40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 214 of 344  Not logged in ELOG logo
    Reply  Tue Mar 30 06:37:32 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum rc.png
Some more words about the RFAM: I noticed that there was an excess RFAM by unlocking the RC and just looking at the RF out with the 50 Ohm input of the
scope. It was ~100 mVp-p! In the end our method to minimize the AM was not so sensible - we aligned the waveplate before the EOM so as to minimize the
p-pol light transmitted by the PBS cube just ahead of the AOM. At first, this did not minimize the RFAM. But after I got angry at the bad plastic mounting
    Reply  Sat Apr 3 11:35:47 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum 
The units on this plot are completely bogus - we know that the thermal noise from the resonant part of the circuit is just V = sqrt(4*k*T*Z)
~ 3nV/rHz. Then the gain of the MAX4107 stage is 10. The output resistor is 50 Ohms, which forms a divide by 2 with the input impedance of the spectrum
analyzer and so the bump in the dark noise should only be 15 nV/rHz and not microVolts.

    Reply  Sat Apr 3 16:07:40 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum 2010-03-29_FSS_PD_shotnoise_and_darknoise.png
 I was aware of a problem on those units since I acquired the data. Then it wasn't totally clear to me which were the units of the data as downloaded
from the Agilent 4395A, and, in part, still isn't.
It's clear that the data was in units of spectrum, an not spectral density: in between the two there is a division by the bandwidth (100KHz, in
    Reply  Wed Mar 31 15:31:53 2010, steve, Update, PSL, Reference Cavity RF PD base upgraded brspdbs.JPG


    
        
            Quote:
        
        
            
            Some more words about the RFAM: I noticed that there was an excess RFAM by unlocking the RC and just looking at the
Entry  Wed Aug 26 19:58:14 2009, Rana, Alberto, Update, PSL, Reference Cavity Temperature Control: MINCO PID removed rc.png
Summary: This afternoon we managed to get the temperature control of the reference cavity working again.
We bypassed the MINCO PID by connecting the temperature box error signal directly into EPICS.
We couldn't configure the PID so that it worked with the modified temperature box so we decided to just avoid using it.
    Reply  Thu Aug 27 13:42:08 2009, rana, Summary, PSL, Reference Cavity Temperature Control: psl.db changes 
I made the changes to the psl.db to handle the new Temperature box hardware. The
calibrations (EGUF/EGUL) are just copied directly from the LHO .db file (I have rsync'd their entire target area to here).
allegra:c1psl>diff psl.db~ psl.db
Entry  Wed Oct 1 23:21:03 2008, Yoichi, Configuration, PSL, Reference cavity reflection camera 
I re-centered the reference cavity reflection camera, which has been mis-aligned for a while.
I also tweaked an input steering mirror to make the alignment better. This resulted in the increase of the transmission PD voltage
from 8V to 9V.
Entry  Mon Aug 17 02:05:49 2009, Yoichi,rana, Update, PSL, Reference cavity reflection looks bad P8170113.JPGUntitled.png
Rana, Yoichi

It has been a well known fact that the reference cavity reflection beam looks ugly.
    Reply  Mon Aug 17 04:16:13 2009, Yoichi, Update, PSL, Reference cavity reflection looks bad 
[quote]Rana, Yoichi
- We also moved the Refcav reflection camera to look at the leakage through a reflection steering mirror so that there's less chance of distortion. There
was previously a W1 window in there as a pickofff. Also changed the camera to autogain so that we can see something.
Entry  Fri Nov 14 19:20:42 2008, Yoichi, Update, PSL, Reference cavity ring down RingDown.png
Thanks to Bob making the high-voltage BNC cables for the HV pulse generator, I was able to operate the EOM in front of
the reference cavity.
    Reply  Fri Nov 14 20:35:47 2008, rana, Update, PSL, Reference cavity ring down 
To make the DEI pulser make a fast pulse on the EO shutter EOMs, we had to make sure:

1) the cable had a high voltage rated dielectric. cheap dielectrics show the 'corona'
    Reply  Fri Nov 14 22:40:51 2008, Yoichi, Update, PSL, Reference cavity ring down 
[quote]
To make the DEI pulser make a fast pulse on the EO shutter EOMs, we had to make sure:
    Reply  Mon Nov 17 15:07:06 2008, Yoichi, Update, PSL, Reference cavity ring down Fit.png
I used MATLAB's system identification tool box to estimate the response of the reference cavity, i.e. cavity pole.
What I did was basically to estimate a model of the RC using the time series of the measured input and output power.
Entry  Fri Dec 12 22:51:23 2008, Yoichi, Update, PSL, Reference cavity ring down measurement again RC-Ringdown.png
Bob made new HV-cables with HV compatible coaxes. The coax cable is rated for 2kV, which was as high as Bob
could found. I used it with 3kV hoping it was ok.
I also put a series resistor to the pockels cell to tame down the ripples I saw in elog:1136.
    Reply  Tue Dec 16 19:06:01 2008, Yoichi, Update, PSL, Reference cavity ring down repeated many times RC_Ringdown_Estimates.pngCavity_Pole_Histogram.png
Today, I repeated the reference cavity ring down measurement many times to see how much the results vary.

