40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 238 of 344  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  8438   Thu Apr 11 02:00:21 2013 JenneUpdateLockingTRY gone???TRY
signals are all gone!  Both
the PD and the camera show no signal. 
  
  10401   Fri Aug 15 14:09:21 2014 JenneUpdateLSCTRY mystery offset goneAgain unknown, but about 6 hours ago (so
~8am) the offset disappeared. 
Here's a 1-day trend:
 TRY_0pt3_offset_gone.pdf 
  10402   Fri Aug 15 14:35:57 2014 ericqUpdateLSCTRY mystery offset goneOne question answered, but another raised.
The offset came from LSC-TRY switching to
the ETMY-QPD signal from ETMY-TRY (Hi gain
 TRYmystery.png 
  5654   Wed Oct 12 00:35:42 2011 kiwamuUpdateLSCTRY path realignedThe
TRY (TRansmitted light from Y arm ) path
was a bit realigned because there had been
  
  4656   Sat May 7 02:52:53 2011 kiwamuUpdateLSCTRY photo diode installed[Suresh / Kiwamu]
 We
installed the TRY photo diode (Thorlabs one)
  
  8568   Tue May 14 01:13:35 2013 JenneUpdate40m UpgradingTRY realignedKoji noticed that earlier this afternoon
the Yarm ASS was working, but then after
dinner it was no longer working.  I
  
  7443   Wed Sep 26 17:09:15 2012 DenUpdateSUSTT  [Koji, Steve, Den]
TT alignment is fine, yaw damping
is satisfactory, pitch damping is slow. We
  
  7876   Fri Jan 4 15:11:28 2013 JenneUpdate TT[Jenne, Koji]
D - UL
B - UR
  
  7898   Mon Jan 14 15:15:04 2013 JenneUpdate TT 
[Manasa, Jenne]
First plug in only one of the quadrupus
 TT2_stuck_unstuck_14Jan2013.png 
  7899   Mon Jan 14 19:56:48 2013 ManasaUpdate TT 
 [Manasa, Jenne]
The motion of the magnets (~1.5mm
  
  7900   Tue Jan 15 01:41:40 2013 ranaUpdateSUSTT That seems like easily enough range;
as long as we can put the TT into the middle
of their range to start with we should be
  
  7535   Fri Oct 12 10:39:45 2012 SteveUpdateSUSTT PITCH damping

    

       
            
 IMG_1709.JPG 
  7536   Fri Oct 12 14:01:33 2012 KojiUpdateSUSTT PITCH damping

    

       
            
  
  7538   Fri Oct 12 16:59:26 2012 steveUpdateSUSTT PITCH damping

    

       
            
  
  5223   Sat Aug 13 15:47:47 2011 NicoleSummarySUSTT Optimization CurvesUsing my Matlab model of the flexibly-supported
eddy current damping system, I have changed
parameters to see if/how the TTs can be optimized
 magstrength1.jpgdampermass.jpgresfreq.jpg 
  5224   Sat Aug 13 19:08:01 2011 KojiSummarySUSTT Optimization CurvesWhat are the parameters you are using?
As you have the drawings of the components,
you can calculate the masses of the objects.
  
  5225   Sat Aug 13 21:15:47 2011 NicoleSummarySUSTT Optimization Curves


   
        
            
  
  5226   Sat Aug 13 21:48:17 2011 KojiSummarySUSTT Optimization Curves1) Drawing has the dimensions => You
can calculate the volume => You can calculate
the mass
  
  5227   Sun Aug 14 00:26:51 2011 NicoleSummarySUSTT Optimization Curves

    
        
  
  5229   Sun Aug 14 13:57:52 2011 NicoleSummarySUSTT Optimization Curves

    

       
            
 FLEX_exp_mod_comp.jpg 
  5222   Sat Aug 13 15:40:38 2011 NicoleSummarySUSTT Shaking Today and Hopefully More?As reported in my  previous
entry of TT supsension bode plots, I
found that my experimental data had what
 emnoise_and_flex.jpg 
  5231   Sun Aug 14 17:47:39 2011 NicoleSummarySUSTT Shaking Today and Hopefully More?

    

       
            
 noisetest.jpg 
  7831   Fri Dec 14 09:05:04 2012 steveUpdatePEMTT after eq 6.1 
 SRM, ITMY and MC3 moved some
what, but how are the TT? It may worth looking
 eq6.1.png 
  7428   Fri Sep 21 22:43:51 2012 DenUpdateSUSTT alignmentI did TT alignment using red laser and
QPD.
 6x 
  7821   Thu Dec 13 04:29:34 2012 DenUpdateSUSTT angle of incidenceI think the angle of incidence on TT inside
BSC will be too large because of eddy current
damping brackets. I've measured max possible
  
  7826   Fri Dec 14 01:42:53 2012 DenUpdateSUSTT angle of incidenceI've estimated max possible angle of incidence
on TT if we allow 20mm tolerance for the
beam size and 5 mm tolerance for spot location
 DSC_4791.jpeg 
  7827   Fri Dec 14 02:52:32 2012 KojiUpdateSUSTT angle of incidenceAt least, we don't want to use Al-coated
mirrors. We should use multilayer dielectric
mirrors.
  
