40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 218 of 344  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  5800   Thu Nov 3 17:24:59 2011 ZachUpdateGreen LockingSHG temperature (YARM)I must confess that I changed the temperature
of the laser via the dial yesterday. I believe
the initial (displayed) temperature was ~19o,
  
  5809   Fri Nov 4 13:53:33 2011 KatrinUpdateGreen LockingSHG temperature (YARM)

    
        
  
  11492   Tue Aug 11 11:30:19 2015 IgnacioUpdateIOOSISO (T240-X) FF of MCLLast night we finally got some online subtraction
going. The filter used is described in the
post this eLOG is @eLOG
 MCL.pngMCTRANS.pngYARM.png 
  3481   Fri Aug 27 19:30:31 2010 ranaUpdateCDSSLOW controlsFor the future SLOW controls our current
plan is to keep using the VME based stuff
and associated processors (Baja, Motorola,
  
  10015   Mon Jun 9 22:26:44 2014 rana, zachUpdateCDSSLOW controls recovery All of the SLOW computers were
in limbo since the fileserver/nameserver
change, but me and Zach brought them back.
  
  10025   Wed Jun 11 14:36:57 2014 JenneUpdateCDSSLOW controls recovery 
 I have brought back c1auxex
and c1auxey.  Hopefully this elog
  
  2008   Sun Sep 27 14:45:45 2009 KojiUpdatePSLSLOWscan resultI ran (script dir)/PSL/FSS/SLOWscan on
op440m from 11:30 to 12:30 on 27th. Although
Rana and later I myself set "timed bombs"
 SLOWscan_090927.pngPages_from_miser_126_manual.png 
  2009   Sun Sep 27 15:25:58 2009 KojiUpdatePSLSLOWscan resultOh, AMPMON dependence could be an artifact
of the ND filter???
For my case, it should be real dependence
 power_dependence.png 
  2010   Sun Sep 27 23:21:14 2009 ranaUpdatePSLSLOWscan result

    
        
  
  15775   Wed Jan 20 19:12:16 2021 gautamUpdateCDSSLwebview fixedAfter fixing multiple issues, the model
webviews are updating, should be done
by tomorrow. It should be obvious from the
  
  17226   Thu Nov 3 17:01:47 2022 ChrisUpdateCDSSLwebview fixedThe simulink webview generation cronjob
on megatron was not working, apparently due
to a matlab license problem. I switched it
  
  1867   Sat Aug 8 15:08:14 2009 ranaConfigurationPSLSMOO settings updated in psl.db and SVN updatedI have added/modified SMOO settings to
all of the records in psl.db appropriately.
Changes checked in to SVN.
  
  7947   Mon Jan 28 19:07:45 2013 ManasaUpdateGeneralSN6 Laseroptik mirror - Tranmittance measurementsI repeated the measurements using NPRO
instead of Crystalaser. I am attaching optical
layouts for these measurements for future
 sn6_trans0128.pngtrans_layout.png 
  12553   Wed Oct 12 15:01:22 2016 steveUpdateSUSSOS ITM baffles plates are readyThe two 40 mm apeture baffles at the ends
were replaced by 50 mm one. ITM baffles with
50 mm apeture are baked ready for installation.
 baffle7x9_1.5.jpgbaffle_holder.jpgbaffle_top_view.jpg 
  14587   Thu May 2 10:41:50 2019 gautamUpdateSUSSOS Magnet polarityA concern was raised about the two ETMs
and ITMX having the opposite response (relative
to the other 7 SOS optics) in the OSEM PDmon
  
