  12385   Tue Aug 9 13:53:57 2016 babbottUpdateSEIlong Guralp EX cable repaired on the D-sub sideI checked out the cable that I
took from you, and all of the connections
  
  12386   Tue Aug 9 15:27:57 2016 gautam UpdateSUSETMY patch-upThe pickle
pickers came off nicely and both magnets
seem to be glued on okay. The alignment of
 IMG_2996.JPGIMG_2997.JPG 
  12387   Tue Aug 9 15:50:30 2016 PrafulUpdateGeneralGuralp CableThe Guralp cable has been reconnected and
powered after having the connector changed
out.
  
  12388   Tue Aug 9 16:19:27 2016 SteveUpdateSUStorque driver for wire clampNew
Wiha 28504 torque wrench for SOS wire
clamping. It's range 7.5  - 20 in-lb
  
  12389   Tue Aug 9 19:35:49 2016 ranaUpdateSEIboth Guralp seismometers are functioning and being acquiredAfter
some cable swapping, we now have both Guralp
seismometers running and the times series
 1goodday.png 
  12390   Wed Aug 10 03:08:03 2016 gautam UpdateSUSETMY patch-up[lydia, gautam]

Rana felt it was alright to use
the wire clamp and suspension cage in its
  
  12391   Wed Aug 10 10:32:44 2016 SteveUpdateSEIworking Guralps as they areThe saga has started
here  We have to give credit to
the Boss who fixed it. The seismometers themself
 6x 
  12392   Wed Aug 10 15:34:24 2016 SteveUpdateSUS6 in-lbs torque driver for wire clamp screwThe 7.5 in-lb of Wiha seems at the upper
end of torque range for a 4-40 SS screw

Wiha 28502 ordered with range 5
  
  12393   Wed Aug 10 17:20:16 2016 LydiaUpdateGeneralSeismometer channel names changed[ericq, Lydia]

We
changed the seismometer channel names from,
  
  12394   Wed Aug 10 17:30:26 2016 Max IsiUpdateGeneralSummary pages statusSummary pages are currently empty due to a
problem with the code responsible for locating
frame files in the cluster. This should be
  
  12395   Wed Aug 10 18:10:26 2016 PrafulUpdateElectronicsMic AmplifierI set up 3 of my circuits in the interferometer
near MC2 to do a huddle test. I have the
signals from my microphones going into C1:PEM-MIC_1_IN1,
 huddle_setup.jpgmore_setup.jpgmic_setup.jpg 
  12396   Wed Aug 10 19:37:08 2016 gautamUpdateElectronicsMic AmplifierIn order to help Praful do his huddle test,
I have temporarily arranged
for the outputs of the 3 channels he wants
  
  12397   Wed Aug 10 23:45:03 2016 gautam UpdateSUSETMY re-suspendedSummary:


 7x 
  12398   Thu Aug 11 00:20:41 2016 KojiUpdateSUSETMY re-suspendedHow much pitch bias do you need in order
to correct this pitch misalignment?
That may give you the idea how bad
  
  12399   Thu Aug 11 11:09:52 2016 Max IsiUpdateGeneralSummary pages statusThis problem has been fixed. 

> Summary pages are currently empty due to
  
  12400   Thu Aug 11 11:51:38 2016 PrafulUpdateComputer Scripts / ProgramsSummary PagesThe summary pages have been updated with
the new naming seismometer channel naming
conventions. Here's a link to them working
  
  12401   Thu Aug 11 11:56:40 2016 gautamUpdateSUSETMY re-suspended


 pitchBalancingWithBias.PDF 
  12402   Thu Aug 11 17:30:05 2016 PrafulUpdateElectronicsMic AmplifierThe results of my first huddle test were
not so good- one of the signals did not match
the other two very well- so I changed the
 new_setup.jpgnew_setup2.jpg 
  12404   Fri Aug 12 14:37:34 2016 SteveUpdateSEIworking seismometers as they are2.1 mag earth quake in Norhten Ca

