Entry  Mon Apr 20 20:45:25 2009, rana, Configuration, General, SVN: project area added 
I added the [B]/cvs/cds/project/[/B] directory to the SVN. I've noticed that we've been using target/ for code which is not
being targeted for any IOCs. This is out of line with the intention of separating real time FE code from just regular
code that we use for diagnostics or otherwise.
Entry  Thu Apr 24 15:57:53 2008, steve, Configuration, SAFETY, Safety at AP-ISCT P1020197.JPGmcrefl3.JPG
I measured the output power of the psl after the mechanical shutter.

It was 1.1 W with Ophir power meter, than unlocked the MC and measured
Entry  Fri Mar 30 08:58:37 2012, steve, Update, SAFETY, Safety glasses checked safety_glasses_checked.jpg
Bob cleaned all safety glasses in 10 % Liquinox soap in water solution first.  The  transmittance of glasses were checked at 100 mW 1064 nm
S polarization, beam diameter  0.5 mm at 0-20 deg incident.
Coherent FieldMate power meter measured T= < 1 mW of all glasses.
    Reply  Tue Jun 12 15:32:15 2018, Steve, Bureaucracy, General, Salvaged junk from Xend 
Koji's collection of Yend components put away. I cleaned up the  Xend bench today.

Loadcells, leveling wedge mounts  and related items placed under flowbench cabinet next to Guralp staff.

 
Entry  Wed Jun 6 17:22:23 2018, Koji, Bureaucracy, General, Salvaged junk from yend DSC_0661.JPG
While Keerthana and johannes were working at the end, I made a little cleaning at the yend. I salvaged large amount of hardware inclding optics, optomechanics.
We all together should work on returning them to appropriate locations.
Entry  Tue Oct 26 13:27:07 2021, Tega, Summary, Electronics, Sat Amp modification Summary SapAmpModStack.jpgSatAmpInstalled.jpg
Modifications and testing of SatAmp units COMPLETE. Attachments 1 & 2 show all 19 units, one installed unit and the remaining 18 units are
stacked and ready for install. Detailed notes of the modification for each unit are presented in the summary document
in the dcc.
Entry  Mon Sep 20 20:43:38 2021, Tega, Update, Electronics, Sat Amp modifications IMG_20210920_203456226.jpg
Running update of Sat Amp modification work, which involves the following procedure (x8) per unit:


Replace R20 & R24 with 4.99K ohms, R23 with 499 ohms, and remove C16.
(Testing) Connect LEDDrive output to GND
and check that

TP4 is ~ 5V
 TP5-8 ~ 0V. 


Install 40m Satellite to Flange Adapter (D2100148-v1)


 
    Reply  Wed Sep 22 17:22:59 2021, Tega, Update, Electronics, Sat Amp modifications 
[Koji, Tega]

 

Decided to do a quick check of the remaining Sat Amp units before component replacement to identify any unit with defective LED circuits.
Entry  Mon Oct 4 21:58:17 2021, Tega, Update, Electronics, Sat Amp modifications 
Trying to finish 2 more Sat Amp units so that we have the 7 units needed for the X-arm install. 

S2100736 - All good

S2100737 - This unit presented with an issue on the PD1 circuit of channel 1-4 PCB where the voltage reading on TP6, TP7 and TP8 are
    Reply  Tue Oct 5 17:01:20 2021, Koji, Update, Electronics, Sat Amp modifications 
Make sure the inputs for the PD amps are open. This is the current amplifier and we want to leave the input pins open for the test of this circuit.

TP6 is the first stage of the amps (TIA). So this stage has the issue. Usual check if the power is properly supplied / if the pins are properly
connected/isolated / If the opamp is alive or not.
    Reply  Wed Oct 6 16:31:02 2021, Tega, Update, Electronics, Sat Amp modifications 
[Tega, Koji]

(S2100737) - Debugging showed that the opamp, AD822ARZ, for PD2 circuit was not working as expected so we replaced with a spare and
this fixed the problem. Somehow, the PD1 circuit no longer presents any issues, so everything is now fine with the unit.
Entry  Mon Oct 18 16:48:32 2021, Tega, Update, Electronics, Sat Amp modifications IMG_20211018_162918574.jpg
[S2100738, S2100745, S2100751] Completed three more Sat Amp units modification with seven remaining.

 
Entry  Thu Sep 23 14:17:44 2021, Tega, Update, Electronics, Sat Amp modifications debugging update 
Debugging complete.

All units now have the correct TP4 voltage reading needed to drive a nominal current of 35 mA through to OSEM LED. The next step is
to go ahead and replace the components and test afterward that everything is OK.
Entry  Fri Sep 2 21:16:45 2016, rana, Update, Electronics, Satellite Amplifier 
In November of 2010, Valera Frolov (LLO), investigated
our satellite amplifiers and made some recommendations about how to increase the SNR.

