  15142   Wed Jan 22 19:17:20 2020 gautamConfigurationComputersMegatron: starts up gradeupgrade was done

cronjob testing wasn't one
by one 😢 
  
  15143   Wed Jan 22 20:12:36 2020 gautamUpdatePSLPMC demodulator electrical characterizationSummary:

The mixer
+ LPF
 demodChar.pdfmixerChar.pdf 
  15144   Thu Jan 23 14:37:05 2020 gautamUpdatePSLPMC VGA chip damaged?[jordan, gautam]

Summary:
 VGAchar.pdf 
  15145   Thu Jan 23 15:32:42 2020 gautamConfigurationComputersMegatron: starts up gradeThe burt snapshotting is still not so reliable
- for whatever reason, the number of snapshot
files that actually get written looks random.
  
  15147   Thu Jan 23 18:52:31 2020 gautamUpdatePSLPMC RFPD characterizationSummary:

The RF transimpedance of the PMC
PDH RFPD was measured, and found to be 
 PDresp.pdf 
  15149   Thu Jan 23 22:10:01 2020 gautamUpdatePSLPMC servo pulled outWhile I have the board out, I'll try
and do a thorough investigation of TFs and
noise of the various stages. 
  
  15152   Fri Jan 24 15:42:08 2020 gautamUpdatePSLPMC servo restoredThe PMC servo was re-installed at ~345pm.
HV supplies were re-energized to their nominal
values. I will update the results of the
  
  15153   Fri Jan 24 17:14:01 2020 gautamUpdateALSGain blocks installedJordan will write up the detailed elog
but in summary,


Former +24V Sorensen in
  
  15155   Sun Jan 26 13:30:19 2020 gautamUpdateSUSAll watchdogs tripped, now restoredLooks like a M=4.6
earthquate in Barstow,CA tripped all
the suspensions. ITMX got stuck. I restored
 EQ_Jan25.pdf 
  15156   Sun Jan 26 13:47:00 2020 gautamUpdatePSLPMC servo characterizationSummary:


I investigated the stage-by-stage
transfer functions of the PMC servo up till
 elecTFs.pdfVGAchar_postFix.pdfVGAlinearity_postFix.pdfnewOLTFs.pdf 
  15157   Sun Jan 26 14:40:55 2020 gautamUpdateALSALS OOL noiseIn preparation for resuming IFO locking
activities, I measured the ALS noise with
the arm lengths locked to IR, AUX laser frequencies
 ALSnoise_20200126.pdf 
  15159   Mon Jan 27 18:16:30 2020 gautamConfigurationComputersSluggish megatron?I've also been noticing that the IMC
Autolocker scripts are running rather sluggishly
on Megatron recently. Some evidence - on
  
  15161   Mon Jan 27 21:48:49 2020 gautamUpdatePSLRingdown measurementsIt's fine to block the WFS while doing
ringdowns 
 elevatedSeis.pdf 
  15163   Tue Jan 28 14:33:24 2020 gautamUpdatePSLInferred free-running frequency noiseTo conclude my PMC noise investigations:
Attachment
 inLoopNoise_IMClocked.pdffreqNoiseComparison.pdf 
  15164   Tue Jan 28 15:39:04 2020 gautamConfigurationComputersSluggish megatron?There were a bunch of medm processes stalled
on megatron (connected with screenshot taking).
To see if they were interfering with the
  
  15165   Tue Jan 28 16:01:17 2020 gautamUpdateIOOIMC WFS servos stable againWith all of the shaking (man-made and divine),
it was a hard to debug this problem. Summary
of fixes:
 QPD_recenter.png 
  15167   Tue Jan 28 17:36:45 2020 gautamConfigurationComputersLocal EPICS7.0 installed on megatron[Jon, gautam]

We found that the caput
  
  15171   Wed Jan 29 00:27:13 2020 gautamUpdateComputer Scripts / Programsmcup / mcdown modifiedTo fix the apparent slowness of execution
of the caput
  
  15172   Wed Jan 29 00:29:43 2020 gautamUpdateLSClocking 2020The goal tonight was to go through the
locking scripts to see if I could recover
the state from November 2019, when I could
 PRFPMI_2020Jan.png 
  15179   Thu Jan 30 17:41:10 2020 gautamUpdatePSLErrant FSS_INOFFSET changeYou can trend the data for the past few
hours and see what the appropriate value.
I think
  
  15181   Fri Jan 31 16:04:30 2020 gautamUpdateIOOInput pointing driftOne factor which hampers locking efforts
is the apparent drift of the input beam into
the IFO. Over timescales of ~1 hour, I have
 IPdrift.pdfIPdrift_PRMI.pdf 
  15182   Fri Jan 31 16:57:09 2020 gautamUpdateGeneralMetal PMC partsJon brought over a box of parts for constructing
the metal PMCs. I have stored it along the
Y-arm, on top of the green optics cabinet.
  
  15185   Tue Feb 4 02:13:02 2020 gautamUpdateLSCLocking updatesSummary:

The CARM-->RF transition remains
out of reach. No systematic diagnosis scheme
 modifiedOutMat.pngOLTFs.pdf 
  15188   Wed Feb 5 16:35:12 2020 gautamUpdateLSCDiagnosis planThe goal is to try and identify the source
of the excess ALS noise as the CARM offset
is reduced. The idea is to look at the MC_F
 ALSnoise.pdf 
  15191   Thu Feb 6 01:16:58 2020 gautamUpdateLSCDiagnosis resultsSummary:

I did some more detailed tests
to see if I could isolate where the excess
 IMCspec_ALS.pdfIMCspec_ALS_smallSpan.pdf 
  15192   Thu Feb 6 01:25:50 2020 gautamUpdateLSCLocking updatesSummary:

I managed to partially stabilize
the arm citculating powers - they stay in
 semiStableArms.pngarmAngStability.png 
  15195   Fri Feb 7 02:24:24 2020 gautamUpdateLSCSome short notes[koji, gautam] 

Plots + interpretation tomorrow.


