Entry  Fri Aug 13 20:58:20 2010, Jenna, Summary, Electronics, Rubidium clock phase noise measurement 6x
 Here's an overview of the rubidium measurement:
Entry  Tue Aug 10 15:23:35 2010, Jenna, Update, Electronics, Rubidium clock time constant 
[Jenna & Alastair]
We changed the locking time constant on one of the Rubidium clocks using the RbMon software that came with it. We had to use the ancient Dell laptop
latitudeD810 because it has a serial port built in, and we couldn't get the usb->serial adapter to work right with the clock. We tried the usb connector
Entry  Wed Aug 4 19:50:58 2010, rana, Configuration, Electronics, Rubidium clocks too hot: hut removed beat.png
Alastair found that the foam hut that he and Jan put on top of the Rb clocks to temperature stabilize them was too good of an insulator. The Rb boxes
had gotten very hot and became internally unlocked as seen on the front panel.
After we let them cool down with the box off, I turned them back on. After several minutes the 'Locked' light came back on. Some minutes after
    Reply  Tue Apr 12 09:14:57 2016, Steve, Update, SUS, Ruby wire - v - groove cut pictures Sapphire_prism_wire_standoff.JPG
The ruby wire standoff V groove cuts are looking good.

I will request free sample of  sapphire prizm where one side would have SOS's R cylindrical surface.

The present plan to have the v-groove on this prism.
    Reply  Mon Dec 14 14:08:49 2015, Steve, Update, SUS, Ruby wire standoffs update 
Two companies are willing to  make the ruby grooves and the third one is still working on their quote.

The price is ~$100 each. The cost goes down 10% if we  order 50 instead of 30 pieces.

How many should we get ?
Entry  Thu Feb 26 10:56:34 2015, manasa, Update, General, Running cables 
[Steve, Manasa]

We ran power cables and sma cables for the FOL fiber module from the PSL table to the IOO rack.
Entry  Wed May 31 12:58:30 2017, Eric Gustafson, Update, LSC, Running the 40 m PD Frequency Response Fiber System; Hardware and Software Overall_schematic_D1300603-v2.pdf
Overall Design

A schematic of the overall subsystem diagran in attachment.

RF and Optical Connections
Entry  Sun Oct 4 13:53:30 2015, jamie, Update, LSC, SENSMAT oscillator used for EPICS tests 
I've taken over one of the SENSMAT oscillators for a test of the EPICS system.

These are the channels I've modified, with their original and current settings:



controls@donatella|~ > caget C1:LSC-OUTPUT_MTRX_7_13 C1:CAL-SENSMAT_CARM_OSC_FREQ C1:CAL-SENSMAT_CARM_OSC_CLKGAIN
C1:LSC-OUTPUT_MTRX_7_13
Entry  Wed Oct 6 22:46:36 2010, kiwamu, Update, Green Locking, SHG at PSL table 
 I put some optics to get the green SHG on the PSL table.
Now a green light successfully comes out from the doubling crystal.
Since the optical layout of the PSL table was dramatically changed, I had to re-setup the green SHG stuff. 
Entry  Fri Jul 9 12:25:25 2010, kiwamu, Update, Green Locking, SHG on PSL table PSL_doubling.png
In order to increase the green power on the PSL table, I moved the
position of the Second Harmonic Generation (SHG) crystal by ~5cm.
After this modification, the green power increased from 200 uW to 640
    Reply  Tue Jul 13 11:00:29 2010, kiwamu, Update, Green Locking, SHG on PSL table : optimum temeprature power_temp.png
The optimum temperature for the doubling crystal on the PSL table was found
to be 36.8 deg.
I scanned the temperature of the crystal from 44 deg to 29 deg, in order to find the optimum temperature where the frequency doubled power is maximized. 
    Reply  Tue Jul 13 11:20:07 2010, Dmass, Update, Green Locking, SHG on PSL table : optimum temeprature 
 
