40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 244 of 350  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  10977   Wed Feb 4 21:05:24 2015 manasaUpdateGeneralRF amplifier for ALSThe components of the RF amplifier
box are in place. The RF amplifier box has
been mounted on the IOO rack and the front
 RFampBox.png 
  10978   Wed Feb 4 21:09:43 2015 manasaUpdateGeneralX endtable work scheduled tomorrowThe X end fiber setup will be put together
tomorrow morning.
  
  10979   Thu Feb 5 04:35:14 2015 diegoUpdateLSCCARM Transition to REFL11 using CM_SLOW Path[Diego, Eric]

Tonight was a sad night... We continued
to pursue our strategy, but with very poor
 4Feb2015_Transition_CARM_REFL11_CM_SLOW_AP_18.png 
  10981   Thu Feb 5 15:21:25 2015 manasaUpdateGeneralX endtable work [EricG, Manasa]

We were at the X end today trying
to couple AUX X light into the fiber. 
  
  10982   Fri Feb 6 03:21:17 2015 diegoUpdateLSCCARM Transition to REFL11 using CM_SLOW Path[Diego, Jenne]

We kept struggling with the PRMI,
although it was a little better than yesterday:
  
  10983   Fri Feb 6 10:03:23 2015 SteveUpdatePEMdusty days 




 duststorm.png 
  10984   Fri Feb 6 15:29:29 2015 ericqUpdateCDSNetwork ShenanigansJust now we had another EPICS freeze. The
network was still up; i.e. I could ssh to
chiara and fb, who both seemed to be
  
  10985   Fri Feb 6 18:06:18 2015 manasaUpdateGeneralFiber Optic module for FOLI pulled out the Fiber Optic Module for
FOL from the rack inside the PSL table enclosure
and modified it. The beat PDs were moved
 FOLfiberModule.png 
  10987   Sat Feb 7 21:30:45 2015 JenneUpdateLSCPRC alignedI'm leaving the PRC aligned and locked. 
Feel free to unlock it, or do whatever with
the IFO.
  
  10989   Mon Feb 9 08:40:49 2015 SteveUpdateSUSrecent earthquake 4.9Baja 4.9 m earth quake tripped suspentions,
except ETMX Sus damping recovered. MC is
locking.
 M4.9Baja.png 
  10990   Mon Feb 9 17:23:17 2015 diegoUpdateComputer Scripts / ProgramsNew laptopsI forgot to elog about these ones, my bad...
The new/updated laptops are giada, viviana
and paola; paola is already in the lab, while
  
  10991   Mon Feb 9 17:47:17 2015 diegoUpdateLSCCM servo & AO path statusI wrote the script with the recipe we used,
using the Yarm and AS55 on the IN2 of the
CM board; however, the steps where the offset
  
  10992   Tue Feb 10 02:40:54 2015 JenneUpdateLSCSome locking thoughts on PRMI[EricQ, Jenne]

We wanted to make the PRMI lock
more stable tonight, which would hopefully
  
  10994   Tue Feb 10 03:09:02 2015 ericqUpdateLSCSome locking thoughts on PRMIUnfortunately, we only had one good CARM
offset reduction to powers of about 25, but
then my QPD loop blew it. We spent the vast
  
  10995   Tue Feb 10 13:48:58 2015 manasaUpdateLSCProbable cause for headaches last nightI
found the PSL enclosure open (about
  
