40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 216 of 344  Not logged in ELOG logo
ID Dateup Author Type Category Subject Text Attachments
  10817   Fri Dec 19 14:25:48 2014 diegoUpdateComputer Scripts / Programselog restartedelog was not responding for unknown reasons,
since the elogd process on nodus was alive;
anyway, I restarted it. 
  
  10818   Fri Dec 19 15:59:49 2014 JenneUpdateLSCLockloss from WedI swapped out one of the channels on Q's
lockloss plotter - we don't need POP22Q,
but I do want the PC drive.  
 1102929772_PCdriveRailed.png 
  10819   Fri Dec 19 16:39:25 2014 ericqUpdateComputer Scripts / Programselog autostartI've set up nodus to start the ELOG on
boot, through /etc/init/elog.conf.
Also, thanks to this, we don't need to use
  
  10820   Fri Dec 19 16:59:32 2014 ericqUpdateComputer Scripts / ProgramsFSS Slow servo moved to megatronGiven that op340m showed some undesired
behavior, and that the FSS slow seems prone
to railing lately, I've moved the FSS slow
  
  10821   Fri Dec 19 18:08:46 2014 JenneUpdateCDSSOS!!! HELP!! EPICS freeze 45min+ so far![Jenne, Diego]
The EPICS freeze
  
  10822   Fri Dec 19 19:21:04 2014 diegoUpdateCDSSOS!!! HELP!! EPICS freeze 45min+ so far!

    

       
            
  
  10823   Fri Dec 19 20:32:11 2014 diegoUpdateCDSSOS!!! HELP!! EPICS freeze 45min+ so far![Diego,
Jenne]
 
  
  10824   Fri Dec 19 20:44:23 2014 JenneUpdateComputer Scripts / ProgramsFSS Slow servo moved to megatronToday Q moved the FSS slow servo over to
some init thing on megatron, and some time
ago he did the same thing to the MC auto
  
  10825   Sat Dec 20 00:00:03 2014 ericqUpdateComputer Scripts / ProgramsFSS Slow servo moved to megatronI ssh'd in, and was able to run each script
manually successfully. I ran the initctl
commands, and they started up fine too. 
  
  10826   Sun Dec 21 18:46:06 2014 diegoUpdateIOOMC Error SpectraThe error spectra I took so far are not
that informative, I'm afraid. The first three
posted here refer to Wed 17 in the afternoon,
 SPAG4395_17-12-2014_170951.pdfSPAG4395_17-12-2014_172846.pdfSPAG4395_17-12-2014_175147.pdfSPAG4395_18-12-2014_003414.pdfSPAG4395_18-12-2014_003506.pdf 
  10827   Mon Dec 22 13:34:34 2014 KojiUpdateelogStrange ELOG serachI tried to find my own entry and faced
with a strange behavior of the elog.
The search button invoked the following
  
  10828   Mon Dec 22 15:11:08 2014 ranaUpdateIOOMC Error Spectrache tristezza  
What we want is to have the high
  
  10829   Mon Dec 22 15:46:58 2014 KurosawaSummaryIOOSeven transfer functionsIMC OL TF has been measured from 10K to
10M
 MC_OLTF.pdf 
  10830   Mon Dec 22 16:21:15 2014 ericqUpdateelogStrange ELOG searchIn order to fix ELOG search, I have started
running ELOG v2.9.2 on Nodus.
Sadly,
  
  10831   Mon Dec 22 17:06:14 2014 manasaUpdateGeneralX end AUX laser fiber setup

    

       
            
  
  10832   Mon Dec 22 21:53:08 2014 rana, kojiUpdateIOOSeven transfer functionsToday we were looking at the MC TFs and
pulled out the FSS box to measure it. We
took photos and removed a capacitor with
 MC_OLG.pdf 
  10833   Tue Dec 23 01:55:35 2014 rana, kojiUpdateIOOSeven transfer functionsSome TFs of the TTFSS box  MC_FSS_TF.pdf 
  10834   Tue Dec 23 13:18:37 2014 manasaUpdateGeneralX end AUX laser fiber setup

    

       
            
  
  10835   Tue Dec 23 14:27:16 2014 ericqUpdateCDSChiara moved to UPS Steve and I switched chiara over
to the UPS we bought for it, after ensuring
the vacuum system was in a safe state. Everything
  
  10836   Tue Dec 23 14:30:11 2014 ericqUpdateCDSChiara moved to UPS

    

       
            
  
  10837   Tue Dec 23 14:33:24 2014 SteveUpdateVACChiara gets UPS

    

       
            
 prepUP.png 
  10838   Tue Dec 23 15:37:32 2014 SteveUpdateVACTP3 drypump replaced

    

       
            
  
  10839   Tue Dec 23 16:49:32 2014 ericqUpdateelogStrange ELOG search So, despite having registered users,
it turns out that the "Author"
field is still open for editing when making
  
  10840   Tue Dec 23 18:43:33 2014 diegoUpdateComputer Scripts / ProgramsFSS Slow servo moved to megatron

    

       
            
  
  10841   Tue Dec 23 20:50:39 2014 rana, kojiUpdateIOOSeven transfer functionsToday we decided to continue to modify
the TTFSS board.
The modified schematic can be found
 MC_OLTF.pdfMC_OLTF2.pdfmatlab.zip 
  10842   Wed Dec 24 08:25:05 2014 ranaConfigurationIOOnotes on MC locking I've updated the scripts for the
MC auto locking. Due to some permissions
issues or general SVN messiness, most of
  
  10843   Fri Dec 26 17:45:21 2014 SteveUpdateVACvac pressure rose to 1.3 mTorrWe run out of N2 for the vacuum system.
The pressure peaked at 1.3 mTorr with MC
locked. V1 did not closed because the N2
 noN2.pngbacktoVacNormal.png 
  10844   Fri Dec 26 18:20:42 2014 ranaUpdateComputer Scripts / ProgramsFSS Slow servo thresh change

    

       
            
  
  10845   Sun Dec 28 07:29:16 2014 SteveUpdateVACvacuum is normal

    

       
            
 3d.png 
  10846   Mon Dec 29 21:30:25 2014 ranaUpdateGeneralrecovery
    Control room is at +66 F. Brrrr.