 It seems like you might inherit an offset by using step (3) b/c of the temperature gradient between the crystal and the sensing point. Depending
on how large this gradient is you could increase the linear coupling from temperature to intensity noise from zero to a significant number. Phase noise
Entry  Thu Nov 3 16:43:44 2011, Katrin, Update, Green Locking, SHG temperature (YARM) 
Plugging in the thermal feedback BNC cable to the laser reduced the DC voltage of the green PDH photo diode from 3.12 V to 1.5V off resonance. 
The power emitted by the laser was the same as in the case without that cable. Note LT, i.e. measured crystal temperature, of the laser show a
different value when the BNC is connected, but the manual clearly states that this display does not work properly if a cable is connected to the
    Reply  Thu Nov 3 17:04:23 2011, Koji, Update, Green Locking, SHG temperature (YARM) 
Changing the crystal temperature changes the laser frequency. This will causes the beat note missing at the vertex.
In other words, you will find the beat note at the vertex when the actual temperature of the crystal is reproduced as before, 
no matter how the dial setting/temp voltage input is.
    Reply  Thu Nov 3 17:24:59 2011, Zach, Update, Green Locking, SHG temperature (YARM) 
I must confess that I changed the temperature of the laser via the dial yesterday. I believe the initial (displayed) temperature was ~19o,
whereas it is now probably in the high 20s. Sorry.


    
        
            
    Reply  Fri Nov 4 13:53:33 2011, Katrin, Update, Green Locking, SHG temperature (YARM) 


    
        
          
 
            Quote:
            
        
        
            
            I
    Reply  Tue Aug 11 11:30:19 2015, Ignacio, Update, IOO, SISO (T240-X) FF of MCL MCL.pngMCTRANS.pngYARM.png
Last night we finally got some online subtraction going. The filter used is described in the post this eLOG is @eLOG
11488. 

The results were as follow:
    Reply  Fri Aug 27 19:30:31 2010, rana, Update, CDS, SLOW controls 
For the future SLOW controls our current plan is to keep using the VME based stuff and associated processors (Baja, Motorola, etc.). This is not 
a sustainable plan since these are obsolete and eventually will die. One option is to use these boxes from Diamond Systems:
http://www.diamondsystems.com/products/octavio
    Reply  Mon Jun 9 22:26:44 2014, rana, zach, Update, CDS, SLOW controls recovery 
 All of the SLOW computers were in limbo since the fileserver/nameserver change, but me and Zach brought them back. 
One of the troubles, was that we were unable to telnet into these computers once they failed to boot (due to not having a connection to their bootserver).

    Needed special DB9-RJ45 cable to connect from (old) laptop serial ports to the Motorola VME162 machines (e.g. c1psl, c1iool0, c1aux,
    Reply  Wed Jun 11 14:36:57 2014, Jenne, Update, CDS, SLOW controls recovery 
 
 I have brought back c1auxex and c1auxey.  Hopefully this elog will have some more details to add to Rana's elog
10015, so that in the end, we have the whole process documented.
Entry  Sun Sep 27 14:45:45 2009, Koji, Update, PSL, SLOWscan result SLOWscan_090927.pngPages_from_miser_126_manual.png
I ran (script dir)/PSL/FSS/SLOWscan on op440m from 11:30 to 12:30 on 27th. Although Rana and later I myself set "timed bombs" for the scan,
they did not work as they have probably been ran on Linux. After the scan I relocked PMC, FSS, and MZ . MC locked automatically.
Observation:
    Reply  Sun Sep 27 15:25:58 2009, Koji, Update, PSL, SLOWscan result power_dependence.png
Oh, AMPMON dependence could be an artifact of the ND filter???
For my case, it should be real dependence on the NPRO wavelength,
as the other PDs like the PMC reflection (PMC_RFPDDC) and the RC reflection (FSS_RFPDDC) show the same dependence.
    Reply  Sun Sep 27 23:21:14 2009, rana, Update, PSL, SLOWscan result 


    
        
            Quote:
        
        
            
Entry  Wed Jan 20 19:12:16 2021, gautam, Update, CDS, SLwebview fixed 
After fixing multiple issues, the model webviews are updating, should be done by tomorrow. It should be obvious from the timestamps on the index
page which are the new ones. These new screens are better than the old ones and offer more info/details. Please look at them, and let me know if
there are broken links etc. Once we are happy with this new webview, we can archive the old files and clean up the top directory a bit. I don't
Entry  Sat Aug 8 15:08:14 2009, rana, Configuration, PSL, SMOO settings updated in psl.db and SVN updated 
I have added/modified SMOO settings to all of the records in psl.db appropriately. Changes checked in to SVN.
As a reminder, you should check in to the SVN all changes you
make to any of the .db files or any of the .ini files in chans.
    Reply  Mon Jan 28 19:07:45 2013, Manasa, Update, General, SN6 Laseroptik mirror - Tranmittance measurements sn6_trans0128.pngtrans_layout.png
I repeated the measurements using NPRO instead of Crystalaser. I am attaching optical layouts for these measurements for future reference. 
Lesson learnt : Do not use Crystalaser for transmission measurements and always separate the transmitted main beam from other beams that result
from the wedged surface of the mirror. 
    Reply  Wed Oct 12 15:01:22 2016, steve, Update, SUS, SOS ITM baffles plates are ready baffle7x9_1.5.jpgbaffle_holder.jpgbaffle_top_view.jpg
The two 40 mm apeture baffles at the ends were replaced by 50 mm one. ITM baffles with 50 mm apeture are baked ready for installation.