  10996   Tue Feb 10 16:01:21 2015 manasaUpdateGeneralAUX X fiber coupled 72%Plan
C finally worked. We have
 AUXxTelescope.png 
  10997   Tue Feb 10 18:37:17 2015 ericqUpdateASCQPD ASC ready to goI've remeasured the QPD ASC sensing
coefficients, and figured out what I did
weird with the actuation coefficients. I've
 Feb10_loops_offOn.pngFeb10_newLoops_offOn.xml.zip 
  10998   Wed Feb 11 00:07:54 2015 ranaUpdateLSCLock Loss plotHere is a lock loss from around 11 PM tonight.
Might be due to poor PRC signals.  
 1107673198.png1107673198.png 
  10999   Wed Feb 11 02:42:05 2015 JenneUpdateLSCPRC error signal RF spectraSince we're having trouble keeping
the PRC locked as we reduce the CARM offset,
and we saw that the POP22 power is significantly
 REFL33_25.pdfREFL33_15.pdf 
  11000   Wed Feb 11 03:41:12 2015 KojiUpdateLSCPRC error signal RF spectraAs the measurements have been done under
feedback control, the lower RF peak height
does not necessary mean
  
  11001   Wed Feb 11 04:08:53 2015 JenneUpdateLSCNew Locking Paradigm?[Rana, Jenne]

While meditating over what to do
about the fact that we can't seem to
  
  11002   Wed Feb 11 16:49:41 2015 ranaUpdateelogELOGD restartedNo elog
response from outside and no elogd process
  
  11003   Wed Feb 11 17:31:11 2015 ericqUpdateLSCRFPD spectraFor future reference, I've taken spectra
of our various RFPDs while the PRMI was sideband
locked on REFL33, using a 20dB RF coupler
 REFL.pngAS.pngPOP.png2015-02-PDSpectra.zip 
  11004   Wed Feb 11 18:07:42 2015 ericqUpdateLSCRFPD spectraAfter some discussion with Koji, I've
asked Steve to order some SBP-30+ bandpass
filters as a quick and cheap way
  
  11006   Wed Feb 11 18:44:53 2015 manasaUpdateGeneralOptical fiber moduleI have moved the optical fiber
module for FOL to the PSL table. It is setup
on the optical table right now for testing.
  
  11007   Wed Feb 11 22:13:44 2015 JenneUpdateLSCNew Locking Paradigm - LSC model changesIn order to try out the new locking scheme
tonight, I have modified the LSC model. 
Screens have not yet been made.
  
  11008   Thu Feb 12 01:00:18 2015 ranaUpdateLSCRFPD spectraThe nonlinearity in the LSC detection chain
(cf T050268)
comes from the
  
  11009   Thu Feb 12 01:43:09 2015 ranaUpdateLSCNew Locking Paradigm - LSC model changesWith the  TF.gif 
  11010   Thu Feb 12 03:43:54 2015 ericqUpdateLSC3F PRMI at zero ALS CARMI have been able to recover the ability
to sit at zero CARM offset while the PRMI
is locked on RELF33 and CARM/DARM are on
 Feb12_negativeTR.png 
  11011   Thu Feb 12 11:14:29 2015 JenneUpdateLSCNew Locking Paradigm - Loop-gebraI have calculated the response of this
new 2.5 loop system.

The first attachment is my block
 ALS_REFL_comboLockingCartoon_11Feb2015.PDFALS_REFL_comboLocking_11Feb2015.zip 
  11012   Thu Feb 12 11:59:58 2015 KojiUpdateLSCNew Locking Paradigm - Loop-gebraThe goals are:

- When the REFL path is
dead (e.g. S_REFL = 0), the system goes back
  
  11013   Thu Feb 12 12:16:04 2015 manasaUpdateGeneralFiber shielding[Steve, Manasa]

The fibers around the PSL table
were shielded to avoid any tampering.
  
  11014   Thu Feb 12 12:23:21 2015 manasaUpdateGeneralWaking up the PDFR measurement system[EricG, Manasa]

We woke up the PDFR measurement
setup that has been sleeping since summer.
  
