ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
9507
|
Fri Dec 20 22:45:02 2013 |
Koji | Update | LSC | high bandwidth loop achieved for yarm | I checked the offset situation in the CM
servo boost circuit.
- The offset voltage on the CM servo |
|
9509
|
Sat Dec 21 01:54:04 2013 |
Koji | Configuration | LSC | LSC Whitening for the DCPDs/CM servo replaced | The previous LSC whitening filters for
the DCPDs were in an unknown state (although
the transfer functions were actually measured |
|
9523
|
Mon Jan 6 22:11:46 2014 |
Jenne | Update | LSC | PRCL sideband locking still not so happy |
The PRCL once again doesn't
want to lock on sidebands for me. I |
|
9537
|
Wed Jan 8 13:01:48 2014 |
Gabriele | Summary | LSC | Effect of PRC length mismatch on error signals | I
ran a simulation of a double cavity with
a PRC length mismatched w.r.t. the modulation |
|
9539
|
Wed Jan 8 16:08:52 2014 |
ericq | Summary | LSC | Effect of PRC length mismatch on error signals | [ericq,Gabriele]
So, we want an relatively quick measurement
of the PRC length error (with sign!) at the |
|
9541
|
Wed Jan 8 19:05:30 2014 |
Gabriele | Summary | LSC | Effect of PRC length mismatch on error signals | [Gabriele,
EricQ]
|
 |
9544
|
Thu Jan 9 17:58:31 2014 |
ericq | Summary | LSC | Effect of PRC length mismatch on error signals | [ericq, Gabriele, Manasa]
We wanted to perform the PRC
length measurement today with an AS11 signal, |
|
9546
|
Fri Jan 10 15:31:07 2014 |
rana | Summary | LSC | Effect of PRC length mismatch on error signals |
Its very doubtful that the
MC yaw drift matters for the IFO. That's |
|
9548
|
Sun Jan 12 09:57:24 2014 |
Gabriele | Summary | LSC | Effect of PRC length mismatch on error signals |
|
|
9551
|
Mon Jan 13 19:31:04 2014 |
Gabriele | Summary | LSC | PRMI locking | [Gabriele, EricQ]
We wanted to try the PRC length measurement,but
we ended up spending all the afternoon to |
|
9554
|
Tue Jan 14 19:05:48 2014 |
Gabriele | Summary | LSC | PRMI locked on sideband | [Gabriele, EricQ]
Finally, we managed to lock PRMI
on sidebands: |
|
9555
|
Tue Jan 14 19:10:51 2014 |
Gabriele | Summary | LSC | PRC length measurement | [EricQ, Gabriele]
We could carry out the measurement
of PRC length. The AS110 photodiode was plugged |
|
9557
|
Wed Jan 15 18:18:15 2014 |
Gabriele | Summary | LSC | PRC length measurement analysis | I analyzed the data we took yesterday,
both using AS11 and AS55. For each value
of the phase I estimated the Q/P ratio using |
  |
9560
|
Thu Jan 16 21:38:13 2014 |
ericq | Update | LSC | Repeat of PRC length measurement | [ericq,Jenne]
Since we don't have agreement between
the measurements we made the other day and |
|
9561
|
Fri Jan 17 11:44:25 2014 |
Gabriele | Summary | LSC | More length measurements, more confusion | I analyzed the data taken yesterday.
The AS11 data in PRMI configuration
is very bad, while the AS55 seems good enough: |
 |
9564
|
Wed Jan 22 09:05:42 2014 |
Gabriele | Configuration | LSC | REFL11 back | Yesterday night I plugged back the
REFL11 RF cable into the corresponding demodulation
board. |
|
9573
|
Fri Jan 24 12:44:25 2014 |
Gabriele | HowTo | LSC | Procedure to measure PRC length | Here is how to measure the PRC length with
a set of distance measurements in the optical
setup. |
8x |
9574
|
Fri Jan 24 13:10:12 2014 |
Jamie | HowTo | LSC | Procedure to measure PRC length |
|
|
9575
|
Sat Jan 25 21:09:16 2014 |
gabriele | HowTo | LSC | Procedure to measure PRC length | I know the drawing is wrong.
I put random distances, not realistic ones,
and I did not try to get something close |
|
9586
|
Wed Jan 29 21:01:03 2014 |
Gabriele | Summary | LSC | PRC length measurement analysis | [Manasa,
EricQ, Gabriele]
We |
 |
9588
|
Thu Jan 30 19:00:25 2014 |
Gabriele | Summary | LSC | PRC length changed | [Manasa,
EricQ, Gabriele]
Today |
 |
9590
|
Fri Jan 31 19:29:36 2014 |
Gabriele | Summary | LSC | PRC and SRC lengths | Today we measured the missing distance
to reconstruct SRC length.
I also changed the way the mirror |
 |
9606
|
Wed Feb 5 20:41:57 2014 |
Den | Update | LSC | calibrated spetra from OAF test | We did online adaptive filtering test with
IMC and arms 1 year ago (log
7771). In the 40m presentations I can |
|
9614
|
Sat Feb 8 15:14:18 2014 |
ericq | Update | LSC | PRM Sideband Splitting | [ericq]
Today, I kicked the PRM to see the
sideband splitting in POP110. |
|
9626
|
Wed Feb 12 11:57:55 2014 |
Jenne | Update | LSC | Musings on RFPDs | [Rana, Jenne, Manasa]
We looked at the I vs. Q separation
in several of the Refl PDs, while driving |
|
9630
|
Wed Feb 12 19:47:40 2014 |
Jenne | Update | LSC | Calibrated REFL signals | I calibrated the REFL signals to meters
from counts. The I-phase signals all
line up very nicely, but the Q-phase signals |
|
9631
|
Wed Feb 12 20:30:41 2014 |
Koji | Update | LSC | Calibrated REFL signals | We usually want to remove PRCL from the
Q quadrature for each PD.
