40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 217 of 344  Not logged in ELOG logo
Entry  Tue Dec 17 20:59:23 2013, Jenne, Update, LSC, 1/sqrt(TR) signals added to frames 
Entry  Tue Dec 17 21:28:36 2013, Jenne, Update, LSC, CM servo slow output digitized 
    Reply  Wed Dec 18 00:26:15 2013, Jenne, Update, LSC, Xend QPD schematic investigation 
Entry  Wed Dec 18 03:29:48 2013, Den, Update, LSC, yarm locked on mc MC_ARM.pdf
    Reply  Wed Dec 18 11:32:34 2013, rana, Update, LSC, Xend QPD schematic investigation 
Entry  Wed Dec 18 11:37:12 2013, Jenne, Update, LSC, POP22 and POP110 demod phases 
Entry  Wed Dec 18 13:34:03 2013, Steve, Update, General, LIGOX people 40m2013Dec.jpg40mCup.jpg
Entry  Wed Dec 18 15:35:48 2013, Steve, Update, PEM, excess seismic noise seismicCar.jpg
    Reply  Wed Dec 18 18:45:39 2013, Jenne, Update, LSC, REFL 165 demod phases 
Entry  Thu Dec 19 03:29:34 2013, Den, Update, LSC, CM servo test using yarm is complete EOM.png
Entry  Thu Dec 19 14:40:42 2013, Koji, Update, CDS, RFM Time over mitigation for c1mcs 
Entry  Thu Dec 19 19:45:12 2013, ericq, Update, Green Locking, X-Arm Green PDH Loop Stuff xarmPDHtfs.pdfxarmCLG.pdflayout.pdf
Entry  Fri Dec 20 01:24:11 2013, Den, Update, LSC, high bandwidth loop achieved for yarm CM_OL_meas.pdfcm_ol_sim.pdfCM_slow_fast_cross.pdf
    Reply  Fri Dec 20 03:31:07 2013, Koji, Update, LSC, lock acquisition path for the CM servo 
    Reply  Fri Dec 20 03:34:40 2013, Koji, Update, LSC, high bandwidth loop achieved for yarm 
    Reply  Fri Dec 20 17:41:25 2013, Steve, Update, General, Projector - lightbulb replaced explodedlamp.jpgclweanedWindowShield.jpg
    Reply  Fri Dec 20 20:04:01 2013, Steve, Update, VAC, power supply replaced with a short vent 4hrPumpdown.pngpumpdownAfterHickup.pngPSpumpdown.png
    Reply  Fri Dec 20 22:45:02 2013, Koji, Update, LSC, high bandwidth loop achieved for yarm 
    Reply  Fri Dec 20 23:00:41 2013, Koji, Update, VAC, power supply replaced with a short vent 
    Reply  Sat Dec 21 10:53:35 2013, Steve, Update, VAC, power supply replaced with a short vent-pumpdown completed 20hrsVacNormal.png
    Reply  Thu Jan 2 10:50:24 2014, Steve, Update, VAC, vacuum monitor is still blank Help.pngvacation.png20131220lastRGAscan.png
    Reply  Thu Jan 2 13:35:06 2014, Koji, Update, VAC, vacuum monitor is still blank 
Entry  Mon Jan 6 18:32:17 2014, RANA, Update, IOO, MC1/3 kicked this morning at 8:30 kicked.png
    Reply  Mon Jan 6 20:52:09 2014, Jenne, Update, IOO, MC1/3 kicked this morning at 8:30 
    Reply  Mon Jan 6 22:11:46 2014, Jenne, Update, LSC, PRCL sideband locking still not so happy 
    Reply  Tue Jan 7 10:44:13 2014, Steve, Update, IOO, MC drift 2dTrend.pngdriftNotKick.png
    Reply  Tue Jan 7 11:11:36 2014, rana, Update, IOO, MC drift 
    Reply  Tue Jan 7 16:41:08 2014, manasa, Update, IOO, WFS moving MC suspensions 2dayMCtrend.pngWFSvsMCsuspensions.png
    Reply  Tue Jan 7 17:16:04 2014, manasa, Update, IOO, MC aligned MCspots.png
    Reply  Tue Jan 7 20:57:41 2014, Jenne, Update, IOO, MC aligned 
Entry  Tue Jan 7 21:00:02 2014, Jenne, Update, IOO, IP POS, IP ANG aligned 
Entry  Tue Jan 7 22:44:45 2014, Jenne, Update, CDS, daqd on fb is segfaulting every ~30 seconds 
    Reply  Tue Jan 7 23:08:01 2014, jamie, Update, CDS, /frames is full, causing daqd to die 
    Reply  Tue Jan 7 23:09:10 2014, manasa, Update, IOO, MC aligned WFSdrift.png
    Reply  Tue Jan 7 23:13:47 2014, jamie, Update, CDS, /frames is full, causing daqd to die 
Entry  Tue Jan 7 23:24:41 2014, Jenne, Update, General, IFO plan, list o' things to do 
    Reply  Tue Jan 7 23:50:27 2014, jamie, Update, CDS, /frames space cleared up, daqd stabilized 
Entry  Tue Jan 7 23:53:35 2014, Jamie, Update, CDS, daqd can't connect to c1vac1, c1vac2 
    Reply  Wed Jan 8 13:46:39 2014, Jenne, Update, General, IFO plan, PRM baffle PRMcage_6Sept2012.JPG
    Reply  Wed Jan 8 17:53:26 2014, manasa, Update, General, IFO plan, IPANG telescope IPANG_layout.pngIPANG.png
    Reply  Thu Jan 9 10:34:58 2014, Steve, Update, PSL, PSL pointing changes in pitch Lfnfdnc.png24hPSLpointing.png
    Reply  Thu Jan 9 17:21:45 2014, rana, Update, General, IFO plan, IPANG telescope 
    Reply  Fri Jan 10 10:28:03 2014, Steve, Update, PSL, PSL pointing changes  clamped.png
    Reply  Fri Jan 10 15:33:02 2014, Steve, Update, PSL, laser drift monitor set up idea 2daysDrift.png
    Reply  Mon Jan 13 11:08:48 2014, Steve, Update, PSL, 3 good days of IOO pointing 3gdPSLpointing.png
    Reply  Mon Jan 13 16:50:55 2014, Steve, Update, VAC, Maglev controller needs service 
    Reply  Tue Jan 14 10:12:12 2014, Steve, Update, PSL, laser drift monitor set up idea bad4thday.png
Entry  Tue Jan 14 10:34:57 2014, Steve, Update, PSL, green transmission measurment greenPickUp.jpg
Entry  Wed Jan 15 13:05:30 2014, Jenne, Update, PEM, 4.4 EQ in Fontana, CA 
Entry  Wed Jan 15 18:42:57 2014, Jenne, Update, ASC, POP ASC QPD offline for a few hours this afternoon 
ELOG V3.1.3-