40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 242 of 344  Not logged in ELOG logo
    Reply  Mon Oct 2 18:50:55 2017, jamie, Update, CDS, c1ioo DC errors 
    Reply  Tue Oct 17 17:53:25 2017, jamie, Summary, LSC, prep for tests of Gabriele's neural network cavity length reconstruction c1dnn.png
    Reply  Wed Oct 18 01:41:32 2017, jamie, Update, CDS, FEs unresponsive 
    Reply  Wed Oct 18 09:21:22 2017, jamie, Update, CDS, FEs unresponsive 
    Reply  Wed Oct 18 12:14:08 2017, jamie, Summary, LSC, prep for tests of Gabriele's neural network cavity length reconstruction 
    Reply  Thu Oct 19 15:42:03 2017, jamie, Summary, LSC, MICH/PRCL reconstruction neural network running on c1lsc NN.pngC1DNN_GDS.pngC1DNN_CPU_METER.png
    Reply  Tue Oct 24 20:14:21 2017, jamie, Summary, LSC, further testing of c1dnn integration; plugged in to DAQ NN.pngc1dnn_out.png
    Reply  Mon Nov 6 18:22:48 2017, jamie, Summary, LSC, current procedure for running c1dnn code 
    Reply  Fri Dec 15 01:53:37 2017, jamie, Update, CDS, CDS recovery, NFS woes 
Entry  Tue Sep 14 15:57:05 2021, jamie, Frogs, CDS, fb1 /var full after reboot, caused all sorts of problems 
    Reply  Tue Sep 14 16:44:54 2021, jamie, Frogs, CDS, fb1 /var full after reboot, caused all sorts of problems 
Entry  Mon Apr 7 15:26:32 2014, jamie, ericq, Update, CDS, aborted attempt to update c1sus machine with second CPU Screenshot-Untitled_Window.png
    Reply  Tue Aug 16 11:49:17 2011, jamie, jenne, Update, General, today's work to do 
    Reply  Mon Aug 20 13:10:31 2012, jamie, jenne, Update, SUS, ETMX is not happy 
Entry  Mon Nov 5 19:38:52 2012, jamie, jenne, ayaka, den, Update, Alignment, more alignment woes 
Entry  Tue Aug 23 14:49:14 2011, jamie, jenne, kiwamu, suresh, keiko, Update, SUS, Adjustment of ETMY, issue with ITMY whitening ITMY.pngETMY.png
Entry  Wed Aug 24 11:30:27 2011, jamie, jenne, kiwamu, suresh, steve, Update, SUS, ETMX wiped, replaced, door on 
Entry  Wed Aug 24 11:40:21 2011, jamie, jenne, kiwamu, suresh, steve, Update, SUS, problem with ITMX 
Entry  Thu Aug 18 00:53:48 2011, jamie, kiwamu, suresh, jenne, Update, General, PUMP PLAN ABORTED; need to work more on IFO alignment Beam_spot_shifts.png
Entry  Wed Aug 17 20:14:49 2011, jamie, kiwamu, suresh, jenne, keiko, anamaria, Update, General, in-vacuum work status, prep for pump 
Entry  Tue Oct 23 17:30:33 2012, jamie, nic, jenne, raji, manasa, Update, Alignment, Initial attempts to fix IFO alignment 
    Reply  Thu Oct 24 09:08:27 2013, jamie., Update, LSC, PRMI + 2 ALS arms 
Entry  Thu Aug 13 11:20:43 2009, janosch, HowTo, PEM, three-channel self-noise estimation 
Entry  Wed Jul 25 15:33:55 2012, janosch, Update, LSC, ringdown measurement Rindown1.png
Entry  Thu Jul 26 13:10:51 2012, janosch, Update, LSC, modelled ringdown Ringdown.png
Entry  Tue Aug 28 18:28:21 2012, janosch, Metaphysics, Ringdown, ripples  
    Reply  Tue Aug 28 19:21:37 2012, janosch, Metaphysics, Ringdown, ripples  
    Reply  Wed Aug 29 09:35:03 2012, janosch, Metaphysics, Ringdown, ripples 2 
Entry  Fri Sep 7 00:08:10 2012, janosch, Metaphysics, , baffle clipping loss 
    Reply  Thu Oct 4 18:48:04 2012, janosch, Configuration, PSL, AOM installation 
Entry  Thu Oct 11 11:20:05 2012, janosch, Update, General, beam shape simulation, PRC 
Entry  Thu Oct 11 21:26:40 2012, janosch, Update, General, PRC phase maps 7x
    Reply  Wed Oct 24 22:48:46 2012, janosch, Update, Computer Scripts / Programs, Phase map summary of LaserOptik mirrors 
Entry  Thu Oct 25 22:52:07 2012, janosch, Update, General, tip-tilt phase maps 6x
    Reply  Thu Oct 25 23:14:42 2012, janosch, Update, General, tip-tilt phase maps 
    Reply  Mon Oct 29 14:57:41 2012, janosch, Update, General, tip-tilt phase maps 
    Reply  Tue Nov 20 16:03:37 2012, janosch, Update, PEM, Seismometers and a microphone 
Entry  Thu Aug 30 17:03:32 2012, janosch, Manasa, Steve, Update, , ETMX 
Entry  Thu Sep 6 17:11:40 2012, janosch, Manasa, Steve, Update, , pick-off and baffle at ETMY 
Entry  Thu Aug 30 12:01:27 2012, janosch, Manasa,Steve, Update, , ETMX 
Entry  Fri Aug 31 10:16:02 2012, janosch, Steve, Update, , ETMX, scattering preps IMG_1609.JPGIMG_1608b.jpg
Entry  Wed Dec 3 12:49:11 2008, jenne, Update, Computers, something sketchy with NDS ... or something 
    Reply  Wed Aug 12 10:35:17 2009, jenne, Summary, Computers, Nodus rebooted / SVN down 
    Reply  Thu Oct 8 14:41:46 2009, jenne, Update, Computers, c1susvme1 is back online 
    Reply  Mon Oct 19 17:12:54 2009, jenne, Update, PEM, accelerometers and seismomters are all good. SeismometersGoodSpectra_19Oct2009.png
    Reply  Mon Dec 21 10:09:06 2009, jenne, Update, ASS, OAF Model update and build instructions 
    Reply  Fri Mar 19 18:00:14 2010, jenne, Update, PEM, Guralp2 centered again 
Entry  Mon Jun 4 23:48:43 2012, jenne, Update, Green Locking, lowered gain 
    Reply  Wed Dec 17 19:04:12 2014, jenne, Update, ASC, ASS retuned 
Entry  Tue Oct 2 15:14:54 2012, jenne, jamie, Update, IOO, PZT diagnosis 
ELOG V3.1.3-