Therefore, you are not supposed to |
|
9634
|
Thu Feb 13 19:36:36 2014 |
Koji | Summary | LSC | PRM 2nd/4th violin filter added | Jenne and I noticed high pitch sound from
our acoustic interferometer noise diagnostic
system. |
|
9635
|
Thu Feb 13 22:27:54 2014 |
Jenne | Update | LSC | PRMI locked on REFL 33 I&Q | [Jenne, Koji]
I was able to get the PRMI locked
on REFL33 I&Q, but it wasn't overly stable, |
|
9636
|
Fri Feb 14 00:58:41 2014 |
Jenne | Update | LSC | Thoughts on Transition to IR | [Koji, Jenne, EricQ, Manasa]
We |
|
9641
|
Sun Feb 16 17:40:11 2014 |
Koji | Update | LSC | Friday Night ALS | I wanted to try common/differential ALS
Friday evening. I tried ALS using the LSC
servo but this was not successfull. |
|
9646
|
Tue Feb 18 18:52:08 2014 |
Jenne | Update | LSC | ALS not locking with LSC | Koji mentioned to me (and elogged) that
he was unsuccessful locking the ALS using
the LSC servos. He suggested I look |
   |
9647
|
Tue Feb 18 20:31:29 2014 |
Koji | Update | LSC | ALS not locking with LSC | Hmm. Wierd. Can you look at the TFs between
ETMX-EXC and the error signals so that we
can identify which one has these structures. |
|
9648
|
Tue Feb 18 23:27:14 2014 |
Jenne | Update | LSC | ALS not locking with LSC | It looks like its somehow a discrepancy
between the TFs of each error signal, because
features are similar, and present, in both |
|
9649
|
Tue Feb 18 23:55:33 2014 |
Jenne | Update | LSC | ALS locked with LSC! | I'm really excited, so I'm posting this,
even though I'm still working:
|
|
9650
|
Wed Feb 19 00:35:23 2014 |
Koji | Update | LSC | ALS locked with LSC! | Great. I indeed disabled all of the triggers
and the normalization during my trial but
in vain. |
|
9651
|
Wed Feb 19 01:33:03 2014 |
Jenne | Update | LSC | ALS locked with LSC! | I am also not able to lock the ALS using
the 'regular' LSC filters. To figure
out what filters were doing what, I made |
  |
9652
|
Wed Feb 19 03:07:22 2014 |
Jenne | Update | LSC | ALS locked with LSC! | No more progress tonight.
I am still unable to lock the ALS using the
regular LSC filters. I went back to |
|
9654
|
Wed Feb 19 11:00:16 2014 |
ericq | Update | LSC | Some Simulation Efforts | Q EDIT: THIS
IS WRONG. I LOCKED PRC ON THE CARRIER
As
Koji measured the other day: MICH and |
   |
9655
|
Wed Feb 19 11:45:12 2014 |
Jenne | Update | LSC | Scripts for ALS being modified | We
need to change several scripts for use with
the new ALS-in-the-LSC paradigm: |
|
9656
|
Wed Feb 19 14:14:46 2014 |
ericq | Update | LSC | Some Simulation Efforts | Q EDIT: THIS
IS WRONG. I LOCKED PRC ON THE CARRIER
Koji
noted oddities in the sensing matrix results |
  |
9657
|
Wed Feb 19 16:42:08 2014 |
ericq | Update | LSC | Some Simulation Efforts | Disregard previous
ELOGs, I had the PRC locked on carrier |
 |
9658
|
Wed Feb 19 18:21:33 2014 |
manasa | Update | LSC | Scripts for ALS modified |
|
|
9659
|
Wed Feb 19 22:47:26 2014 |
Jenne | Update | LSC | ALS locked using LSC model, Common & Diff transitioned to IR transmission signals | [Jenne, Koji, Manasa, EricQ]
Today
we successfully locked the ALS using the |
 |
9660
|
Fri Feb 21 12:45:57 2014 |
ericq | Update | LSC | Equivalent Displacement Noise from QPD Dark Noise in SQRTINV | EQ UPDATE: Measured it wrong the first
time, fixed now.
I measured the spectra of the SQRTINV |
 |
9668
|
Tue Feb 25 00:00:01 2014 |
rana, jenne | Update | LSC | reasons that the REFL signals may be degenerate now | We're exploring some effects which may
give some funny macroscopic detuning and
cause a near phase degeneracy in the REFL |
|
9669
|
Tue Feb 25 02:46:38 2014 |
rana, jenne | Update | LSC | Changing PRCL offset changes REFL 165 degeneracy | [Jenne, Rana]
We put offsets in the PRCL and MICH
loops, and measured sensing matrices for |
|
9670
|
Tue Feb 25 14:48:49 2014 |
ericq | Update | LSC | Changing PRCL offset changes REFL 165 degeneracy | After speaking with Jenne and Gabriele,
I did a little bit of simulating based on
my earlier code that looked at the angle |
 |
9671
|
Tue Feb 25 16:07:33 2014 |
ericq | Update | LSC | Changing PRCL offset changes REFL 165 degeneracy | And glossing over the MICH offset,
here's the PRC offset plots in displacement,
rather than radians. |
 |
9673
|
Tue Feb 25 17:27:41 2014 |
Jenne | Update | LSC | REFL signals calibrated | I have recalibrated the REFL signals.
I first adjusted the demod phases
until the I-signals lined up with the I-phase |
 |