In light of the recent issues, we ought to fix up one of the spares into this state and swap it in for the ITMY's funky box.
    Reply  Mon Sep 5 21:05:06 2016, rana, Update, Electronics, Satellite Amplifier osempd.pdf
The attached PDF shows the output noise of the satellite amp. This was calculated using 'osempd.fil' in the 40m/LISO GitLab repo.

The mean voltage output is ~1 Vdc, which corresponds to a current with a shot noise level of 100 nV/rHz on this plot. So the opamp current noise
dominates below 1 Hz as long as the OSEM LED output is indeed quantum limited down to 0.1 Hz. Sounds
    Reply  Tue Sep 6 00:14:14 2016, gautam, Update, Electronics, Satellite Amplifier osempdComparison.pdf
 





If
we have some data with one of the optics clamped and the open light hitting the PD, or with the OSEMs removed and sitting on the table, that would be useful
    Reply  Mon Sep 19 13:25:03 2016, Teng, Update, Electronics, Satellite Amplifier Ele_measurement.pngEle_noise.png
 

In order to figure out the difference betweent simulated result and measurement, I tried to measuren the electronic noise by following ways as
show in attachment 1
    Reply  Wed Feb 10 15:07:50 2021, Anchal, Summary, BHD, Satellite Amplifier Output Offset measurements 
I measured the output DC voltage of the satellite amplifier box at PDMon port when the PDA input was shorted and got following offsets:
 




CH
Output
    Reply  Wed Feb 10 15:25:45 2021, gautam, Summary, BHD, Satellite Amplifier Output Offset measurements 
Why not just do this test with the dummy suspension box and CDS system? I think Rich's claim was that the intrinsic LED RIN was dominant over any
drive current noise but we can at least measure the quadrature sum of the two (which is after all the relevant quantity in terms of what performance
we can realize) and compare to a model.
    Reply  Wed Feb 10 17:18:03 2021, Koji, Summary, BHD, Satellite Amplifier Output Offset measurements 
Testing the satellite amp i.e.  PD driver
- To test the noise of the PD transimpedance amps: Leave the PD input open (do not short the terminal goes to the PD)
- To test the current noise of the LED drivers: Short the output with an appropriate Rs to have the nominal current.
    Reply  Mon Jan 25 18:18:04 2021, Anchal, Summary, BHD, Satellite Amplifier Transfer Functions and noise D1002818_S2100029_TFandNoiseSpectrum.pdfD1002818_Testing.zip
 

I took transfer function and noise measurement of satellite amplifier box's photodiode transimpedance circuit. For the measurement, I created
a makeshift connector to convert backside DB25 into DB9 with the 4 channels for PDA input. The output was taken in differential form at the front PD Output
    Reply  Wed Feb 3 16:27:19 2021, Anchal, Summary, BHD, Satellite Amplifier Transfer Functions and noise After modifications D1002818_S2100029_TFAfterChanges.pdfD1002818_S2100029_OutputNoiseSpecAfterChanges.pdfD1002818_S2100029_InputRefferedNoiseSpecAfterChanges.pdfD1002812_S2100029_After_Modifications_Feb3.jpgAfterChanges.zip
I have made modifications recommended in this doc. The changes made are:


R24: 19.6k to 4.99k Ohms
R20: 19.6k to 4.99k Ohms
R23: 787 to 499 Ohms
Removed C16.


I
took transfer function measurements, fitted them with zeros and poles and plotted it against the zero
    Reply  Wed Feb 10 11:45:59 2021, Anchal, Summary, BHD, Satellite Amplifier Very Low frequency noise After modifications 6x
As suggested, I wrapped the satellite amplifier box D10028128 S2100029 in blanket and foam and took very low frequency spectrum starting from 32 mHz
to 3 Hz. The results are attached along with stiched high frequency measurements from 40m/15793.