Quote:



 Green
    Reply  Thu May 2 10:41:50 2019, gautam, Update, SUS, SOS Magnet polarity 
A concern was raised about the two ETMs and ITMX having the opposite response (relative to the other 7 SOS optics) in the OSEM PDmon channel in response
to a given polarity of PIT/YAW offset being applied to the coils. Jon has factored into account all the digital gains in the actuation part of
the CDS system in making this conclusion. I raised the possibility of the OSEM coil winding direction being opposite on the 15 OSEMs of the ETMs and ITMX,
Entry  Thu Nov 16 00:14:47 2017, Udit Khandelwal, Update, SUS, SOS Sapphire Prism design 
Summary:


SOS solidworks model is nearly complete

Having trouble with the design of the sensor/actuator head assembly and the
lower clamps


After Gautam's suggestion, installed Abaqus on computer. Teaching it to myself to eventually do FEM analysis
    Reply  Thu Nov 16 00:45:39 2017, gautam, Update, SUS, SOS Sapphire Prism design 
 




Quote:


 

If I
Entry  Tue Mar 16 14:37:36 2021, Yehonathan, Update, BHD, SOS SmCo magnets Inspection 20210316_142906.jpg20210316_165626.jpg20210316_165838.jpg
In the cleanroom, I opened the nickel-plated SmCo magnet box to take a closer look. I handled the magnets with tweezers. I wrapped the tips of the tweezers
with some Kapton tape to prevent scratching and magnetization.

I put some magnets on a razor blade and took some close-up pictures of the face of the magnets on both sides. Most of them look like attachment
    Reply  Wed Mar 17 14:40:39 2021, Yehonathan, Update, BHD, SOS SmCo magnets Inspection 
Continuing with envelope number 2




Magnet number
Magnetic field (kG)


1
2.89


2
2.85


3
2.92


4
2.75


5
2.95


6
2.91


7
2.93


8
2.9


9
2.93


10
2.9


11
2.85


12
2.89


13
2.85


14
2.88


15
2.92


16
2.75


17
2.97


18
2.88


19
2.85


20
2.87


21
2.93


22
2.9


23
2.9


24
2.89


25
2.88


26
2.8
    Reply  Thu Mar 25 14:58:16 2021, Yehonathan, Update, BHD, SOS SmCo magnets Inspection 
Redoing magnet measurement of envelope 1:




Magnet
#
Max Magnetic Field (kG)


1

2.89
Entry  Tue Sep 14 16:12:03 2021, Jordan, Update, SUS, SOS Tower Hardware 20210914_160111.jpg
Yehonathan noticed today that the silver plated hardware on the assembled SOS towers had some pretty severe discoloration on it. See attached picture.

These were all brand new screws from UC components, and have been sitting on the flow bench for a couple months now. I believe this is just oxidation
and is not an issue, I spoke to Calum as well and showed him the attached picture and he agreed it was likely oxidation and should not be a problem once
    Reply  Tue Sep 14 17:14:46 2021, Koji, Update, SUS, SOS Tower Hardware 
Yup this is OK. No problem.

 
Entry  Wed Aug 31 00:32:00 2022, Koji, Update, General, SOS and other stuff in the clean room 6x
Salvage these (and any other things). Wrap and double-pack nicely. Put the labels. Store them and record the location. Tell JC the location.
    Reply  Fri Sep 2 15:26:42 2022, Yehonathan, Update, General, SOS and other stuff in the clean room osem_sus.jpegmagnet_gluing.jpeg2-3inch_adapter_parts.jpegTTs.jpegBHD_optics.jpeg
{Paco, Yehonathan}

BHD Optics box was put into the x-arm last clean cabinet. (attachment 5)

OSEMs were double bagged in a labeled box on the x-arm wire racks. (attachment 1)
Entry  Tue Feb 2 17:09:17 2021, yehonathan, Update, BHD, SOS assembly 20210202_165501.jpg20210202_162452.jpg
I set up a working area on the table next to the south flow bench (see attachment). I also brought in a rolling table for some extra space.