Our seimometers need professorial
centering. Related electronics must be checked
 eq_2.1m_Geysers_CA.pngeq2.1m_GeysersCA.pngoscillations.png 
  12405   Fri Aug 12 19:13:25 2016 PrafulUpdateElectronicsMic Self NoiseI used the Wiener filtering method described
by Ignacio and Jessica (https://dcc.ligo.org/DocDB/0119/T1500195/002/SURF_Final.pdf
and https://dcc.ligo.org/public/0119/T1500194/001/Final_Report.pdf)
 8x 
  12406   Fri Aug 12 21:26:28 2016 ranaUpdatePEMMic Self NoiseSeems to good to be true. Maybe you're
over fitting? Please put all the traces on
one plot and let us know how you do the parameter
  
  12407   Sat Aug 13 18:25:22 2016 gautamUpdateCOCRC folding mirrors - Numerical reviewThis elog
is meant to summarize my numerical simulations
for looking into the effects of curvature
 PRX_consolidated.pdfSRX_consolidated.pdfGouy_PRC.pdfGouy_SRC.pdf 
  12408   Mon Aug 15 12:23:56 2016 PrafulUpdatePEMMic Self NoiseI didn't have a separate training set
and data set, so I think that's why the
graphs came out looking too good. The units
 9x 
  12409   Mon Aug 15 14:29:32 2016 SteveUpdateSUSSOS sus wire orderedThe wire will arrive in 1-2 weeks. It is
a new production. Brad Snook of Ca Fine Wire
was suprised that we are still using the
  
  12410   Mon Aug 15 14:34:33 2016 ericqUpdateSUSSOS sus wire orderedWe have indeed seen numerous tarnished/rusty
points along the wires, and just tried to
choose lengths free of any of these. I wonder
  
  12411   Mon Aug 15 18:28:15 2016 gautamUpdateSUSAir-bake preparationI
assume that we are prepared to live with
the pitch bias situation of ETMY
 IMG_6816.JPG 
  12412   Tue Aug 16 08:04:49 2016 SteveUpdateSUSETMY had Aluminum bridgeThe SOS ETMY tower had and Aluminum bridge.
How is it possible that this was true? Is
SS better than Al for some quantitative
 AlBridge.jpg 
  12413   Tue Aug 16 11:51:43 2016 gautamUpdateCOCRC folding mirrors - Numerical reviewSummary of roundtable meeting yesterday
between EricG, EricQ, Koji and Gautam:

We identified two possible courses
 PRC_consolidated.pdfSRC_consolidated.pdfGouyPRC.pdfGouySRC.pdf 
  12414   Tue Aug 16 16:38:00 2016 gautamUpdateCOCRC folding mirrors - Numerical reviewHere are the results for case 2: (flat
PR3/SR3, for purpose of simulation, I've
used a concave mirror with RoC in the range
 PRC_consolidated.pdfSRC_consolidated.pdfGouyPRC.pdfGouySRC.pdf 
  12415   Tue Aug 16 21:54:27 2016 gautamUpdateSUSAir-bake - IN PROGRESSI
put in both ETMX and ETMY into the air-bake
oven at approximately 8.45pm tonight.
 IMG_3005.JPG 
  12416   Wed Aug 17 08:47:43 2016 ericqUpdateSUSAir-bake finishedI turned off the air bake oven at 8:45AM.
I'll leave the optics alone for a bit
while it cools.
  
