40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 212 of 344  Not logged in ELOG logo
   +  Reply  Sun Oct 6 22:52:09 2013, Jenne, Rana, Update, IOO, input beam to PMC aligned again pmcr.png
   +  Reply  Sun Oct 6 23:43:07 2013, rana, Update, IOO, WFS debugging 
   +  Reply  Mon Oct 7 10:51:18 2013, Steve, Update, SUS, Replaced the laser for Optical Lever of ETMY  ETMXoplevETMY.pngoplevSettings.png
Entry  Mon Oct 7 13:55:26 2013, Jenne, Update, LSC, Arms locked in IR for many hours BothArmsLocked3Days_7Oct2013.png
   +  Reply  Mon Oct 7 14:15:10 2013, Jenne, Update, LSC, PRMI alignment is also excellent PRMI_excellent_alignment_7Oct2013.png
Entry  Mon Oct 7 14:24:10 2013, Jenne, Update, LSC, PRMI Config settings re-saved 
Entry  Mon Oct 7 18:36:39 2013, Jenne, Update, LSC, Sensing Matrix scripts updated 
   +  Reply  Tue Oct 8 08:58:16 2013, Steve, Update, SUS, Oplev power spectrums ITMoplevServoValues.pngoplevPSpectrums_darkPRM.pngBSoplevServoValues.png
Entry  Tue Oct 8 11:29:30 2013, Steve, Update, PEM, no Janitor day today dirtyVacpump.jpg
Entry  Tue Oct 8 16:56:38 2013, Jenne, Update, LSC, LSC model sensing matrix upgrades in progress 
   +  Reply  Wed Oct 9 11:48:10 2013, Steve, Update, VAC, RGA scan at day 65 scanRGApd76m65d.pngpd76m65d.png
Entry  Wed Oct 9 15:00:48 2013, Steve, Update, PEM, freshmen tour freshmen2013.jpg
   +  Reply  Wed Oct 9 17:27:35 2013, Jenne, Update, LSC, LSC model sensing matrix upgrades  
   +  Reply  Wed Oct 9 18:45:17 2013, Masayuki, Update, Green Locking, ALS down script modified 
   +  Reply  Wed Oct 9 22:05:55 2013, Jenne, Update, LSC, New lockin / sensing matrix screens 
Entry  Wed Oct 9 22:58:34 2013, Manasa, Update, Green Locking, ALS stabilization ALS_XARM_OLTF.pdf
Entry  Thu Oct 10 08:25:07 2013, Steve, Update, safety, Chris received safety training 
   +  Reply  Thu Oct 10 11:30:15 2013, Steve, Update, SUS, Oplev power spectrums: PIT-YAW PitYawOLetmXY.png
Entry  Thu Oct 10 11:46:43 2013, Jenne, Update, SUS, ITMY OpLev Noise ITMY_OpLev_Noise.png
Entry  Fri Oct 11 00:37:21 2013, Masayuki, Update, Green Locking, Y-arm ALS  OLTF.pdfERR.pdf
Entry  Fri Oct 11 00:37:23 2013, manasa, Update, Green Locking, X arm green locking modes MON4_1065505017.bmpMON4_1065504975.bmp
   +  Reply  Fri Oct 11 17:37:08 2013, Jenne, Update, LSC, New lockin / sensing matrix screens 
Entry  Fri Oct 11 20:30:08 2013, Masayuki, Update, SUS, Centering of Oplev of ETMY Oplev_centering.png
   +  Reply  Sun Oct 13 13:29:09 2013, rana, Update, LSC, New lockin / sensing matrix screens 
   +  Reply  Mon Oct 14 17:40:15 2013, Jenne, Update, LSC, New lockin / sensing matrix screens 
   +  Reply  Mon Oct 14 17:51:40 2013, Jenne, Update, IOO, input beam to PMC drifted again 