I repeated the ring down for 20 times and the first attachment shows the comparison of the measured and estimated cavity transmission power.
Entry  Wed May 12 02:35:13 2010, Koji, Rana, Kiwamu, Update, Green Locking, Reflection from ETM and ITM ! 
We succeeded in getting the reflected green beam from both ITMY and ETMY.
After we did several things on the end table, we eventually could observe these reflections.
Now the spot size of the reflection from ITMY is still big ( more than 1 cm ), so tomorrow modematching to the 40m cavity is going to be improved
    Reply  Wed May 12 03:52:54 2010, Koji, Update, Green Locking, Reflection from ETM and ITM ! 
I could not understand this operation. Can you explain this a bit more?
It sounds different from the standard procedure to adjust the Faraday:
1) Get Max transmittion by rotating PBS_in and PBS_out.
    Reply  Wed May 12 09:16:29 2010, steve, Update, Green Locking, Reflection from ETM and ITM ! 
 
 Now I know why Rana was wearing his bright green pants yesterday. It is nice to see the green beam in the 40m IFO again. It calls for celebration!
I stopped AWG 1Hz drive of ITMYs (south-arm) I still see unblocked beams at the ETMYs table. We have plenty of cleaned razor beam traps to be used.
    Reply  Fri May 14 08:18:46 2010, steve, Update, Green Locking, Reflection from ETM and ITM ! itmx1hzos.jpg
I stopped AWG  1 Hz drive to ITMYs. ITMXe was also driven or oscillating. ITMXe damping was off, so I turned it on. It did not effect it's oscillation
Entry  Wed May 14 13:14:19 2008, Andrey, Summary, Computers, Reflective Memory Network is restored 

[COLOR=blue]Reflective Memory Network is restored, all watchdogs and oplevs are returned to the "enabled" state.[/COLOR]
Entry  Mon Dec 7 19:02:22 2009, Mott, Update, General, Reflectivity Measurements  Y1-45P_R.pngY1-45S_R.pngY1-50CC_R.png
I have made some measurements of the R value for some coatings we are interested in.  The plots have statistical error bars from repeated measurements,
but I would suspect that these do not dominate the noise, and would guess these should be trusted to plus or minus 5% or so.  They still should give
some indication of how useful these coatings will be for the green light.  I plan to measure for the ITM as soon as possible, but with the venting
Entry  Sat Apr 25 00:45:31 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed 
The temperature of the cryopump head is monitored by a photo switch looking at an aluminum foil reflector attached to the needle of the temperature gauge.
If the needle moves out of the 14K position, the photo switch will be triggered to close the cryopump gate valve.
However, this photo switch system has been touchy.
    Reply  Sat Apr 25 02:54:25 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed 
[quote]The temperature of the cryopump head is monitored by a photo switch looking at an aluminum foil reflector attached to the needle of the temperature
gauge.
If the needle moves out of the 14K position, the photo switch will be triggered to close the cryopump gate valve.
Entry  Wed Feb 6 16:50:47 2008, josephb, Configuration, Cameras, Regions of Interest and max frame rate 
The Snap code has once again been modified such that setting the -l option to 0 will take images as fast as possible.  Also, the -H and -W options set the
height and width, while in principle the -Y and -X options set the position in pixels of the top edge and left edge of the image.  It also seems possible
to set these values such that the saved image wraps around.  I'll be adding some command checking so that the user can't do this in the near future.
    Reply  Wed Feb 6 19:39:11 2008, rana, Configuration, Cameras, Regions of Interest and max frame rate 
We really need to look into making the 40m CDS network have an all GigE backbone so that we can have cooler cameras as well as collect multiple datastreams...
Entry  Tue Aug 2 10:53:03 2011, Jenne, Omnistructure, SAFETY, Regular door out of service. Use Control Room Door only!! 
The hazardous waste people are moving chemicals around outside our door, and have roped off our regular front door. 
Please go around, and use the control
room door to enter and exit.  It is currently unlocked, although I'll lock up when I leave for LIGOX.
Entry  Fri Apr 10 17:05:45 2015, ericq, Update, LSC, Relative ETM calibration (Rough MC2 calibration) quickCal.png
I did a quick measurement get an idea of the ETM actuator calibration, relative to the ITMs. This will still hold if/when we revisit the ITM calibration
via the Michelson. 