   Alignment of input beam into the IMC
was wacky; locked on HOM.
    Re-aligned
  
  10847   Tue Dec 30 00:46:05 2014 ranaUpdateIOOInvestigations into the mad PCDRIVEKoji and I noticed that there was a comb*
of peaks in the MC and FSS at harmonics of
~37 kHz. Today I saw that this shows up (at
 MC_ERR.pdfplotFSSerr.ipynb.xzMC_ERRcomp.pdf 
  10848   Tue Dec 30 17:26:23 2014 ranaUpdatePSLRelaxation Osc and the NPRO Noise eaterI wonder if the variable bump around 100
kHz can be something about the NPRO and if
the bump we see is the closed loop response
 NE_Mephisto.png 
  10849   Tue Dec 30 20:35:59 2014 ranaSummaryPSLPMC Tune Up
    Calibrated the Phase Adjust
slider for the PMC RF Modulation; did this
by putting the LO and RF Mod out on the TDS
 17.pngPMCcal.ipynb.xzPMC_Osc_Cal.pdf 
  10850   Sun Jan 4 12:49:18 2015 SteveUpdateSUSrecent earthquakesAll suspensions were tripped. Damping were
restored. No obvious sign of damage. BS OSEM-UR
may be sticking ?
 recentEQ.png 
  10851   Sun Jan 4 22:08:46 2015 ranaUpdateIOOMC loop characterizations: PZT/EOM crossover * PMC + MC were unlocked when I came
in.
* I fiddled around some more with
 MC_OLGs.pdfMC_xover.pdf 
  10852   Mon Jan 5 12:42:09 2015 ericqUpdateSUSBS misbehavingThe BS was showing some excess motion.
I think I've fixed it. Order of operations:

    The DC PIT bias from previous
  
  10853   Mon Jan 5 18:15:18 2015 JenneUpdateCDSiscex rebootRana noted last week that TRX's value was
stuck, not getting to the lsc from iscex. 
I tried restarting the individual models
  
  10854   Mon Jan 5 20:17:26 2015 jamieConfigurationCDSGDS upgraded to 2.16.14I upgraded the GDS and ROOT installations
in /ligo/apps/ubuntu12
the control room workstations:
 2015-01-05-200025_1694x996_scrot.png 
  10855   Mon Jan 5 23:36:47 2015 ericqUpdateIOOAO cable reconnected

    

       
            
  
  10856   Tue Jan 6 03:09:17 2015 diegoUpdateLSCPRFPMI status & IFO status [Jenne, Rana, EricQ, Diego]
Tonight we worked on getting the
IFO back in a working status after the break,
 Lockloss_20150106_074552.pngLockloss_20150106_074552_zoom.png 
  10857   Tue Jan 6 03:13:09 2015 ericqUpdateLSCPRFPMI status & IFO statusTwo plots from tonight:
Lock loss. Based on the fact that
it looked like the DARM servo was running
 Jan6lockloss1_zoom.pngJan6_asdcjump.png 
  10858   Tue Jan 6 10:04:39 2015 SteveUpdateIOOhappy IOO   IOO.png 
  10859   Tue Jan 6 17:41:20 2015 JenneConfigurationCDSDTT doesn't do envelopes??[Jenne, Diego]
We are working on trying out the
UGF servos, and wanted to take loop measurements
  
  10860   Wed Jan 7 02:54:09 2015 JenneUpdateLSCFiddling with DARM filtersOne of the things that we had talked about
last night was the totally tiny amount of
phase margin that we have in the CARM and
 DARM_design_orig.pdf 
  10861   Wed Jan 7 02:56:15 2015 diegoUpdateLSCUGF Servo for DARM [Jenne, Diego]
Today we began implementing the UGF
Servos. Things we did:
  
  10862   Wed Jan 7 03:04:13 2015 JenneUpdateLSCTRY (thorlabs pd) weird noise[Jenne, Diego, Rana]
This is a note about work done last
night. 
 TRY_60Hz_peaks_5Jan2015.pdf 
  10863   Wed Jan 7 03:09:15 2015 JenneUpdateLSCPRFPMI status & IFO statusAs a warm-up after the holidays, before
the real locking began, I installed 1064nm
bandpass filters in front of the transmission
  
  10864   Wed Jan 7 09:44:33 2015 ericqUpdateLSCDARM phase budgetAs Jenne mentioned, I created a model of
the DARM OLG to see why we have so little
phase margin. However, it turns out I
 DarmPhaseBudget.pdfDarmOLGresidual.pdf2015-01-DARMphase.zip 
  10865   Wed Jan 7 11:20:22 2015 SteveUpdateLSCX arm T-QPD gets SM1 thread adapterC1:SUS-ETMX_QPD is removed and internal
SM1 thread adapter epoxied into position
as it is at
  
  10867   Wed Jan 7 12:15:17 2015 manasaUpdateGeneralNew RF cablesI was
working around the PSL table this morning.
1. I have fibers running from
  
ELOG V3.1.3-