ID Date Author Typeup Category Subject Text Attachments
  10494   Thu Sep 11 02:08:32 2014 JenneUpdateLSCHigher transmission powersNo breakthroughs tonight. 
DRMI didn't want to lock with either
the recipe that we used a year ago (elog
 Zoom_TRXTRYat7_CARMsqrtInvTrans_DARMalsdiff.pngALSonly_TryingTransitionStraightToREFLDC.png 
  10495   Thu Sep 11 15:50:49 2014 SteveUpdateSUSETMX damping restored    
  10496   Thu Sep 11 17:12:42 2014 SteveUpdateSUSOpLev test: old SP qpd connectedIP POS cable was swapped with old SP-QPD
sn222 at the LSC rack.  So there is
NO IP POS temporarily.
  
  10497   Fri Sep 12 00:28:04 2014 ericqUpdateLSCHoly sensitivity, Batman!I took a quick measurement of the ALS stability,
using POX and POY as out of loop sensors,
using a CARM calibration line to line POX
 ALSoutOfLoop.pdf 
  10498   Fri Sep 12 00:40:23 2014 JenneUpdateLSCDRMI locking Tonight I worked on DRMI locking.
 
I think the reason the May2014 DRMI
  
  10499   Fri Sep 12 03:49:57 2014 ericqUpdateLSCSome more PRFPMI efforts Since DRMI didn't get fully commissioned,
I tried my hand at PRFPMI locking with the
newly improved ALS performance. 
  
  10500   Fri Sep 12 11:25:42 2014 KojiUpdateLSCDRMI lockingThis is great.
And I got confused. Is REFL11 going
through the CM board? 
  
  10501   Fri Sep 12 12:00:59 2014 ericqUpdateLSCDRMI lockingREFL11 I, as seen in digital land, is connected
to the slow output of the CM board. I tuned
the demod angle of the REFL11 demodulator
  
  10502   Fri Sep 12 14:11:17 2014 ericqUpdateLSCDRMI lockingWe
need to get an interferometric estimation
of the SRC length error / SRC sideband splitting,
 7x 
  10503   Fri Sep 12 15:10:09 2014 JenneUpdateASCMICH ASSDuring the Sim meeting today, I added parts
to the ASS model so that we can also dither
the BS and minimize the power at AS. 
  
  10504   Fri Sep 12 16:30:48 2014 SteveUpdateSUSHeNe laser test preparation

    

       
            
 ND2.pngqpd222ND21103P.jpg 
  10505   Mon Sep 15 14:37:49 2014 SteveUpdateGeneralOphir pmeter has no filter already

    

       
            
  
  10506   Mon Sep 15 15:52:44 2014 SteveUpdateSUSPRM damping restored The PRM side was kicked up   
  10507   Mon Sep 15 18:55:51 2014 ranaUpdateDAQ40m frames onto the cluster Dan Kozak is rsync transferring /frames
from NODUS over to the LDAS grid. He's doing
this without a BW limit, but even so its
  
  10508   Tue Sep 16 10:47:52 2014 SteveUpdatePSLLaser turned on Our janitor turned off the laser
accidentally. 
  
  10509   Tue Sep 16 14:26:45 2014 ericqUpdatePSLLaser turned on

    

       
            
  
  10510   Tue Sep 16 16:03:36 2014 KojiUpdatePSLLaser turned on

    

       
            
  
  10511   Tue Sep 16 17:02:41 2014 SteveUpdateComputer Scripts / ProgramsPSL output shutter is floating

    

       
            
  
  10512   Wed Sep 17 01:40:55 2014 JenneUpdateLSCCloser to REFL DC? Maybe?I tried a bunch of times to reduce my CARM
offset so I could jump to REFLDC digitally,
but I think I'm maybe being a little ambitious
 Zoom_TRXTRYupto25_1094967592.png 
  10513   Wed Sep 17 13:41:00 2014 JenneUpdateSUSNew calibrated channels for test QPDSteve asked about calibrating the QPD,
so I set up some new epics records so that
we can have calibrated versions of the QPD
 NewQPDcalibratedChans.png 
  10514   Wed Sep 17 15:40:00 2014 ericqUpdateLSCDRMI lockingI have not had any success the past two
days in getting an interferometric measurement
of the SRC length. 
 dcAngleDiff_srcL.pdfdrfpmiVertexSensing.zip 
  10516   Thu Sep 18 02:42:28 2014 JenneUpdateLSCAO path partly engagedTonight was a night of trying to engage
the AO path.  The idea was to sit at
arm powers of a few on sqrtInvTrans for CARM
 Zoom_TRXTRY4_EngagingAO_1095059162.png0020.pdf 
  10517   Thu Sep 18 09:17:47 2014 SteveUpdateSUSHeNe laser test TEST QPD sn 222 was calibrated with 1103P
directly looking into it from 1 m. ND2 filter
was on the qpd.
 calibrated_16hrs.pngQPD222cal.jpg1103P40s40min.png 
  10519   Thu Sep 18 17:44:55 2014 JenneUpdateLSCOld AO cable pulled[Q, Jenne]
We pulled the old 2-pin lemo cable
after I had a look at the connectors. 
  