  7828   Fri Dec 14 03:15:49 2012 JenneUpdateSUSTT angle of incidenceBut have you looked yet at what angle we
need? The first input string mirror has a
quite small incidence angle. The other input
  
  7850   Tue Dec 18 15:32:29 2012 JenneUpdateSUSTT angle of incidence


   
        
            
  
  7775   Sun Dec 2 00:37:49 2012 DenUpdateSUSTT cable problem This week I've got all TT stuff baked
and today was testing eddy current damping
and electronics.
 6x 
  14899   Thu Sep 19 11:26:18 2019 gautamUpdateIOOTT cables DON'T need to be remadeFalse
alarm - the mistake
was mine. Looking at the schematic
  
  14897   Wed Sep 18 15:27:45 2019 gautamUpdateIOOTT cables need to be remadeSummary:

The custom ribbon cables piping
the coil driver board outputs to the eLIGO
 IMG_7945.JPG 
  14898   Thu Sep 19 09:39:30 2019 gautamUpdateIOOTT cables need to be remadeWhile debugging this problem, c1lsc models
crashed. I ran the reboot script this morning
to bring the models back. There was a 0x4000
 CDSoverview.png 
  14469   Fri Feb 22 12:19:46 2019 gautamUpdateIOOTT coil driver VmonTo debug the issue of the suspected drifting
TTs further, I temporarily hijacked CH0-CH8
of ADC1 in the c1lsc expansion chassis, and
  
  7446   Thu Sep 27 15:21:04 2012 SteveUpdateSUSTT height adaptor & PTICH damping

    

       
            
 09271201.PDFIMG_1656.JPGIMG_1654.JPG 
  7869   Fri Dec 21 16:50:30 2012 RanaUpdateSUSTT in vac DB25 pin swapping[Koji, Rana, Nic, Steve] 
  
  7871   Wed Jan 2 06:52:50 2013 KojiUpdateSUSTT in vac DB25 pin swapping[Koji, Rana, Nic, Steve]

I recalled that we used an optical
  
  7888   Thu Jan 10 12:22:36 2013 JenneUpdateAlignmentTT matrix is funny


   
        
            
  
  7528   Thu Oct 11 11:36:52 2012 SteveUpdateSUSTT pitch adjustmentTip Tilt pitch adjustment on existing-in
vacuum suspension. This can be added by a
simple installation of a 1.25" long
 IMG_1702.JPG 
  14753   Thu Jul 11 17:58:38 2019 gautamUpdateEquipment loanTT suspension --> DownsArnaud has taken 1 TT suspension from the
40m clean lab to Downs for modal testing.
Estimated time of return is tomorrow evening.
  
  7861   Thu Dec 20 10:11:12 2012 ManasaUpdateIOOTT1 connections[Jamie,Manasa]
We've been trying to figure out the
connector for the TTs. Since, we found the
  
  7862   Thu Dec 20 10:35:27 2012 SteveUpdateIOOTT1 connections

    

       
            
  
  8336   Mon Mar 25 15:01:33 2013 ManasaUpdateLockingTT1 drift

    

       
            
  
  8337   Mon Mar 25 15:24:41 2013 ranaUpdateLockingTT1 drift 
 I doubt that it has truly disappeared.
Can you please make a measurement of it and
  
  14362   Sat Dec 15 20:04:03 2018 gautamUpdateIOOTT1/TT2 steppingI'm running a script that moves TT1
and TT2 randomly in some restricted P/Y space
to try and find an alignment that gets some
  
  14368   Wed Dec 19 15:15:56 2018 gautamUpdateIOOTT1/TT2 steppingI removed the ND filter from the ETMYT
camera to facilitate searching for a TRY
beam. This should be replaced before we go
  
  7893   Fri Jan 11 17:32:10 2013 ManasaUpdateAlignmentTT2 connections 
 Manasa, Jenne
We started off to try and get TT2
  
  7894   Fri Jan 11 19:12:20 2013 KojiUpdateAlignmentTT2 connectionsWas the connection   
  7896   Mon Jan 14 10:12:09 2013 JenneUpdateAlignmentTT2 connections


   
        
            
  
  7897   Mon Jan 14 12:08:39 2013 jamieUpdateAlignmentTT2 connections

    

       
            
  
ELOG V3.1.3-