40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 235 of 355  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  16851   Fri May 13 14:26:00 2022 JCUpdateAlignmentLO2 Beam[Yehonathan, JC]

Yehonathan and I attempted to align
the LO2 beam today through the BS chamber
  
  16567   Mon Jan 10 18:36:41 2022 AnchalSummaryBHDLO1 free swinging test set to triggerLO1 is set to go through a free swinging
test at 1 am tonight. We have used this script
(scripts/SUS/InMatCalc/freeSwing.py) reliably
  
  17487   Wed Mar 1 19:18:18 2023 PacoUpdateSUSLO1 dewhitening[Paco, Anchal]

Today we invested some time in
the DW filters for LO1 supension. We discovered
 uncalibrated_lo_phase_errctrl.png 
  17488   Thu Mar 2 10:54:25 2023 PacoUpdateSUSLO1 dewhiteningWe added the DB9 short connectors to all
coil drivers in the BHD suspensions and updated
FM9-FM10 for LO1, LO2, AS1, AS4, SR2, PR2
 uncalibrated_lo_phase_errctrl_ADW.png 
  16562   Mon Jan 10 14:52:51 2022 AnchalSummaryBHDLO1 OSEMs roughly calibrated and noise measuredI used the open light level output of 908
for ITMX side OSEM from 40m/16549
to roughly calibrate cts2um filter module
 LO1_vs_ETMX_OSEM_Spectrum_LF_x30_Gain.pdfLO1_vs_ETMX_OSEM_Spectrum_HF_x30_Gain.pdf 
  17133   Tue Sep 6 17:39:40 2022 PacoUpdateSUSLO1 LO2 AS1 AS4 damping loop step responsesI tuned the local damping gains for LO1,
LO2, AS1, and AS4 by looking at step responses
in the DOF basis (i.e. POS, PIT, YAW, and
 LO1_Step_Response_Test_2022-09-06_17-19.pdfLO2_Step_Response_Test_2022-09-06_17-30.pdfAS1_Step_Response_Test_2022-09-06_17-53.pdfAS4_Step_Response_Test_2022-09-06_18-16.pdf 
  16919   Wed Jun 15 15:45:37 2022 yutaUpdateSUSLO1 LLCOIL now working, it was loose connectionWe tracked the issue of LO1 LLCOIL not
actuating LO1, and found that the DB9 cable
from the coil driver to the sat amp was loose.
 Measurement.JPGBAD.JPGScreenshot_2022-06-15_15-59-05.png 
  16572   Tue Jan 11 12:19:12 2022 AnchalSummaryBHDLO1 Input Matrix Diagonalization performed.The frree swinging test was successful.
I ran the input matrix diagonalization code
(scripts/SUS/InMAtCalc/sus_diagonalization.py)
 LO1_SUS_InpMat_Diagnolization.pdfLO1_FreeSwingData_PeakFitting.pdf 
  17565   Wed Apr 26 11:27:49 2023 PacoSummaryBHDLO/MI(DARM) signal strength comparison between the configurations with finesseI'm
checking Koji + Yuta's not-so-naive calculations
using finesse. 
  
  17560   Mon Apr 24 19:11:20 2023 KojiSummaryBHDLO/MI(DARM) signal strength comparison between the configurationsYuta and I had a discussion last week about
the signal strength between the configurations.
Here are some naive calculations.
  
  17167   Fri Sep 30 20:18:55 2022 PacoUpdateBHDLO phase noise with different actuation points[Paco, Koji]

We took lo phase noise spectra
actuating on the for different optics-- LO1,
 BHDC_asd_actuation_point.png 
  17511   Tue Mar 14 18:44:39 2023 yutaUpdateBHDLO phase noise measurements in ITMX single bounce, MICH and FPMI[Anchal, Yuta]

We have measured LO phase noise in
 BH555_BH44_LO_PHase_Control_Comparison.pdf 
  17547   Tue Apr 18 19:29:43 2023 yutaUpdateBHDLO phase noise measurements in ITMX single bounce, MICH and FPMI[Anchal, Yuta]

We have repeated LO phase noise measurement
 Screenshot_2023-04-18_19-48-11.pngBH555_BH44_LO_Phase_Control_Noise_Budgets.pdfBH55_BH44_LO_Phase_Control_Noise_Budgets.zipBH44_LO_Phase_Noise.pdf 
  17514   Mon Mar 20 20:27:30 2023 yutaUpdateBHDLO phase noise contribution in MICH BHD[Paco, Yuta]

MICH was locked with balanced homodyne
readout with LO phase locked using BH55_Q
 MICH_Sensitivity_20230320.pdfMICH_Sensitivity_20230320_BH55Contribution.pdfMICH_Sensitivity_20230320_BH44Contribution.pdf 
  17520   Thu Mar 23 17:47:53 2023 PacoUpdateNoiseBudgetLO phase noise budget (BH55_Q)I drafted a calibrated LO Phase noise budget
using diaggui whose template is saved under
/opt/rtcds/caltech/c1/Git/40m/measurements/BHD/LO_PHASE_cal_nb.xml
 lophase_cal_nb_20230322.pngPXL_20230323_202125206.jpgPXL_20230323_194150923.jpg 
  17171   Mon Oct 3 15:19:05 2022 PacoUpdateBHDLO phase noise and control after violin mode filters[Anchal, Paco]