For the test masses, I locked the arms individually using MC2 as the actuator, and took transfer functions from the SUS-[OPTIC]_LSC_EXC
    Reply  Fri Apr 10 18:39:39 2015, ericq, Update, LSC, Relative ETM calibration (Rough MC2 calibration) betterCal.png
I didn't verify that the loop gain was low enough at the excitation frequencies. 

I put a 1kHz ELP in both arm servos, and got cleaner data for both. The ETM numbers are pretty much consistent with the previously posted
Entry  Tue May 12 18:16:17 2020, gautam, Update, LSC, Relative importance of losses in the arm and PRC armLossVSPRCloss.pdf
Attachment #1 is meant to show that
having a T=500ppm PR2 optic will not be the dominant contributor to the achievable recycling gain. Nevertheless, I think we should change this optic to
start with. Here, I assume:
    Reply  Tue May 12 20:16:31 2020, Koji, Update, LSC, Relative importance of losses in the arm and PRC 
Is \eta_A the roundtrip loss for an arm?

Thinking about the PRG=10 you saw:
- What's the current PR2/3 AR? 100ppm? 300ppm? The beam double-passes them. So (AR loss)x4 is added.
    Reply  Tue May 12 22:47:49 2020, gautam, Update, LSC, Relative importance of losses in the arm and PRC 
Yes, \eta_A is the (average) round-trip loss for an arm cavity. I'd estimate this is ~100ppm currently. I edited the original elog to fill in this
omission.

The RC mirror specs require some guesswork - the available specs for the Laseroptik mirrors (PR3) are for a 48 degree angle of incidence, and
Entry  Tue Dec 30 17:26:23 2014, rana, Update, PSL, Relaxation Osc and the NPRO Noise eater NE_Mephisto.png
I wonder if the variable bump around 100 kHz can be something about the NPRO and if the bump we see is the closed loop response due to the Noise Eater.
    Reply  Fri Mar 13 23:49:28 2015, rana, Update, PSL, Relaxation Osc and the NPRO Noise eater 
Another thought about the mystery PCDRIVE noise: we've been thinking that it could be some slow death inside the NPRO, but it might also be a broken
and intermittent thing in the MC servo or MC REFL PD.

Another possibility is that its frequency noise in the old oscillator used to drive the pre-PMC EOM (which is the Pockel Cell for the FSS). To
    Reply  Wed Jun 13 01:02:40 2018, gautam, Update, LSC, Reliable and repeatable 1f DRMI locking 
[koji, gautam]

With Koji's help, I got repeatable and reliable DRMI locking going again tonight - this is with the AS path optics for the spectroscopy measurement
in place, although the AUX laser remained shuttered tonight. Results + spectra tomorrow, but here's what I did:
    Reply  Thu Jun 14 18:09:24 2018, gautam, Update, LSC, Reliable and repeatable 1f DRMI locking DRMI1f_June14.pdf
I finally analyzed the sensing measurement I ran on Tuesday evening. Sensing responses for the DRMI DOFs seems consistent with what I measured in October 2017, although the relative phasing of the DoFs in the sensing PDs has changed significantly.
For what it's worth, my Finesse simulation is here. 
    Reply  Thu Oct 20 19:47:24 2022, Tega, Update, CDS, Relocate front-ends to Rack 1X7 IMG_20221020_193623269.jpgIMG_20221020_193637034.jpgiop_status_20221020.pngiop_status_20221020_restart_models.pngc1ioo_shm_glitch.png
We mounted chiara, all front-end machines and switches in rack 1x7; reconnected power, dolphin, onestop and timing cables; and restarted the front-ends.
Attachments 1 & 2 show the front and rear of rack 1X7. We are going to continue the clean up work tomorrow.

 
    Reply  Mon May 9 18:49:05 2022, Tega, Update, BHD, Relocate green TRX and TRY PDs/cams/optics from PSL table to BS table IMG_20220509_184439943.jpgIMG_20220509_184154722.jpg
[Paco, Tega]

Started work on the relocating the green transmission optics, cameras and PDs. Before removing the any of the optics, we checked and confirmed
that the PDs and Cams are indeed connected to the GRN TRX/Y medm channels. Then added labels to the cables before moving them.
    Reply  Tue May 10 15:46:38 2022, JC, Update, BHD, Relocate green TRX and TRY components from PSL table to BS table IMG_0741.jpegIMG_0753.jpeg
[JC, Tega]

Tega and I cleaned up the BS OPLEV Table and took out a couple of mirrors and an extra PD. The PD which was removed is "IP-POS - X/Y  Reversed".
In addition to this, the cable is zip-tied to the others located on the outside of the table in case this is required later on. 
Entry  Tue May 10 03:44:59 2016, ericq, Update, LSC, Relocked 2016-05-10_DARMcoherence.pdf
ALSX noise is solidly within past acceptable performance levels. The DRFPMI was locked on four out of six attempts. 

