40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 240 of 344  Not logged in ELOG logo
Entry  Tue Aug 25 11:02:39 2009, rana, Summary, PSL, Temperature Box D980400-B.pdf
Entry  Sat Jun 12 18:03:00 2010, sharmila, Update, elog, Temperature Controller 
Entry  Tue Feb 8 13:26:11 2011, Aidan, Summary, Green Locking, Temperature dependence of phase change of green on reflection 
Entry  Thu May 5 13:12:06 2011, Jenne, Update, PSL, Temperature drift, trying to shield PMC with foil PSL_Temp_drift_5May2011.pngP5050092small.jpg
Entry  Thu Jul 21 05:22:26 2016, Aakash, Update, General, Temperature measurements across the enclosure | SURF 2016 script21jul2016.mfig1.pdffig2.pdffig3.pdf
    Reply  Thu Jul 21 21:38:44 2016, Aakash, Update, General, Temperature measurements across the enclosure | SURF 2016 
    Reply  Fri Jul 22 05:20:26 2016, Aakash, Update, General, Temperature measurements across the enclosure | SURF 2016 coherence.pdftransferfunc.pdftransferfuncdB.pdfscript22jul2016.m
Entry  Wed May 16 14:06:49 2012, steve, Update, SUS, Temperature rules temprules.png
Entry  Mon Apr 26 11:14:04 2010, Koji, Update, Green Locking, Temperature scan for PPKTP SHG_pow.png
Entry  Fri Jun 18 14:53:37 2021, Anchal, Summary, PEM, Temperature sensor network proposal 40mTempSensors.pdf
Entry  Thu Sep 16 12:06:17 2021, Tega, Update, Computer Scripts / Programs, Temperature sensors added to the summary pages TempPlot_2021-09-16_12.04.19PM.png
Entry  Thu Mar 12 16:13:16 2020, gautam, Update, PSL, Temperature sensors connected to Acromag P_20200317_153736_vHDR_On_2.jpg
Entry  Sun Aug 14 04:12:37 2011, Jenny, Update, PSL, Temperature steps and slow actuator railing Picture_6.pngPicture_7.png
    Reply  Sun Aug 14 15:37:39 2011, Jenny, Update, PSL, Temperature steps and slow actuator railing 
    Reply  Mon Apr 12 20:48:51 2010, Aidan, Mott, Summary, Green Locking, Temperature sweep of the Innolight: df/dT ~ 3.3GHz/K Innolight_temp_sweep.pdfInnolight_Temp.m
    Reply  Tue Apr 13 12:39:51 2010, Aidan, Mott, Summary, Green Locking, Temperature sweep of the Innolight: df/dT ~ 3.3GHz/K 
Entry  Mon Apr 12 19:50:30 2010, Aidan, Summary, Green Locking, Temperature sweep of the Lightwave: df/dT = 2.8GHz/K LightWave_temp_sweep.pdfLightWave_Temp.m
Entry  Fri Feb 4 13:45:25 2011, josephb, Update, Computers, Temporarily removed cronjob for rsync.backup 
    Reply  Fri Feb 4 18:58:19 2011, rana, Update, Computers, Temporarily removed cronjob for rsync.backup 
    Reply  Mon Feb 7 10:37:28 2011, josephb, Update, Computers, Temporarily removed cronjob for rsync.backup 
Entry  Tue Aug 31 16:42:26 2010, josephb, Update, CDS, Temporarily reverting to CDS revision 2005 
Entry  Wed Feb 21 00:04:27 2018, gautam, Update, Electronics, Temporary RF power monitor setup RFbeatAmp.pngBeatMouthX_RFAM_20180221.pdf
Entry  Wed Nov 3 15:13:55 2010, josephb, Update, CDS, Temporary RFM slow read work around 
Entry  Tue Nov 2 00:17:01 2010, Suresh, Configuration, Locking, Temporary changes to the Video Mux 
Entry  Thu Jul 1 14:03:40 2010, josephb, Update, PEM, Temporary disconnect of some PEM channels for ~20 minutes 
    Reply  Tue Jun 16 13:35:03 2020, Jon, Update, VAC, Temporary vac fix / IFO usable again Pumpdown.png
Entry  Tue Jan 11 10:58:58 2022, Tega, Update, SUS, Temporary watchdog 
    Reply  Tue Jan 11 13:43:14 2022, Koji, Update, SUS, Temporary watchdog 
    Reply  Wed Jan 19 21:39:22 2022, Tega, Update, SUS, Temporary watchdog 
    Reply  Thu Jan 20 00:26:50 2022, Koji, Update, SUS, Temporary watchdog 
    Reply  Thu Jan 20 17:21:21 2022, Tega, Update, SUS, Temporary watchdog 
Entry  Tue Jun 29 20:47:19 2010, Jenne, Update, PEM, Terminator put on Guralp Box 
Entry  Wed Nov 11 00:55:47 2009, Jenne, Update, Adaptive Filtering, Terms put on some ADC inputs 
Entry  Mon Jan 12 18:11:25 2015, ericq, Update, ASC, Test Mass -> Transmon QPD TFs measured Jan12_singleArmSensing.pdfJan12_singleArmSensing.xml.zip
Entry  Tue Nov 10 17:49:20 2009, Alberto, Metaphysics, Computers, Test Point Number Mapping 
    Reply  Tue Nov 10 21:46:31 2009, rana, Summary, Computers, Test Point Number Mapping 
Entry  Tue Aug 29 01:52:22 2017, gautam, Update, SUS, Test mass actuator calibration ALS_comparison.pdf
    Reply  Wed Aug 26 16:12:25 2020, gautam, Update, Electronics, Test mass coil current requirements coilCurrents.png
Entry  Mon Jul 22 13:32:55 2019, Kruthi, Update, SUS, Test mass pitch adjustment test 6x
Entry  Fri Nov 12 10:49:34 2010, josephb, valera, Update, CDS, Test of ADC noise ADC_noise.pdf
    Reply  Fri Nov 12 19:24:56 2010, Koji, Update, CDS, Test of ADC noise 
    Reply  Sun Nov 14 11:56:59 2010, valera, Update, CDS, Test of ADC noise 
Entry  Wed Dec 24 12:46:54 2008, Yoichi, Update, Computers, Test points are back 
    Reply  Wed Jul 3 14:33:46 2013, Koji, Summary, LSC, Test result for the REFL165 photodetector REFL165_response_130702.pdf
Entry  Wed Jul 16 01:46:41 2014, Nichin, Update, Electronics, Test run of PDFR system PDFR_testRun_15-07-2014.pdf
    Reply  Wed Jul 16 02:22:10 2014, Koji, Update, Electronics, Test run of PDFR system 
Entry  Mon Jan 17 15:31:50 2011, josephb, Update, Cameras, Test the Basler acA640-100gm camera PylonViewer.jpg
Entry  Tue Jan 4 18:26:59 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
    Reply  Wed Jan 5 17:46:04 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
    Reply  Mon Jan 10 18:20:45 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
ELOG V3.1.3-