  12417   Wed Aug 17 14:37:36 2016 gautamUpdateCOCRC folding mirrors - Numerical review


 PRG.pdf 
  12418   Wed Aug 17 16:28:46 2016 KojiUpdateCOCRC folding mirrors - Numerical reviewFor the given range of the PR3/SR3 RoCs
for both cases, all the resulting numbers
such as TMSs/mode matching ratios look reasonable
  
  12419   Wed Aug 17 22:09:04 2016 ranaUpdateSUSSOS sus wire orderedNot really true that it passed. That's
just an arbitrary margin. Best to throw away
all the old wire. We have no quantitative
  
  12420   Wed Aug 17 23:00:57 2016 gautamUpdateSUSAir-bake of towersI just put in the following into the air
bake oven for a 12 hour, 70C bake:


ETMX and ETMY cages (with
 IMG_3006.JPG 
  12421   Thu Aug 18 08:17:16 2016 SteveUpdateSUSwire clamping preparationThe wire inprints were removed by 800P
grain paper [Norton 73568] The SS bridge
block now has an undesireble vally in the
 800P.jpg 
  12422   Thu Aug 18 14:14:20 2016 gautamUpdateSUSAir-bake of towers - finishedI took the two cages, wires and wire clamps
out this morning, back into the cleanroom
after their 12 hour 70C bake. 
  
  12423   Thu Aug 18 15:16:09 2016 SteveUpdateSUSSOS sus wire is in 

Stress Relieved 0.0017" 
Music Wire  CFW P/N: CFW2035025,  
 0.0017new.jpg 
  12424   Fri Aug 19 22:51:12 2016 gautamUpdateSUSETMs first-contactedI've applied first contact to both
the ETMs. They're now ready to be suspended.
I've also cut up some lengths of the
  
  12426   Sun Aug 21 16:23:05 2016 gautamUpdateSUSETMX suspended
ETMX has been successfully suspended
I've
used one of the new wire clamps, and also
the new suspension wire 
Because
 IMG_3018.JPG 
  12427   Sun Aug 21 17:21:22 2016 PrafulUpdateElectronicsProblems with PCB CircuitFor the past week, I've been trying
to make a soldered amplifier circuit to use
in a prototype box, However, I've been
 18x 
  12428   Mon Aug 22 13:06:11 2016 gautamUpdateSUSETMY suspendedToday morning, I suspended ETMY and made
the same checks dscribed below. The clamping
went smoothly, 5 in. lb. of torque seems
 IMG_3019.JPG 
  12429   Mon Aug 22 16:33:32 2016 SteveUpdatePEMthe lab temp is upThe IFO room temp is up a bit and it is
coming down. The out side temp is not really
high.
 temp.png 
  12430   Mon Aug 22 18:04:24 2016 gautamUpdateSUSETMY OSEMs inserted[Johannes, gautam]

We worked on trying to insert the
OSEMs in the optimal positions such that
  
  12431   Mon Aug 22 18:35:16 2016 PrafulUpdatePEMthe lab temp is upThe temperature is decreasing slowly but
is still above 24 C.

 temp_plot.pngtemp_plot.pngtemp_plot.png 
  12432   Tue Aug 23 09:50:17 2016 Max IsiUpdateGeneralSummary pages down due to cluster maintenance Summary pages down today due to schedulted
LDAS cluster maintenance. The pages will
be back automatically once the servers are
  
  12433   Tue Aug 23 17:05:20 2016 PrafulUpdateElectronicsSoldered Circuit WorkingI remade another soldered circuit, adding
extra 100uF electrolytic bypass capacitors
at the input and output of the voltage regulator
 10x 
  12434   Tue Aug 23 19:35:38 2016 gautamUpdateSUSETMY back in IFO[johannes,
gautam]
 10x 
  12435   Tue Aug 23 22:58:16 2016 KojiUpdateElectronicsDecoupling capacitor 101What I suggested was:
- For most cases, power decoupling
capacitors for the regulators should be ~100nF
  
  12436   Wed Aug 24 14:11:09 2016 PrafulUpdateElectronicsMicrophone TestingI added an EM172 to my soldered circuit
and it seems to be working so far. I have
taken a spectra using the EM172 in ambient
 white_v_ambient.pngwhite_v_ambient.pdfwhite_v_ambient.pdf 