40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 240 of 341  Not logged in ELOG logo
    Reply  Fri Apr 1 22:22:29 2022, Koji, Update, Optical Levers, Simplified sketch on MC table 
    Reply  Mon Apr 4 15:49:06 2022, Tega, Update, Optical Levers, Simplified sketch on BS table BS_Table.drawio.pdf
Entry  Wed Feb 6 20:19:52 2013, Manasa, Update, Optics, G&H and LaserOptik mirrors 
    Reply  Thu Feb 7 14:10:25 2013, Manasa, Update, Optics, LaserOptik - AR Reflectivity - Bad data SN6_R.pngSN6_R.png
    Reply  Fri Feb 8 21:14:52 2013, Manasa, Update, Optics, G&H - AR Reflectivity  pr2.png27_1044419003.bmp
    Reply  Fri Feb 8 22:49:31 2013, Koji, Update, Optics, G&H - AR Reflectivity  
    Reply  Fri Feb 8 23:04:40 2013, Manasa, Update, Optics, G&H - AR Reflectivity  
    Reply  Sat Feb 9 19:34:34 2013, rana, Update, Optics, G&H - AR Reflectivity  
Entry  Mon Feb 11 17:54:02 2013, Koji, Summary, Optics, Curvature radii of the G&H/LaserOptik mirrors TT_Mirrors_RoC.pdf
    Reply  Mon Feb 11 19:55:47 2013, Manasa, Update, Optics, G&H - AR Reflectivity  
    Reply  Tue Feb 12 18:28:46 2013, Jamie, Summary, Optics, Curvature radii of the G&H/LaserOptik mirrors 
    Reply  Wed Feb 13 09:28:56 2013, Steve, Update, Optics, G&H - HR plots 
Entry  Wed Mar 20 14:44:47 2013, Jamie, Update, Optics, updated calculations of PRC/SRC g-factors and ARM mode matching 
    Reply  Mon Mar 25 16:51:59 2013, Jenne, Update, Optics, updated calculations of PRC/SRC g-factors and ARM mode matching 
    Reply  Tue Mar 26 11:33:55 2013, Jamie, Update, Optics, HOWTO calculate effective RoC of flipped TT mirror.mtransmission.mTTflipped.mM2Reff.m
Entry  Wed Nov 22 17:52:25 2017, gautam, Update, Optimal Control, Visualizing cost functions globalCosts.pdf
    Reply  Tue Jan 2 16:37:26 2018, gautam, Update, Optimal Control, Oplev loop tuning loopOpt_180102_1706.pdfglobalCosts.pdf
    Reply  Wed Jan 3 12:33:16 2018, rana, Update, Optimal Control, Oplev loop tuning 
    Reply  Wed Jan 3 16:25:32 2018, awade, Update, Optimal Control, Oplev loop tuning 
    Reply  Tue Jan 9 21:57:29 2018, gautam, Update, Optimal Control, Oplev loop tuning loopOpt_180108_2232.pdf
Entry  Fri Oct 26 09:10:17 2007, steve, Routine, PEM, PEM &PSL trend counts&psl.jpg5dcounts.jpg
Entry  Thu Nov 8 11:40:21 2007, steve, Update, PEM, particle counts are up pslhepaon.jpg
Entry  Mon Nov 19 14:19:25 2007, steve, Omnistructure, PEM, jackhammer jackhammer.jpgjackhammer2.jpg
Entry  Fri Nov 30 20:17:26 2007, Andrey, Configuration, PEM, Accelerometers and alum.plates for them Scheme_Aluminum_Piece-inches.pdf
Entry  Fri Nov 30 21:27:24 2007, rana, DAQ, PEM, weather / stacis / c1pem1 
Entry  Mon Dec 3 19:44:58 2007, Accelerometers on new mounts, Configuration, PEM, Andrey DSC_0194.JPGDSC_0195.JPGDSC_0196.JPG
Entry  Wed Dec 5 23:19:03 2007, Andrey, Configuration, PEM, Accelerometers are turned on 7x
Entry  Wed Dec 12 22:24:48 2007, tobin, Frogs, PEM, weather station 
Entry  Wed Dec 19 11:31:01 2007, steve, Omnistructure, PEM, aircond filter maintenance acfilters6m.jpg
Entry  Wed Dec 19 20:28:27 2007, Andrey, DAQ, PEM, Names for all 6 accelerometers have been changed 
Entry  Wed Jan 23 11:41:06 2008, steve, Update, PEM, sulfur smell in 40m 
Entry  Thu Jan 24 11:52:56 2008, steve, Update, PEM, the mud is cleaned up & MOPA shutter is opened 
Entry  Fri Jan 25 09:22:21 2008, steve, Update, PEM, burned toast award goes to 
Entry  Mon Jan 28 19:35:55 2008, rana, Summary, PEM, Accelerometer and Seismometer Coherences Acc.pdf
Entry  Sun Feb 3 05:02:41 2008, rana, Update, PEM, Seism 4 day Screenshot.png
Entry  Tue Feb 5 17:39:05 2008, jweiner, Configuration, PEM, PEM-AS_MIC taken down from AS table, will put in PSL enclosure soon 
Entry  Wed Feb 6 09:17:31 2008, steve, Update, PEM, IST building construction continoues seismic8d.jpgseisioo.jpg
Entry  Fri Feb 8 17:55:53 2008, josh, Configuration, PEM, PEM-AS_MIC now in PSL enclosure 
Entry  Mon Feb 11 14:24:19 2008, steve, Update, PEM, more earthquakes eqfeb11.jpg
Entry  Tue Feb 19 18:28:41 2008, John, Update, PEM, More seismic in Baja California 
Entry  Fri Feb 22 02:51:20 2008, Andrey, Update, PEM, Accelerometer ITMX seems to be broken Accelerom-EYMX-Feb22.jpgAccelerom-ITMX-Feb22.jpg
Entry  Fri Feb 22 15:16:33 2008, Andrey, Update, PEM, ITMX Accelerometer is NOT broken Accelerom-ITMX-Feb23.jpgAccelerom-ETMX-Feb23.jpg
Entry  Fri Mar 7 00:47:54 2008, rana, Configuration, PEM, Ranger SS-1 ss1.pdf
Entry  Tue Mar 11 23:14:01 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements Acc.pdf
    Reply  Wed Mar 12 00:36:52 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements finished.pdf
    Reply  Wed Mar 12 00:40:35 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements mc2048-128.pdf
    Reply  Wed Mar 12 00:47:26 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements Screenshot.png
    Reply  Mon Mar 17 18:30:48 2008, mevans, Configuration, PEM, Adaptive Filtering mcacc_adaptive.png
Entry  Fri Mar 21 23:15:11 2008, rana, Configuration, PEM, Ranger SS-1: New Setup 
Entry  Tue Apr 8 09:08:54 2008, steve, Configuration, PEM, weather station disconnected toast.jpg
ELOG V3.1.3-