40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 214 of 357  Not logged in ELOG logo
Entry  Wed Aug 28 03:28:00 2013, Jenne, Update, LSC, Playing with DRMI, some ASS automation prep 
    Reply  Wed Aug 28 05:21:58 2013, manasa, Update, CDS, CDS svn commits not happening 
Entry  Wed Aug 28 06:17:15 2013, manasa, Update, Computer Scripts / Programs, alias for MATLAB2010 
Entry  Wed Aug 28 06:26:28 2013, manasa, Update, Computer Scripts / Programs, ASS req and snap files edited 
Entry  Wed Aug 28 07:33:51 2013, manasa, Update, LSC, MICH locking MICH.pdf
    Reply  Wed Aug 28 11:15:02 2013, Steve, Update, Green Locking, Xend green layout corrections 
    Reply  Wed Aug 28 11:23:41 2013, Steve, Update, VAC, crane repair sheduled 
    Reply  Wed Aug 28 15:41:42 2013, Steve, Update, VAC, RGA scan at day 23 pd75md23.png
Entry  Thu Aug 29 17:25:50 2013, Jamie, Update, SUS, SUS medm screen upgrade 
    Reply  Fri Aug 30 08:08:29 2013, steve, Update, safety, fire horns-flashers tested OK 
Entry  Fri Aug 30 11:00:46 2013, Manasa, Update, General, Series of earthquakes Screenshot-Earthquakes_-_Mozilla_Firefox.pngSUSnSEIS.png
Entry  Fri Aug 30 14:31:57 2013, Steve, Update, General, cleaning up MC2areaCP.jpg1Y1areaCleanedUp.jpgETMY_NPROmoved.jpg
Entry  Mon Sep 2 15:22:57 2013, Jenne, Update, PSL, PMC relocked 
    Reply  Mon Sep 2 16:46:32 2013, Jenne, Update, Electronics, RF distribution box is on the bench 
    Reply  Mon Sep 2 18:06:21 2013, Jenne, Update, Electronics, RF distribution box: 110 MHz LO options RF_distribution_box_proposed_modifications.pdf0902131751.jpg0902131751a.jpg
    Reply  Tue Sep 3 14:23:21 2013, Steve, Update, PEM, earthquakes EQm6&5.png
    Reply  Tue Sep 3 21:08:13 2013, Jenne, Update, Electronics, RF distribution box: 110 MHz LO options 
    Reply  Wed Sep 4 16:06:40 2013, Jenne, Update, Electronics, RF distribution box: Reinstalled 
Entry  Wed Sep 4 16:08:22 2013, manasa, Update, SUS, MC2 tickler turned OFF 
Entry  Wed Sep 4 17:22:09 2013, Jenne, Update, LSC, Demod phases for RFPDs 
    Reply  Wed Sep 4 20:39:23 2013, rana, Update, SUS, MC2 tickler turned OFF 
Entry  Wed Sep 4 20:47:15 2013, manasa, Update, LSC, Calibrated in-loop MICH noise MICH_noise.pdf
    Reply  Wed Sep 4 21:44:54 2013, Not Jenne, Update, Electronics, RF distribution box: Reinstalled 
    Reply  Wed Sep 4 22:14:35 2013, Jenne, Update, SUS, MC2 tickler turned OFF 
    Reply  Thu Sep 5 00:40:33 2013, rana, Update, SUS, MC2 tickler turned OFF 
Entry  Thu Sep 5 01:55:29 2013, Jenne, Update, LSC, LSC model upated to have AS110 channels, violin filter triggering 
Entry  Thu Sep 5 10:28:17 2013, Steve, Update, SUS, PRM side  craneguywashere.png
    Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
    Reply  Thu Sep 5 11:19:33 2013, Jenne, Update, SUS, PRM side  
Entry  Thu Sep 5 15:18:41 2013, Jenne, Update, LSC, Free swinging DRMI power buildups DRMI_free_swing_power_buildups.pdf
Entry  Thu Sep 5 21:07:09 2013, Jenne, Update, LSC, Started work on logic for triggering 
    Reply  Fri Sep 6 09:27:10 2013, Steve, Update, VAC, 31 days after pumpdown day31vac.png
Entry  Fri Sep 6 23:01:08 2013, Koji, Update, LSC, Stable DRMI lock was recovered from the impact on the RF system modification DRMI.pngSensMat_PRMI_1000cts_580Hz_2013-08-26_235635.pngSensMat_PRMI_1000cts_580Hz_2013-09-06_201137.png
    Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 
Entry  Mon Sep 9 20:46:28 2013, Masayuki, Update, LSC, MICH calbration 
    Reply  Tue Sep 10 09:18:22 2013, Steve, Update, VAC, dry pump is getting loud 
    Reply  Tue Sep 10 15:43:01 2013, Steve, Update, VAC, TP3' dry pump is replaced 
    Reply  Tue Sep 10 17:35:50 2013, Masayuki, Manasa, Update, LSC, MICH calbration MICH_calib_loops.pngOLTF_MICHDC.pngMICH_DC_resp.pngMICH_RF_resp.pngMICH_free_noise.png
Entry  Wed Sep 11 17:35:38 2013, Jenne, Update, LSC, ALS requirement ArmLinewidthComparison.pngLinewidthComparison.png
Entry  Thu Sep 12 01:06:09 2013, Jenne, Update, ASC, SRCL ASS implemented 
    Reply  Thu Sep 12 23:36:25 2013, Masayuki, Update, LSC, MICH calbration BSsus.PNGITMXsus.PNGITMY.PNGfree_running.PNG
    Reply  Fri Sep 13 19:22:01 2013, Masayuki, Update, LSC, MICH calbration noise.PNG
    Reply  Mon Sep 16 10:57:11 2013, Steve, Update, VAC, RGA scan at day 41 pd76m41dRGA.pngpd76m41d.png
Entry  Mon Sep 16 13:11:15 2013, Evan, Update, Computer Scripts / Programs, Comsol 4.3b upgrade 
    Reply  Mon Sep 16 14:11:47 2013, rana, Update, LSC, MICH calbration Screen_Shot_2013-09-16_at_2.10.31_PM.pngScreen_Shot_2013-09-16_at_2.18.47_PM.png
    Reply  Tue Sep 17 00:50:42 2013, Masayuki, Update, LSC, MICH calbration noise.PNG
Entry  Tue Sep 17 18:44:29 2013, Masayuki, Update, LSC, LSC calibration screen calibration_screen.png
Entry  Wed Sep 18 11:29:43 2013, manasa, Update, CDS, Dataviewer cannot connect to fb CDS_FE.png
    Reply  Wed Sep 18 11:52:53 2013, Jamie, Update, CDS, Dataviewer cannot connect to fb 
    Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
ELOG V3.1.3-