  11015   Thu Feb 12 15:21:37 2015 ericqUpdateComputer Scripts / Programsnetgpib updatesI've fixed the gpib scripts for the
SR785 and AG4395A to output data in the same
format as expected by older scripts when
  
  11016   Thu Feb 12 19:18:49 2015 JenneUpdateLSCNew Locking Paradigm - Loop-gebraEDIT, JCD, 17Feb2015:  Updated loop
diagram and calculation: http://131.215.115.52:8080/40m/11043


Okay, Koji and I talked
  
  11017   Thu Feb 12 22:28:16 2015 JenneUpdateLSCNew Locking Paradigm - LSC model changes, screens modifiedI have modified the LSC trigger matrix
screen, as well as the LSC overview screen,
to reflect the modifications to the model
  
  11018   Thu Feb 12 23:40:12 2015 ranaUpdateIOOBounce / Roll stopband filters added to MC ASC filter banks   59.png 
  11019   Thu Feb 12 23:47:45 2015 KojiUpdateLSC3f modulation cancellation- I built another beat setup on the PSL
table at the South East side of the table.
- The main beam is not touched, no
  
  11020   Fri Feb 13 03:28:34 2015 ranaUpdateLSCNew Locking Paradigm - Loop-gebraNot
so fast!

In the drawing,
the FF path should actually be summed in
  
  11021   Fri Feb 13 03:44:56 2015 JenneUpdateLSCHeld using ALS for a while at "0" CARM offset with PRMI[Jenne, Rana]

We wanted to jump right in and
see if we were ready to try the new "ALS
 QPDsaturation_12Feb2015.pdfALSfool_12Feb2015.pdf 
  11022   Fri Feb 13 14:27:30 2015 ericqUpdateElectronicsSecond QPD Whitening Switch enabledI have re-enabled the second whitening
stage switching on each quadrant of each
end's QPD whitening board, to try and
  
  11023   Fri Feb 13 14:59:13 2015 ericqUpdateElectronicsSecond QPD Whitening Switch enabledWent to zero CARM offset on ALS; transmission
QPDs are still saturating :(

Maybe we need to switch off all
  
  11024   Fri Feb 13 17:07:51 2015 JenneUpdateElectronicsSecond QPD Whitening Switch enabledI first updated the DCC branches for the
Xend and Yend to reflect the as-built situation
from December 2014, and then I updated the
  
  11025   Fri Feb 13 18:56:44 2015 ranaUpdateElectronicsSecond QPD Whitening Switch enabledDepends on the plots of the whitening I
guess; if its low freq sat, then we lower
the light level with ND filters. If its happening
  
  11026   Fri Feb 13 19:41:13 2015 ericqUpdateGeneralRF amplifier for ALSAs Koji found one of the spare channels
of the ALS/FOL RF amplifier box nonfunctional
yesterday, I pulled it out to fix it. I found
  
  11027   Sat Feb 14 00:42:02 2015 KojiUpdateGeneralRF amplifier for ALSThe RF analyzer was returned to the control
room. There are two beat notes from X/Y confirmed.

I locked the arms and aligned them
  
  11028   Sat Feb 14 00:48:13 2015 KojiUpdateLSC3f modulation cancellation[SUCCESS]
The 3f sideband cancellation seemed worked
nicely.
  
  11030   Sat Feb 14 20:20:24 2015 JenneUpdateLSCALS fool cartoonThe ALS fool scheme is now diagrammed up
in OmniGraffle, including its new official
icon.  The mathematica notebook has
 ALSfool_LoopDiagram.pngALSfool_LoopDiagram.graffle.zip 
  11037   Mon Feb 16 02:49:57 2015 JenneUpdateLSCALS fool measured decoupling TFI have measured very, very carefully the
transfer function from pushing on
MC2 to the Yarm ALS beatnote. 
 ALSfool_measuredActuatorTF_YarmOnly_15Feb2015.pngYARM_actTF_compareActuators.pdf 
  11038   Mon Feb 16 03:10:42 2015 KojiUpdateLSCALS fool measured decoupling TFWonkey shape: Looks like a loop supression.
Your http://nodus.ligo.caltech.edu:8080/40m/11016
also suggests it too, doesn't it?
  
ELOG V3.1.3-