I covered all the working surfaces with a foil from the big roll between 1x3 and 1x4.

I took the SOSs, SOS parts and the OSEMS from the MC2 table to the working area.
    Reply  Tue Feb 2 18:24:54 2021, Koji, Update, BHD, SOS assembly 
You can remove the components of the optical table enclosure (black ones) and use the optical table as your working area too.

 
    Reply  Thu Feb 4 15:14:55 2021, Yehonathan, Update, BHD, SOS assembly 20210204_144007.jpg
I gathered all the components I could find from the SOS towers and the cleanroom and put it all on the table next to the flow bench (See attachment).

I combed through the cleanroom cabinet for SOS parts but didn't find all the parts listed in the procurement
spreadsheet. I did find some extra items that were not listed.
    Reply  Tue Feb 16 13:13:39 2021, Yehonathan, Update, BHD, SOS assembly 
Gautam pointed out that there are extra Sm-Co magnets stored in the clean optics cabinet.

I took the magnet box out and put it on the rolling table next to south flow bench. The box contains 3 envelopes with magnets.

They are labelled as following:
    Reply  Tue Feb 16 15:29:01 2021, Koji, Update, BHD, SOS assembly 
The curie temp of SmCo seems about x2 (in K) of the one for NdFeB. i.e. 600K vs 1000K. So I believe 177degC = 450K is not an issue. Just make sure the
curie temp, referring the specific property for the magnets from this company. (You already know the company from the procurement doc). It'd be great
if you upload the doc on the 40m wiki.
    Reply  Tue Feb 16 22:59:36 2021, Yehonathan, Update, BHD, SOS assembly 
Done.

Also, the magnets are nickel-plated. I guess that doesn't matter for the baking (Curie temp of 355 °C)?




Quote:


    Reply  Fri Feb 19 12:21:04 2021, Yehonathan, Update, BHD, SOS assembly 
A summary of things that need to be fabricated/purchased/done:




Part
What needs to be done
How much more needed


    Reply  Fri Mar 26 10:25:37 2021, Yehonathan, Update, BHD, SOS assembly 
I measure some of the dowel pins we got from Mcmaster with a caliper.

One small pin is 0.093" in diameter and 0.376" in length. The other sampled small pin has the same dimensions.

One big pin is 0.187" in diameter and 0.505" in length. The other is 0.187" in diameter and 0.506" in length.
    Reply  Tue Apr 6 15:42:57 2021, Yehonathan, Update, BHD, SOS assembly 20210406_150724.png
We got some dumbells from Re-Source Manufacturing (see attached). I picked 3 in random and measured their dimensions:

1. 0.0760" in diameter, 0.0860" in length

2. 0.0760" in diameter, 0.0860" in length
    Reply  Fri Apr 9 20:54:54 2021, Yehonathan, Update, BHD, SOS assembly 20210409_202717.jpg20210409_202755.jpg
Today I assembled the skeleton of 6 towers, without clamps and sensor assembly (attachment 1).

Some of the side plates have this weird hole that doesn't fit any of the suspension blocks (attachment 2). I didn't notice when I counted
the parts and now there are exactly enough side plates to assemble 7 towers.
    Reply  Mon Apr 12 17:30:11 2021, Yehonathan, Update, BHD, SOS assembly 20210412_170913.jpg
Today, I screwed the plungers on the sensor plates and installed them on the Towers. I also installed the wire clamps on the suspension blocks (attachment).

I ran into problems in 2 separate suspension blocks: one had a dowel pin that was slightly too fat for the wire clamp. In another, the
tapped holes were too short so that the 4-40 screws couldn't be screwed all the way.
    Reply  Mon May 3 16:49:04 2021, Yehonathan, Update, BHD, SOS assembly 20210503_161422.png20210503_161456.jpg
I found a "vice" in the cleanroom (attachment 1). I used it to push dowel pins into the last suspension block using some alcohol as a lubricant.

I then assembled the 7th and last suspension tower (attachment 2).

Things that need to be done:
    Reply  Tue Jun 1 16:17:06 2021, Yehonathan, Update, BHD, SOS assembly 
I tried to push the clean Viton tips into the vented screws just to find out that the vented holes are too small. We need to drill 0.1" diameter
holes about 0.1" deep into these screws and clean them again.

 