Very Low Frequency Spectrum Measurement


D1002818 S2100029 box was powered and covered in a foam blanket.
Additionally,
    Reply  Thu Feb 11 11:10:05 2021, Anchal, Summary, BHD, Satellite Amplifier Very Low frequency noise After modifications AfterChangesSpectrum_AC.zipD1002818_S2100029_OutputNoiseSpecAfterChanges.pdfD1002818_S2100029_InputRefCurrentNoiseSpecAfterChanges.pdfD1002818_S2100029_InputRefDispNoiseSpecAfterChanges.pdf
Here is a proper measurement for PD transimpedance amplifier circuit in the Satellite amplifier box D1002818 S2100029. The input from rear DB25 connector
was left open and measurement was taken with AC coupling with correction by the AC coupling transfer function (Zero at 0, pole at 160 mHz). I have calculated
the input referred displacement noise by calculating the conversion factor of OSEM in A/m. From 40m/12470,
    Reply  Thu Feb 11 16:58:52 2021, rana, Summary, BHD, Satellite Amplifier Very Low frequency noise After modifications 
I expect that a single OSEM channel can't be better than 1e-10 m/rHz above 5 Hz, so probably something wrong in the calibration. 1.6 V/mm seems right
to me, so could be some place else.
    Reply  Thu Oct 7 02:04:19 2021, Koji, Update, Electronics, Satellite amp adapter chassis P_20211006_205044.jpg
The 4 units of Satellite Amp Adapter were done:
- The ears were fixed with the screws
- The handles were attached (The stock of the handles is low)
    Reply  Mon Oct 4 18:35:12 2021, Paco, Update, Electronics, Satellite amp box adapters pcb_no_flush.jpg1U_assembly.jpgfourunits.jpg
[Paco]

I have finished assembling the 1U adapters from 8 to 5 DB9 conn. for the satellite amp boxes. One thing I had to "hack" was the corners
of the front panel end of the PCB. Because the PCB was a bit too wide, it wasn't really flush against the front panel (see Attachment #1), so I just
    Reply  Mon Oct 4 20:46:08 2021, Koji, Update, Electronics, Satellite amp box adapters 
Thanks. You should be able to find the chassis-related hardware on the left side of the benchtop drawers at the middle workbench.

Hardware: The special low profile 4-40 standoff screw / 1U handles / screws and washers for the chassis / flat-top screws for chassis panels
and lids
Entry  Thu Jan 24 22:55:50 2019, gautam, Update, Electronics, Satellite box S/N 102 investigation IMG_7294.JPGD961289-B2.pdf
I had taken Satellite box S/N 102, from the SRM suspension, down to the Y-end as part of debugging. However, at some point, I stopped getting readbacks
from the shadow sensor PDs, even with the Sat. Box tester hooked up (so as to rule out anything funky with the actual OSEMs). Today evening, I did a more
systematic investigation. Schematic with component references is here.
    Reply  Tue Jan 29 17:19:16 2019, gautam, Update, Electronics, Satellite box S/N 105 repaired IMG_7301.JPG
[chub, koji, gautam]

Attachment #1 shows the signal
routing near the Satellite box. Somehow, the female 64 pin IDC connector that brings the signals from the coil driver board wasn't mating well with
Entry  Sat Dec 20 23:37:43 2008, rob, Omnistructure, General, Saturday Night Fever after presumed power failure 

Just came by to pick something up...
Entry  Sun Apr 19 03:34:05 2009, Yoichi, Update, Locking, Saturday night lock 
Tonight I was able to go up to arm power = 33, by mainly tweaking the DARM gain. A small progress.
In order to give more phase margin to the CARM MC_L path, I added a 300:100 filter to C1:LSC-MC.
To reduce the load to the lsc computer I deleted several filters from the filter bank, which were not used in the locking scripts.
Entry  Wed Nov 24 14:34:15 2021, Yehonathan, Update, BHD, Saving on SUSAUX slow channels 
Koji found out that the stock for BIO Acromag modules is very low and that the lead time for ordering new ones is ~ 1-year X-o.

We figure we might need to minimize the number of modules but still keep the Acromag chassis functional.

 
Entry  Tue Jul 15 22:23:51 2014, Andres, Update, 40m Xend Table upgrade, Scan the Xarm for the mode matching 
 Nick and I with the help of Jenne scan the green light when the cavity is unlocked. Nick placed a Beam dump on the IR so that we can just scan
the green, but it was removed as soon as we finished with the measurement. I'm working on the calculation, and i'll be posted solution tonight.
Entry  Sun Jan 10 23:22:56 2010, Jenne, Summary, General, Scattering Measurements of 35W Beam Dumps P1090014_copy.JPGScatterometerSetup.png
On Friday, Rana and I measured the scatter coming from the 35W beam dumps.
(These are the ones with big aluminum heat sinks on the back that
kind of look like little robots with 2 legs...inside the horn is a piece of polished silicon at Brewster's Angle.)
    Reply  Tue Jan 12 09:14:52 2010, steve, Summary, General, Scattering Measurements of 35W Beam Dumps 
 