We started the day by taking a
spectrum of C1:HPC-LO_PHASE_IN1,
 filters_c1sus_lo1_lsc.pngBHDC_asd_act.pngboosted_lo_phase_control.png 
  17204   Fri Oct 21 16:15:10 2022 yutaSummaryBHDLO phase locking with BH55 audio dither trials[Paco, Yuta]

We are still struggling with locking
LO phase in MICH or ITM single bounce with
 Screenshot_2022-10-21_15-33-18_LO_OLTF_LO1_BH55_Q.pngScreenshot_2022-10-21_15-42-50_LO_OLTF_LO1_BHDCDIFF.pngScreenshot_2022-10-21_15-44-53_MICH_OLTF.pngScreenshot_2022-10-21_15-50-43_LO_OLTF_LO1_BH55_Q_MICH.pngScreenshot_2022-10-21_16-11-16.png 
  17212   Tue Oct 25 17:27:11 2022 PacoSummaryBHDLO phase control with RF + audio sidebands[Yuta, Paco]

Today
we locked LO phase with BH55 + Audio dithering
 Screenshot_2022-10-25_17-36-45_LOPHASELOCKED.pngScreenshot_2022-10-25_17-33-33_LOPHASELOCKING_MICHBHD_ELP80_280HzDither.png 
  17216   Wed Oct 26 16:04:12 2022 PacoSummaryBHDLO phase control with RF + audio sidebands[Yuta, Paco]

Today
we again locked the LO phase with BH55 +
  
  17343   Tue Dec 6 17:12:23 2022 yehonathanSummaryBHDLO phase control using audio (MICH and AS1) + RF{Yuta, Yehonathan}

Today we lock LO phase using audio+RF
method in two variants: AS1+RF and MICH(BS)+RF.
 Screenshot_2022-12-06_16-44-37_LOPHASE_OLTF_BH55_Q_AS1dither.pngScreenshot_2022-12-06_17-10-47_LOPHASE_OLTF_BH55_Q_BSdither.png 
  17491   Fri Mar 3 18:47:13 2023 PacoSummaryBHDLO phase POS noise coupling - II tried some LO PHASE noise coupling measurements
today. With MICH locked using AS55_Q, I control
the LO phase using the single RF (BH55_Q)
 lophasenoise_bh55Qcontrol.pngbhnoisecoupling_excscreenshot.pngbh55q_noisecoupling.pngbh44q_noisecoupling.png 
  17142   Thu Sep 15 21:12:53 2022 PacoUpdateBHDLO phase "dc" controlLocked the LO phase with a MICH offset=+91.
The LO is midfringe (locked using the A-B
zero crossing), so it's far from being
 lophase_oltf.pdflophase_noise_spectra.pdf 
  11825   Mon Nov 30 14:12:14 2015 ericqUpdateLSCLO level check for the LSC RF distribution boxI checked the RF levels at the LSC LO distribution
box, with the agilent scope and a handful
of couplers. This was all done with the Marconi
  
  11826   Mon Nov 30 15:17:57 2015 KojiUpdateLSCLO level check for the LSC RF distribution boxT1000461
tells us that the nominal LO input is 2dBm
although we don't know what's the
  
  11802   Mon Nov 23 22:12:10 2015 KojiUpdateIOOLO level check for the IMC demod boardIn order to check the proper LO level,
the IMC demod board was checked. As
a short summary, -8dBm is the proper input
 IMG_2137.JPGIMG_2138.JPG 
  11807   Wed Nov 25 04:24:21 2015 ranaUpdateIOOLO level check for the IMC demod boardHmmm. Very non-standard demod. From the
photo, looks like someone did some surgery
with the attenuators (AT1, AT2, AT3) in the
  
  11808   Wed Nov 25 10:07:10 2015 KojiUpdateIOOLO level check for the IMC demod boardI didn't finish making the DCC entry
for this module yet.

But the attenuators are
  
  11811   Wed Nov 25 16:46:10 2015 KojiUpdateIOOLO level check for the IMC demod boardAwwww. I found that the demod board has
the power splitter (PSCJ-2-1) with one output
unterminated.
 D990511-40m_151123.pdf 
  11812   Wed Nov 25 20:07:35 2015 ranaUpdateIOOLO level check for the IMC demod boardPerhaps we can replace T1 with a mini-circuits
hybrid 0-90 deg splitter and then remove
the trim caps. (JSPQ-80, JYPQ-30, SCPQ-50)
  
  6119   Wed Dec 14 14:30:43 2011 JenneUpdateRF SystemLO for new demod boxThe Rich demod box wants 10dBm for the
local oscillator inputs, so I measured the
values that we have coming out of the distribution
  
  6121   Wed Dec 14 16:19:46 2011 ZachUpdateRF SystemLO for new demod boxI'm not sure I agree with your conversions,
BUT:
The IQ boards use a PE4140, fancy
  
