alignment of the ITMs |
|
4054
|
Tue Dec 14 15:15:19 2010 |
kiwamu | Update | SUS | put ETMY and aligned the beam | [Zach and Kiwamu]
We |
|
4055
|
Tue Dec 14 22:42:56 2010 |
kiwamu | Update | SUS | installed the last TT . And some more progresses | [Koji, Oasmu and Kiwamu]
|
|
4063
|
Thu Dec 16 01:23:43 2010 |
kiwamu | Update | SUS | SRM OSEMs installed | [Zach and Kiwamu]
We worked |
|
4068
|
Fri Dec 17 02:22:06 2010 |
kiwamu | Update | CDS | ETMY damping: not good | I made some efforts
in order to damp ETMY, however it still doesn't |
|
4070
|
Sat Dec 18 01:17:04 2010 |
kiwamu | Update | IOO | some more alignments | [Koji and Kiwamu]
We did some more vacuum
works today. It is getting ready to pump |
|
4075
|
Mon Dec 20 10:06:36 2010 |
kiwamu | Update | CDS | ETMY damped | Last Saturday
I succeeded in damping the ETMY suspension |
|
4080
|
Mon Dec 20 23:32:58 2010 |
kiwamu | Update | IOO | Re:checking out & closing the vacuum chambers | |
|
4084
|
Tue Dec 21 16:34:42 2010 |
kiwamu | Summary | VAC | All the test masses have been wiped | [Jenne and Kiwamu]
We wiped all the test masses with |
|
4090
|
Wed Dec 22 21:38:47 2010 |
kiwamu | Configuration | VAC | Re:slow pumpdown at 12 hours | I stopped the pumping at 9:30 pm. Now
we are at 29 torr.
|
|
4093
|
Thu Dec 23 12:19:43 2010 |
kiwamu | Update | Green Locking | installed doubling oven base at PSL table | I
gave a christmas present to a doubling oven
who has been sitting on the PSL table. |
  |
4102
|
Mon Jan 3 10:32:27 2011 |
kiwamu | Summary | elog | found hung - restarted | Found
exactly the same error messages at the end |
|
4105
|
Tue Jan 4 13:57:48 2011 |
kiwamu | Update | IOO | incident mirror changed from 45deg to 0 deg | I replaced the final steering mirror
(Y1-1037-45-S)
in the zig-zag path on the PSL table by a |
|
4108
|
Tue Jan 4 21:21:57 2011 |
kiwamu | Update | IOO | PZTs are connected to c1iscaux | I connected
PZT1 and PZT2 to a slow front end machine |
|
4110
|
Wed Jan 5 03:06:02 2011 |
kiwamu | Update | IOO | beam spots on MC mirrors | I checked
the spot positions on MC1 and MC3 by running |
|
4113
|
Wed Jan 5 16:11:17 2011 |
kiwamu | Summary | IOO | temporary PZT connection | |
|
4122
|
Fri Jan 7 00:14:36 2011 |
kiwamu | Update | IOO | EOM triple resonant box is working | I
checked the triple resonant box for the broadband |
|
4131
|
Tue Jan 11 01:05:29 2011 |
kiwamu | Update | LSC | obtained Xarm PDH signal | [Jenne, Zach, Kiwamu]
|
|
4141
|
Wed Jan 12 01:39:49 2011 |
kiwamu | Update | LSC | locked X arm | [Suresh, Kiwamu]
|
|
4142
|
Wed Jan 12 02:41:19 2011 |
kiwamu | Update | General | daytime tasks for tomorrow | [Rana, Kiwamu]
Here
is the list for the daytime tasks of tomorrow, |
|
4146
|
Wed Jan 12 22:33:24 2011 |
kiwamu | Update | CDS | MC2 dewhitening are healthy except for UR | I briefly
checked the MC2 analog dewhitening filters.
It |
|
4153
|
Fri Jan 14 01:55:26 2011 |
kiwamu | Update | LSC | X arm locked with C1LSC digital control | [Koji, Kiwamu]
|
|
4154
|
Fri Jan 14 11:29:00 2011 |
kiwamu | Update | LSC | expected open loop TF of X arm locking | Here shows a plot of the expected open
loop transfer function (TF) for the X arm
locking. |
|
4159
|
Fri Jan 14 20:37:00 2011 |
kiwamu | HowTo | Green Locking | plan for this month | I summarized how we proceed our green
locking in this month on the wiki.
Since step1 and 2 shown on the wiki |
|
4171
|
Thu Jan 20 00:39:22 2011 |
kiwamu | HowTo | CDS | DAQ setup : another trick | Here
is another trick for the DAQ setup when you
add a DAQ channel associated with a new front |
|
4173
|
Thu Jan 20 04:03:02 2011 |
kiwamu | Update | CDS | c1scy error | I found
that c1scy was not running due to a daq initialization |
|
4174
|
Thu Jan 20 04:43:28 2011 |
kiwamu | Update | Green Locking | status update: PLL connected to ADC | I
connected the PLL signal to the ADC on c1ioo. |
|
4176
|
Thu Jan 20 15:15:39 2011 |
kiwamu | Update | Green Locking | status update: PLL connected to ADC | I
realized that the black AA board I mentioned |
|
4181
|
Fri Jan 21 02:45:43 2011 |
kiwamu | Update | Green Locking | interface for PLL to ADC | [Suresh, Kiwamu]
|
|
4189
|
Sat Jan 22 02:11:09 2011 |
kiwamu | Update | Green Locking | some more progress | [Rana, Suresh, Kiwanu]
|
|
4191
|
Mon Jan 24 02:58:46 2011 |
kiwamu | Update | Green Locking | X arm locked ! | I succeeded in |
 |
4195
|
Mon Jan 24 13:08:07 2011 |
kiwamu | Update | Green Locking | Re: X arm locked ! |
|
|
4196
|
Mon Jan 24 14:27:13 2011 |
kiwamu | Update | Green Locking | Re: X arm locked ! |
|
|
4198
|
Tue Jan 25 05:26:51 2011 |
kiwamu | Update | Green Locking | cavity scan | |
|
4199
|
Tue Jan 25 06:48:55 2011 |
kiwamu | Update | Green Locking | To do list | Here are some
tasks that I want someone to work on during |
|
4261
|
Tue Feb 8 15:22:13 2011 |
kiwamu | Update | Green Locking | new electronics rack at X end | Yesterday
I moved the whole green electronics stuff,
which had been sitting on the floor at the |
|
4268
|
Thu Feb 10 05:06:35 2011 |
kiwamu | Update | Green Locking | beat noise : a little bit better, and 1Hz peak from amplitude noise coupling | I
repeated the same measurement as that Koji |
 |
4278
|
Sun Feb 13 15:02:23 2011 |
kiwamu | Update | Green Locking | X arm beam offcentering has been measured | The amounts
of the X arm's beam off-centering have been |
|
4280
|
Sun Feb 13 16:50:17 2011 |
kiwamu | Update | ASC | IP_ANG was at wrong ADC | I found that |
|