CM_Slow path can be used
  
  15199   Fri Feb 7 15:00:16 2020 gautamUpdateLSCMore high BW POY experimentsTo study the evilution of the AO path TFs
a bit more, I've hooked up POY11_Q Mon
to IN1 of the CM board. I will revert the
 AO_TFs.pdf 
  15202   Mon Feb 10 10:07:20 2020 gautamUpdatePSLPMC re-lockedI found the PMC unlocked this morning.
It was re-locked using the usual procedure.
I feel like this has been happening more
 PMCunlock.png 
  15208   Wed Feb 12 12:13:37 2020 gautamUpdateLSCAO path attemptsSummary:


​The
PRFPMI can be controlled by a mix of ALS
 CARM_OLTF.pdfPRFPMI_errSigs.pdf 
  15209   Thu Feb 13 01:47:39 2020 gautamUpdateALSFast ALS - delay line prepA few years ago, Koji and I setup a delay
line phase shifter, which can be used to
impart a (switchable) delay to a signal path.
 delaySlider.pngdelayLineLosses.pdfdelayLineCal.pdf 
  15210   Thu Feb 13 02:07:26 2020 gautamUpdateLSCAO path transfer function measurementSummary:

I measured the transfer function
of the AO path, and think that there are
 AOpathTF.pdfIMCinLoop.pdf 
  15212   Fri Feb 14 00:53:50 2020 gautamUpdateALSFast ALS - more setupIn the process of setting up some cabling
at 1Y2, I must've bumped a cable to the
c1lsc expansion chassis. Anyways, the c1lsc
 CMSlow_ALSnoise.pdfOLTFmeas.pdf 
  15214   Fri Feb 14 14:52:41 2020 gautamUpdateALSALS OOL noise with arms lockedUnlikely, the alignment was probably just
not good. I restored the alignment and now
the arms can be locked to IR frequency.
  
  15227   Wed Feb 26 22:05:06 2020 gautamUpdateIOOIMC checksToday, I did the following tests (and so
was touching electronics/cables at/around
1X2):
  
  15228   Wed Feb 26 22:09:52 2020 gautamSummaryBHDProjected IFO noise budget, post-BHD upgradeThe quantum noise curves here are not correct.
c.f. amplitude quadrature noise
budget.
  
  15229   Wed Feb 26 23:50:51 2020 gautamUpdateIOOIMC checksIn the style of the KA characterization
of the CM board, the AO path gain EPICS slider
(IN2) of the IMC servo board was stepped
 sliderCal.pdfAO_inputTFs.pdf 
  15230   Thu Feb 27 15:50:37 2020 gautamUpdateElectronicsFSS box power cable removedIn 1X1, there is a box labelled "FSS
REF" below a KEPCO HV supply. This box
had a power cable that wasn't actually
  
  15231   Thu Feb 27 17:50:36 2020 gautamUpdatePSLc1psl setup setup[many people]

in prep for the install tomorrow,
we did the following:
 20200227_173535.jpg20200227_173454_HDR.jpg20200227_172659.jpg 
  15232   Thu Feb 27 17:59:02 2020 gautamUpdateLSCSome AO thoughtsWhile my checks of the AO signal path have
thrown up some unanswered questions, I don't
think there's any evidence in those measurements
  
  15233   Thu Feb 27 22:45:40 2020 gautamUpdateALSALS noise highThere was some UNELOGGED work at EX today.
The DFD outputs were also hijacked for loss
measurement. Unclear
 ALSnoise.pdf 
  15234   Fri Feb 28 08:05:22 2020 gautamUpdatePSLc1psl setup setupAnd so it begins.

  
  15235   Fri Feb 28 10:04:41 2020 gautamUpdatePSLc1psl setup setupSummary:

There are several problems evident
already.
  
  15236   Fri Feb 28 19:37:18 2020 gautamUpdatePSLNew c1psl installed
The new c1psl Acromag crate is
now interfaced to the Eurocrate electronics
in 1X1 (formerly VME c1psl) and 1X2 (formerly
  
  15237   Mon Mar 2 16:14:47 2020 gautamUpdateCDSsome target directory cleanup$TARGET_DIR   
  15238   Mon Mar 2 16:29:40 2020 gautamUpdateElectronicsc1psl VME crate removed, Acro-crate installed[JV, JWR, YD, GV]


The old c1psl VME crate,
and all the ribbon cables connected to it
 c1psl.pdf 
  15239   Mon Mar 2 16:35:12 2020 gautamUpdateCDSc1psl test statusChannel   
  15240   Mon Mar 2 19:32:41 2020 gautamUpdateCDSc1rfm errorsHad to reboot both end machines and the
c1rfm model to get the TRX and TRY signals
to the LSC models. Now both arms can be locked
 RFMerrors.png 
  15242   Tue Mar 3 17:20:14 2020 gautamUpdateElectronicsMore cabling removedJordan and I removed another 10 kg of cabling
from 1X2. The c1iool0 crate now has all cabling
to it disconnected - but it remains in the
  
  15245   Tue Mar 3 19:11:48 2020 gautamUpdateLSCSome locking prep
Re-aligned and locked the arm cavities
for IR and green.
Re-set trans
normalization because after the c1iscex
  