  6122   Wed Dec 14 18:06:39 2011 ZachUpdateRF SystemLO for new demod boxActually, the LO inputs to the IQ boards
have AP1053 (Cougar) amps on them. These
  
  6123   Wed Dec 14 19:59:12 2011 JenneUpdateRF SystemLO for new demod box


   
        
            
  
  15559   Sat Sep 5 14:28:03 2020 KojiUpdateGeneralLO beam: Fiber coupling work2PM: Arrived at the 40m. Started the work
for the coupling of the RF modulated LO beam
into a fiber. -> I left the lab
 20200905212254_IMG_9938.JPG 
  17046   Fri Jul 29 18:24:53 2022 TegaUpdateBHDLO beam power improved by factor of 6 after LO and AS beam alignment[Yuta, Tega]

From our previous work (elog 17044)
 LO_and_oldAS_settings.pngBHD_fringe_settings.pngScreenshot_2022-07-29_19-37-39.pngFromTheLeft-AS-POP-LO.JPG 
  17040   Wed Jul 27 18:30:50 2022 yutaUpdateBHDLO beam power at BHD DCPDs is significantly lower than expected[Paco, Yehonathan, Yuta]

We measured power and counts at
BHD DCPDs with LO beam only and ITM single
 LOBeamAtBHD.JPGITMXSingleBounceAtBHD.jpg 
  17042   Thu Jul 28 14:34:40 2022 YehonathanUpdateBHDLO beam power at BHD DCPDs is significantly lower than expected{Yuta, Yehonathan}

We went to the BS table to check
the POP beam power. We first notice that
  
  13646   Wed Feb 21 12:17:04 2018 gautamUpdateCDSLO Power mon channels added to c1lscTo make this setup more permanent, I modified
the c1lsc
  
  14020   Tue Jun 26 17:20:33 2018 JonConfigurationCamerasLLO Python Camera Software is WorkingThanks to a discussion yesterday with Joe
Betzweiser, I was able to identify and fix
the remaining problem with the LLO GigE camera
  
  1065   Tue Oct 21 18:19:42 2008 YoichiConfigurationComputersLISO and Eagle installedI installed LISO, a circuit simulation software,
into the control room linux machines.
I also installed a PCB CAD called Eagle to
 FSS_PC_Path.pdfAD829Stability.pngAD797Stability.pngFreqNoiseByAD829.png 
  9488   Wed Dec 18 13:34:03 2013 SteveUpdateGeneralLIGOX people40m crew and visitor Holger Muller from
Berkeley.
 40m2013Dec.jpg40mCup.jpg 
  8776   Thu Jun 27 22:52:38 2013 Rana, Gabriele, FrancescoSummaryComputer Scripts / ProgramsLIGO-DV installedI installed ligoDV in the /ligo/apps/ligoDV/
Now, by pointing the tool at the
local NDS2 server (megatron:31200) you can
 ldv.png 
  2130   Wed Oct 21 16:18:12 2009 SteveSummarySAFETYLIGO Safety Officers visited the 40m David Nolting, chief LIGO Safety Officer
and his lieutenants from LLO and LHO paid
homage to the 40m lab this morning.
  
  4263   Tue Feb 8 16:44:43 2011 JenneUpdateComputersLIGO Grid Cluster client upgraded on RossaI did a yum-install of the latest ldg-client
(to get onto the LIGO Clusters) on Rossa. 
I followed the instructions on the
  
  11899   Wed Dec 23 03:27:04 2015 ranaUpdateComputer Scripts / ProgramsLHO EPICS slow downhttps://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=24321

This LHO log indicates that EPICS
slow down could be due to NFS activity. Could
  
  12943   Thu Apr 13 21:01:20 2017 ranaConfigurationComputersLG UltraWide on Rossawe installed a new curved 34" doublewide
monitor on Rossa, but it seems like it has
a defective dead pixel region in it. Unless
 LG34c.jpgcrack.jpg 
  6247   Fri Feb 3 16:13:49 2012 steveUpdatePEMLED lights for chamber illuminationCold
LED lights replaced hot halogen ones.
Flat LED MYAL 6S,  model #112560002 
 P1080526.JPG 
  17292   Mon Nov 21 14:55:58 2022 JCConfigurationGeneralLED Instead of Incandescent Lights Electrical came by today to see the lights.
The issue may be the switches, but they will
come by tomorrow to solve the issue. A couple
  
  17323   Wed Nov 30 10:48:10 2022 JCConfigurationGeneralLED Instead of Incandescent Lights All incondescent lightsbulbs have been
switched over to LED.

  
  188   Wed Dec 12 16:22:22 2007 albertoOmnistructureElectronicsLC filter for the RF-AM monitor circuitIn the LC configuration (see attached schematic)
the resonant frequency is tuned to one of
the peak of our RF-AM monitor and it is amplified
 TF_LC_filter_10pF_1.8uH_scope_probe.pngTF_LC_filter_10pF_1.8mH_no_probe.pngLC_filter_schematic.png 
ELOG V3.1.3-