   +  Reply  Mon Oct 14 21:12:35 2013, Jenne, Update, LSC, New lockin / sensing matrix screens 
   +  Reply  Tue Oct 15 01:39:07 2013, Masayuki, Update, Green Locking, Y-arm ALS  PDHinloop.pdfALSinloop.pdf
   +  Reply  Tue Oct 15 15:25:13 2013, Steve, Update, SUS, Oplev power spectrums bandwidths BW0.01oplevPS.pngoplevPSetmXYclosed.png
Entry  Wed Oct 16 02:08:05 2013, Masayuki, Update, Green Locking, Script for scan cavity. scan-cavity.pngScan_ARMs.png
Entry  Wed Oct 16 02:27:56 2013, Jenne, Update, LSC, PRMI + 2 arm attempt PRCL_OLTF_PRMIir_XARMgreen_16Oct2013.pdfMICH_OLTF_PRMIir_XARMgreen_16Oct2013.pdfTimeSeries_PRMI_2arms_16Oct2013.png
   +  Reply  Wed Oct 16 02:39:24 2013, rana, Update, LSC, PRMI + 2 arm attempt 
   +  Reply  Wed Oct 16 03:04:37 2013, Jenne, Update, LSC, New lockin / sensing matrix model parts 
   +  Reply  Wed Oct 16 10:32:40 2013, Steve, Update, SUS, Flowbench effect on oplev error signals FlowBenchOnOff.png
   +  Reply  Wed Oct 16 17:34:28 2013, Jenne, Update, LSC, PRMI + 2 arm attempt TimeSeries_PRMI_Xarm_16Oct2013.png
Entry  Wed Oct 16 19:19:14 2013, Masayuki, Update, Green Locking, End PDH 60 Hz comb noise in YARM comb_noise.pdf
Entry  Thu Oct 17 13:26:13 2013, Jenne, Update, ASC, POP QPD realigned 
   +  Reply  Thu Oct 17 13:40:55 2013, Jenne, Update, LSC, New lockin / sensing matrix frequencies All_REFL_PRMI_17Oct2013.pdf
Entry  Thu Oct 17 18:29:28 2013, Koji, Update, LSC, PRMI+2arm attempt (not really yet) 
Entry  Thu Oct 17 22:38:25 2013, Masayuki, Update, PSL, PSL temperature changed in-loop.pdf
Entry  Fri Oct 18 08:12:08 2013, Steve, Update, PEM, 1000 days trends trend1000days.png
Entry  Fri Oct 18 15:18:49 2013, Steve, Update, PEM, particle count peak or ... PEMcount?.pngPemCountPeak?No.png
Entry  Mon Oct 21 09:46:12 2013, Steve, Update, PSL, Laser just turned on laserTurnedON.png
   +  Reply  Mon Oct 21 13:15:52 2013, Koji, Update, IOO, PMC aligned 
   +  Reply  Tue Oct 22 10:12:33 2013, Steve, Update, PEM, south arm AC intake duct checked PEM0.5micron60d.pngsouthArmIntakeNorth.jpgSouthArmMidIntakeWipe.jpg
Entry  Tue Oct 22 11:58:16 2013, Masayuki, Update, Green Locking, Yarm ALS PDH 
Entry  Tue Oct 22 18:55:55 2013, rana, Update, CDS, Workstation swap: Rosalba to ??? 
Entry  Wed Oct 23 00:05:17 2013, manasa, Update, SUS, Unstable Y arm ALS points to problems with ETMY suspension Y-SUS_All.png
   +  Reply  Wed Oct 23 00:13:30 2013, Masayuki, Update, Green Locking, FPMI with ALS arm stabilization ALSnoise1.pngALSnoise2.pngOLTF.png
   +  Reply  Wed Oct 23 09:17:33 2013, Steve, Update, SUS, ETMY sensors compared to ETMX ETMYglitching.pngOSEMsensorsETMY&X.pngETMYgettingKickedUp.pngdrive-damp.png
ELOG V3.1.3-