 What was the power level, polarization and beam size at beam trap?
Entry  Tue Sep 18 18:24:50 2012, Jenne, Update, General, Scattering in BS chamber or ITMX chamber 
I have touched PZT2 such that the beam goes through the 45 degree non-iris target on the beam splitter.  This puts the beam at the center of ITMY,
and without moving the BS, at the center of ITMX.  I say "at the center", but what I really mean is I put the target approximately at the
center, within what looks like, say, 2 mm, by looking from above.  The target was many (5ish) centimeters away from the optic though, so that's why
Entry  Mon Jan 28 19:15:14 2013, Manasa, Update, Scattering, Scattering setup 
 [Jan, Manasa]
We are trying to get some scattering measurements in the Y-arm cavity. We have removed one of  the viewport windows window
covers of ETMY chamber and have installed cameras on a ring that clamps to the window. The window along with the ring attachment is covered with aluminium
    Reply  Wed Jan 30 11:18:31 2013, Manasa, Update, Scattering, Scattering setup 


    
        
            Quote:
        
        
            

            [Jan, Manasa]
    Reply  Thu Jan 31 11:53:31 2013, Manasa, Update, Scattering, Scattering setup 


    
        
            
            Since we are in air, we came up with a plan B. The plan is to temporarily install a mirror in the ITMY
chamber to steer the beam from the laser pointer (installed on the POY table) through ITMY to the pickoff mirror at the ETMY end. This way, we can install
    Reply  Tue Feb 12 23:22:14 2013, Manasa, Update, Scattering, Scattering setup 
 
 [Jan, Manasa]
We installed a camera at the ETMY end to look at the scattering pickoff from the ITMY. We were able to see the whole of the beam tube. We need
Entry  Tue Aug 2 11:52:44 2011, kiwamu, Summary, General, Schedule 
I have updated the 40m public calender.
Main change :
  + The vent starts from 3rd of August
Entry  Mon Feb 7 09:00:26 2022, Paco, Update, General, Scheduled power outage recovery 
[Paco]

Started recovering from scheduled (Feb 05) power outage. Basically, time-reversing through this
list.
    Reply  Mon Feb 7 16:53:02 2022, Koji, Update, General, Scheduled power outage recovery PXL_20220208_001646282.jpgPXL_20220208_001657871.jpg
I went to the X end and found it was warm. Turned out that not all the A/Cs were on. They were turned on now.
    Reply  Fri Feb 11 11:17:00 2022, Anchal, Update, General, Scheduled power outage recovery 
I found that two computers are not powering up in the control room, Ottavia and Allegra. Allegra was important for us as it had the current version of
LIGO CDS workstation installed on, providing us with options to use latest packages written by LIGO CDS team. I think the power issue should be resolvable
if someone opens it and knows what thye are doing. Do we have any way of getting fuse repairs on such computers? Both these computers are Dell XPS 420.
    Reply  Mon Feb 14 21:03:25 2022, Koji, Update, General, Scheduled power outage recovery PXL_20220215_025325118.jpg
I opened the boxes. Allegra has obvious vent of at least 4 caps. And the power supply did not respond even a paper clip test was performed. https://www.silverstonetek.com/downloads/QA/PSU/PSU-Paper%20Clip-EN.pdf
(Paper Clip Test)
=> The mother board and the PSU are dead.
    Reply  Mon Feb 14 18:31:50 2022, Paco, Update, General, Scheduled power outage recovery - IMC recovery progress 
[Paco, Anchal, Tega]

We have been realigning the IMC as of last Friday (02/11). Today we made some significant progress (still at high input power), but the IMC autolocker
is unable to engage a stable mode lock. We have made some changes to reach this point, including re-centering of the MC1 REFL beam on the ccd, centering
    Reply  Tue Feb 15 19:32:50 2022, Koji, Update, General, Scheduled power outage recovery - IMC recovery progress PXL_20220216_001731377.jpgScreen_Shot_2022-02-15_at_16.18.16.pngPXL_20220216_001727465.jpgScreen_Shot_2022-02-15_at_16.22.16.pngPXL_20220216_002229572.jpg
Reduced the IMC power to 100mW

Setup: The power meter was placed right before the final aperture (Attachment 1)

Before the adjustment: Initial position of the HWP was 37.29deg and the input power was 987mW (Attachments 2/3)
    Reply  Fri Feb 11 16:09:11 2022, Anchal, Update, General, Scheduled power outage recovery - Input power increased 
We increased the input power to IMC by replacing the 98% transmission BS by a 10% transmission BS on the detection table (reverse of what mentioned in
40m/16408 see attachment 8-9). We then realigned the BS so that MC RFPD is centered. Then we realigned two steering mirrors to get the beam centered on
    Reply  Wed Feb 9 16:43:35 2022, Paco, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) 
[Paco, Anchal]


We went in and measured the power after the power splitting HWP at the PSL table. Almost right before the PSL shutter (which was closed),
when the PMC was locked we saw ~ 598 mW (!!)
Checking back on ESP300, it seems the channel was not enabled even though the right angle was punched