  10520   Fri Sep 19 04:05:05 2014 ericqUpdateLSCAO path partly engagedMore AO efforts. No huge news. 
Came at AO from each side. For each
sign, I lost lock just a few dB from the
 TFSR785_19-09-2014_020555.pdfTFSR785_19-09-2014_033920.pdf 
  10521   Fri Sep 19 13:12:07 2014 JenneUpdateLSCAO path glitches

    

       
            
  
  10522   Mon Sep 22 10:14:07 2014 SteveUpdateSUSHeNe laser test

    

       
            
 1103Pmon3d.png 
  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures 
 
 summerheat.png 
  10524   Mon Sep 22 15:20:32 2014 SteveUpdateVACRGA scan at day 229 
 
 RGA@229day.pngRGAscan229d.png 
  10525   Tue Sep 23 08:34:14 2014 SteveUpdateSUSHeNe laser test  
 The room temp drops 1 degree
C on the 4th day. The weather has changed.
 tempDrop.png 
  10526   Tue Sep 23 09:37:12 2014 SteveUpdateSUSIOO and temp changes   IOO.png 
  10527   Tue Sep 23 17:37:10 2014 ericqUpdateLSCDRMI lockingRather than using a CAD drawing, I used
Gabriele's code from ELOG
 9590 to try and judge if we could
 SRCcorrection.pdf 
  10528   Tue Sep 23 17:56:13 2014 Jenne, EricQUpdateGeneralVent prep for SRC length changeAs Q mentioned in elog
10527, (prompted by Koji's email this
afternoon) we are prepping the IFO for vent.
  
  10529   Wed Sep 24 08:39:32 2014 Jenne, EricQUpdateGeneralVent prep for SRC length change

    

       
            
  
  10530   Wed Sep 24 08:40:29 2014 SteveUpdateVACVent has started 
 Jam nuts checked. Oplev servos
turned off. Particle count checked. Vertex
 vent77.pngbvent77.png 
  10531   Wed Sep 24 11:02:38 2014 manasaUpdateLSCMoving SRMI looked at the CAD layout and it seems
like we will clearly
  
  10532   Wed Sep 24 13:28:48 2014 SteveUpdateVACvent is completed The vent is completed. ITMX was kicked
up accidentally. Valve configuration: chamber
open, RGA is pumped through VM2  Maglev
 ventiscompleted.pngatAtm.png 
  10533   Wed Sep 24 16:02:58 2014 JenneUpdateVACvent is completed[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off,
light doors are on.  Q is aligning the
  
  10534   Wed Sep 24 18:17:46 2014 ericqUpdateGeneralAlignment RestoredInterferometer
alignment is restored
ASS has been run on each arm, recycling
  
  10535   Wed Sep 24 18:56:45 2014 ericqUpdateGeneralOttavia slownessOttavia was having some severe interaction
latency today. Xorg was taking up >90%
of the CPU, just sitting around. The machine
  
  10536   Thu Sep 25 08:21:15 2014 SteveUpdateVACvent day 1

    

       
            
 ventDay1.png 
  10537   Thu Sep 25 10:53:32 2014 SteveUpdateSUSHeNe laser test  
 
 centeredDay6.png 
  10538   Thu Sep 25 11:33:41 2014 JenneUpdateLSCPOY alignment laser

    

       
            
  
  10539   Thu Sep 25 11:38:47 2014 JenneUpdatePEMSeismometers in place[Zach, Jenne, Steve]
This work happened on Tuesday. 
Bad Jenne for forgetting to elog it!
  
  10540   Thu Sep 25 15:41:15 2014 ericqUpdateComputer Scripts / ProgramsRossa having a better day 
I think I found out why rossa was
mad. 
  
  10541   Thu Sep 25 19:42:12 2014 ericqUpdateGeneralVent progress[q, Jenne, Manasa]
ELOG Outline

    Aligned arms
  
  
  10542   Fri Sep 26 09:13:17 2014 SteveUpdateSUSvent day 2 ITMY in vac table needs leveling.  ventDay2.pngITMY.png 
  10544   Fri Sep 26 12:25:34 2014 ericqUpdateGeneralVent progressI figured out that didn't change the initial
guess for the fit routine in Gabriele's code.
I also changed the fminsearch criteria to
  
  10545   Fri Sep 26 16:10:14 2014 ericqUpdateGeneralVent updateToday so far:

    I moved SRM forward by
3mm
    Then I leveled the ITMY
  
  10546   Fri Sep 26 17:13:39 2014 ericqUpdateGeneralVent update

    

       
            
  
ELOG V3.1.3-