Some housekeeping was done:


PMC aligned
Static alignment voltages of X end PZT mirrors offloaded by turning mount screws
Rough comissioning
Entry  Fri Aug 19 19:08:40 2011, Jenny, Update, PSL, Relocking NPRO to reference cavity.  
I am trying again to measure a temperature step response on the reference cavity on the PSL table.
I have been working to relock the NPRO to the cavity. I unblocked the laser beam, reassembled the setup described in my previous elog entry: 5202. I then did the following:
    Reply  Fri Aug 19 23:41:20 2011, Jenny, Update, PSL, Relocking NPRO to reference cavity.  


    
        
            Quote:
        
        
            

           I am trying again to measure a temperature step response on the reference cavity on the PSL table.
Entry  Mon Sep 19 20:56:36 2011, Paul, Summary, SUS, Remaining SRM and ITMY OSEMs calibrations SRM_PITCH_calib_curve.pngSRM_YAW_calib_curve.pngITMY_PITCH_calib_curve.pngITMY_YAW_calib_curve.png
 
I've now taken data for the pitch and yaw calibrations for the OSEMs of SRM and ITMY. Until such time as I know what the calibrated oplev noise
spectra are like, I'm leaving the servo gains at zero.
Entry  Fri Dec 17 12:32:35 2021, Koji, Update, SUS, Remaining task for 2021 
Anything else? Feel free to edit this entry.

- SUS: AS1 hanging

- SUS: PR3/SR2/LO2 3/4" thick optic hanging
    Reply  Fri Dec 17 19:19:42 2021, Koji, Update, SUS, Remaining task for 2021 PXL_20211218_030145356.MP.jpg
I had the fear that any mistake in the electronics chain could have been the show stopper.

So I quickly checked the signal assignments for the ADC and DAC chains.

I had initial confusion (see below), but it was confirmed that the electronics chains (at least for LO1)
    Reply  Sun Dec 19 07:52:51 2021, Anchal, Update, SUS, Remaining task for 2021 
The I/O chassis reassigns the ADC and DAC indices on every power cycle. When we moved it, it must have changed it from the order we had. We were aware
of this fact and decided to reconnect the I/O chassis to AA/AI to relect the correct order. We forgot to do that but this is not an error, it is expected
behavior and can be solved easily.
    Reply  Wed Dec 22 18:16:23 2021, Koji, Update, SUS, Remaining task for 2021 ITMX_2016_07_21.jpgScreen_Shot_2021-12-22_at_18.03.42.png
The in-vacuum installation team has reported that the side OSEMs of ITMX and LO1 are going to be interfering if place LO1 at the planned location.
I confirmed that ITMX has the side magnet on the other side (Attachment 1 ITMX photo taken on 2016/7/21). So we can do this swap.

The ITMX side OSEM is sticking out most. By doing this operation, we will recover most of the space between the ITMX and LO1. (Attachment 2)
Entry  Fri Oct 9 03:53:56 2009, Jenne, Update, Adaptive Filtering, Remaking the ASS 
The c1ass computer, which is now used for the OAF system, has many remnants from the days when it was actually used as an ASS.  These PIT and YAW
filter banks and other things were taking up a lot of unnecessary space, so I deleted them in the ass.mdl file.  These files are all backed up, so
we can always revert back to an older version when we want some Alignment Stabilization again someday.  I then did a make ass, following the instructions
Entry  Thu Sep 3 00:45:25 2015, Ignacio, Update, IOO, Remeasured MC2 to MCL TF + Improved subtraction performance 8x
Today, I remeasured the transfer function for MC2 to MCL in order to improve the subtraction performance for MCL and to
quantify just how precisely it needs to be. 

Here is the 
Entry  Fri Apr 26 20:43:51 2013, Jenne, Update, LSC, Remeasuring the Schnupp asymmetry 
[Jenne, Annalisa, with guidance from Koji]
We took data to remeasure the Schnupp asymmetry, using the Valera method that Jamie described in elog
4821. 
    Reply  Fri May 3 17:32:59 2013, Jenne, Update, LSC, Remeasuring the Schnupp asymmetry Xarm_SchnuppData_April2013.pngYarm_SchnuppData_April2013.png
I have looked at / analyzed the Schnupp data that Annalisa and I took last week, as well as some more Yarm data that I took this week.
I only have one set of Xarm data, but 3 sets of Yarm data.  I had intended to do careful error analysis of the data, but from the 3 sets of
Yarm data, the variance in the answer I get using any one of the Yarm sets is much larger than the error in a single measurement.
ELOG V3.1.3-