  13429   Thu Nov 16 00:14:47 2017 Udit KhandelwalUpdateSUSSOS Sapphire Prism designSummary:


SOS solidworks model is
nearly complete

Having trouble
  
  13430   Thu Nov 16 00:45:39 2017 gautamUpdateSUSSOS Sapphire Prism design 




  
  15922   Tue Mar 16 14:37:36 2021 YehonathanUpdateBHDSOS SmCo magnets InspectionIn the cleanroom, I opened the nickel-plated
SmCo magnet box to take a closer look. I
handled the magnets with tweezers. I wrapped
 20210316_142906.jpg20210316_165626.jpg20210316_165838.jpg 
  15931   Wed Mar 17 14:40:39 2021 YehonathanUpdateBHDSOS SmCo magnets InspectionContinuing with envelope number 2




Magnet
  
  15964   Thu Mar 25 14:58:16 2021 YehonathanUpdateBHDSOS SmCo magnets InspectionRedoing magnet measurement of envelope
1:

  
  16326   Tue Sep 14 16:12:03 2021 JordanUpdateSUSSOS Tower HardwareYehonathan noticed today that the silver
plated hardware on the assembled SOS towers
had some pretty severe discoloration on it.
 20210914_160111.jpg 
  16328   Tue Sep 14 17:14:46 2021 KojiUpdateSUSSOS Tower HardwareYup this is OK. No problem.

 
  
  17114   Wed Aug 31 00:32:00 2022 KojiUpdateGeneralSOS and other stuff in the clean roomSalvage these (and any other things).
Wrap and double-pack nicely. Put the labels.
Store them and record the location. Tell
 6x 
  17128   Fri Sep 2 15:26:42 2022 YehonathanUpdateGeneralSOS and other stuff in the clean room{Paco, Yehonathan}

BHD Optics box was put into the
x-arm last clean cabinet. (attachment 5)
 osem_sus.jpegmagnet_gluing.jpeg2-3inch_adapter_parts.jpegTTs.jpegBHD_optics.jpeg 
  15788   Tue Feb 2 17:09:17 2021 yehonathanUpdateBHDSOS assemblyI set up a working area on the table next
to the south flow bench (see attachment).
I also brought in a rolling table for some
 20210202_165501.jpg20210202_162452.jpg 
  15790   Tue Feb 2 18:24:54 2021 KojiUpdateBHDSOS assemblyYou can remove the components of the optical
table enclosure (black ones) and use the
optical table as your working area too.
  
  15796   Thu Feb 4 15:14:55 2021 YehonathanUpdateBHDSOS assemblyI gathered all the components I could find
from the SOS towers and the cleanroom and
put it all on the table next to the flow
 20210204_144007.jpg 
  15808   Tue Feb 16 13:13:39 2021 YehonathanUpdateBHDSOS assemblyGautam pointed out that there are extra
Sm-Co magnets stored in the clean optics
cabinet.
  
  15810   Tue Feb 16 15:29:01 2021 KojiUpdateBHDSOS assemblyThe curie temp of SmCo seems about x2 (in
K) of the one for NdFeB. i.e. 600K vs 1000K.
So I believe 177degC = 450K is not an issue.
  
  15811   Tue Feb 16 22:59:36 2021 YehonathanUpdateBHDSOS assemblyDone.

Also, the magnets are nickel-plated.
I guess that doesn't matter for the baking
  
  15821   Fri Feb 19 12:21:04 2021 YehonathanUpdateBHDSOS assemblyA summary of things that need to be fabricated/purchased/done:




  
  15969   Fri Mar 26 10:25:37 2021 YehonathanUpdateBHDSOS assemblyI measure some of the dowel pins we got
from Mcmaster with a caliper.

One small pin is 0.093" in
  
  15999   Tue Apr 6 15:42:57 2021 YehonathanUpdateBHDSOS assemblyWe got some dumbells from Re-Source Manufacturing
(see attached). I picked 3 in random and
measured their dimensions:
 20210406_150724.png 
  16011   Fri Apr 9 20:54:54 2021 YehonathanUpdateBHDSOS assemblyToday I assembled the skeleton of 6 towers,
without clamps and sensor assembly (attachment
1).
 20210409_202717.jpg20210409_202755.jpg 
  16018   Mon Apr 12 17:30:11 2021 YehonathanUpdateBHDSOS assemblyToday, I screwed the plungers on the sensor
plates and installed them on the Towers.
I also installed the wire clamps on the suspension
 20210412_170913.jpg 
  16111   Mon May 3 16:49:04 2021 YehonathanUpdateBHDSOS assemblyI found a "vice" in the cleanroom
(attachment 1). I used it to push dowel pins
into the last suspension block using some
 20210503_161422.png20210503_161456.jpg 
  16170   Tue Jun 1 16:17:06 2021 YehonathanUpdateBHDSOS assemblyI tried to push the clean Viton tips into
the vented screws just to find out that the
vented holes are too small. We need to drill
  
  16172   Wed Jun 2 01:03:19 2021 KojiUpdateBHDSOS assemblyCan you just cut the viton tips smaller?
If you cut it to have some wedge (or say,
taper), it can get stuck with the vent hole.
  
  16215   Fri Jun 18 19:02:00 2021 YehonathanUpdateBHDSOS assemblyToday I glued some magnets to dumbells.

First, I took 6 magnets (the maximum
I can glue in one go) and divided them into
 20210618_115017.jpgUntitled_2.png20210618_160041_HDR.jpg 
  16216   Fri Jun 18 23:53:08 2021 KojiUpdateBHDSOS assemblyThen, can we replace the four small EQ
stops at the bottom (barrel surface) with
two 1/4-20 EQ stops? This will require drilling
  
  16221   Tue Jun 22 17:05:26 2021 YehonathanUpdateBHDSOS assemblyAccording to the schematics,
the distance between the original EQ tap
holes is 0.5". Given that the original
  
  16227   Mon Jun 28 12:35:19 2021 YehonathanUpdateBHDSOS assemblyOn Thursday, I glued another set of 6 dumbells+magnets
using the same method as before. I made sure
that dumbells are pressed onto the magnets.
 toomuchglue1.pngtoomuchglue2.pngdirtydumbell.pngcleandumbell.pngassembly_on_metalbracket.png 
  16229   Tue Jun 29 20:45:52 2021 YehonathanUpdateBHDSOS assemblyI glued another batch of 6 magnet+dumbell
assemblies. I will take a look at them under
the microscope once they are cured.
 20210629_135736.jpg20210629_135746.jpg 
  16235   Thu Jul 1 16:45:25 2021 YehonathanUpdateBHDSOS assemblyThe bonding test passed - the weight still
hangs from the dumbell. Unfortunately, I
broke the bond trying to release the assembly
  
  16259   Tue Jul 27 17:14:18 2021 YehonathanUpdateBHDSOS assemblyJordan has made 1/4" tap holes in
the lower EQ stop holders (attachment). The
1/4" stops (schematics)
 20210727_154506.png 
  16260   Tue Jul 27 20:12:53 2021 KojiUpdateBHDSOS assembly1 or 2. The stained ones are just fine.
If you find the vented 1/4-20 screws in the
clean room, you can use them.
  
  16262   Wed Jul 28 12:00:35 2021 YehonathanUpdateBHDSOS assemblyAfter receiving two new tubes of EP-30
I resumed the gluing activities. I made a
spreadsheet
  
  16359   Thu Sep 23 18:18:07 2021 YehonathanUpdateBHDSOS assemblyI have noticed that the dumbells coming
back from C&B had glue residues on them.
An example is shown in attachment 1: it can
 dumbell_before.pngdumbell_after.png 
  16426   Tue Oct 26 10:17:14 2021 YehonathanUpdateBHDSOS assemblyThings that I need to start suspending
optics:

1. Winch adapter plate (D970314).
  
  16439   Thu Oct 28 23:13:19 2021 YehonathanUpdateBHDSOS assembly{Tega, Yehonathan, Koji}

Suspension
 OpLev_Setup.jpgsuspended_optic.png20211029_113011.jpg20211029_113052.jpg 
ELOG V3.1.3-