40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 210 of 344  Not logged in ELOG logo
ID Date Author Typeup Category Subject Text Attachments
  9068   Tue Aug 27 02:18:28 2013 JenneUpdateLSCPRMI, DRMI sensing matricesI have made a measurement of the PRMI and
the DRMI sensing matrices. 
Keiko pointed out to me in an email
 SensMatMeas_26Aug2013_withErrorBars.pngSensMatMeas_26Aug2013_DRMI_firstEverMeasurement.png 
  9070   Tue Aug 27 15:44:08 2013 manasaUpdateCDSIssues with ALS fixedI figured out the problem with ALS from
yesterday. While the model was just fine,
the medm screens were not checked if they
  
  9077   Wed Aug 28 00:41:23 2013 JenneUpdateCDSCDS svn commits not happeningsvn status update. asx, als and ioo
were found not committed. Not sure about who modified
  
  9078   Wed Aug 28 03:28:00 2013 JenneUpdateLSCPlaying with DRMI, some ASS automation prep[Rana, Jenne]
We did lots of poking around with
the DRMI tonight.  I should elog more
  
  9079   Wed Aug 28 05:21:58 2013 manasaUpdateCDSCDS svn commits not happeningI am responsible for missed
svn commits with als and asx. I have committed them.
  
  9080   Wed Aug 28 06:17:15 2013 manasaUpdateComputer Scripts / Programsalias for MATLAB2010Although Matlab 2013 has not been causing
any visible trouble so far, it takes a while
to startup.
  
  9081   Wed Aug 28 06:26:28 2013 manasaUpdateComputer Scripts / ProgramsASS req and snap files edited[From yesterday] ASS for X arm was behaving
slightly funny over the last couple of days.
ASS could not correct the BS misalignment.
  
  9082   Wed Aug 28 07:33:51 2013 manasaUpdateLSCMICH lockingI wanted to measure the OLTF of MICH.
What I did:
1. Ran LSC offsets script to zero
 MICH.pdf 
  9083   Wed Aug 28 11:15:02 2013 SteveUpdateGreen LockingXend green layout corrections

    

       
            
  
  9084   Wed Aug 28 11:23:41 2013 SteveUpdateVACcrane repair sheduled

    

       
            
  
  9085   Wed Aug 28 15:41:42 2013 SteveUpdateVACRGA scan at day 23 Valve configuration: Vacuum Normal
pd76-m-d23
 
 pd75md23.png 
  9088   Thu Aug 29 17:25:50 2013 JamieUpdateSUSSUS medm screen upgradeRana asked me to look at the SUS MEDM screen
upgrade situation, and provide an upgrade
prescription.  Unfortunately there not
  
  9090   Fri Aug 30 08:08:29 2013 steveUpdatesafetyfire horns-flashers tested OK 
 We had fire alarm tests
 and evacuation drills at 1:30pm yesterday.
  
  9091   Fri Aug 30 11:00:46 2013 ManasaUpdateGeneralSeries of earthquakesThere has been a series of earthquakes  Screenshot-Earthquakes_-_Mozilla_Firefox.pngSUSnSEIS.png 
  9092   Fri Aug 30 14:31:57 2013 SteveUpdateGeneralcleaning upI cleaned up around MC2 and 1Y1 area this
morning.
ETMY NPRO moved from the side to
 MC2areaCP.jpg1Y1areaCleanedUp.jpgETMY_NPROmoved.jpg 
  9094   Mon Sep 2 15:22:57 2013 JenneUpdatePSLPMC relocked The PMC was locked on an LG 10 mode
(or something like it), for at least the
last 8 hours.  I relocked it on the
  
  9095   Mon Sep 2 16:46:32 2013 JenneUpdateElectronicsRF distribution box is on the benchI have pulled the RF distribution box out
of the rack, so I can look at it, and modify
it to have 2 110 MHz spigots. I'm going to
  
  9096   Mon Sep 2 18:06:21 2013 JenneUpdateElectronicsRF distribution box: 110 MHz LO optionsAfter scrounging for parts, and opening
up the box, I have modified my proposal to
the following:
 RF_distribution_box_proposed_modifications.pdf0902131751.jpg0902131751a.jpg 
  9098   Tue Sep 3 14:23:21 2013 SteveUpdatePEM earthquakes ~Vancuver, Canada earthquakes: magnitude
6,  5  and more shaking
 
 EQm6&5.png 
  9099   Tue Sep 3 21:08:13 2013 JenneUpdateElectronicsRF distribution box: 110 MHz LO optionsThe RF distribution box is still on the
bench, so again, don't
  
  9101   Wed Sep 4 16:06:40 2013 JenneUpdateElectronicsRF distribution box: ReinstalledI have reinstalled the RF distribution
box, as well put in the AS110 demod board. 
I plugged everything back in, and turned
  
  9102   Wed Sep 4 16:08:22 2013 manasaUpdateSUSMC2 tickler turned OFF [Jenne, Manasa]
While we were trying to relock the
MC after Jenne put back the RF box, we found
  
  9103   Wed Sep 4 17:22:09 2013 JenneUpdateLSCDemod phases for RFPDsI checked the demod phases for AS55, POP110,
and all the REFL PDs. 
AS55:  I locked MICH, and shook
  
  9104   Wed Sep 4 20:39:23 2013 ranaUpdateSUSMC2 tickler turned OFF

    

       
            
  
  9105   Wed Sep 4 20:47:15 2013 manasaUpdateLSCCalibrated in-loop MICH noiseTo estimate in-loop MICH noise:
(a) Calibrate MICH_ERR:
1. Lock the arms for IR using POX11
 MICH_noise.pdf 
  9106   Wed Sep 4 21:44:54 2013 Not JenneUpdateElectronicsRF distribution box: ReinstalledTemporary fix for the switch: give a bit
of oil to the button
Permanent fix: buy better switches.
  
  9107   Wed Sep 4 22:14:35 2013 JenneUpdateSUSMC2 tickler turned OFF

    

       
            
  
  9108   Thu Sep 5 00:40:33 2013 ranaUpdateSUSMC2 tickler turned OFF 
 You're right - down turns it
on. Still, the fact that the same tickle
  
  9109   Thu Sep 5 01:55:29 2013 JenneUpdateLSCLSC model upated to have AS110 channels, violin filter triggeringI have
modified the c1lsc model so that I have access
to the AS110 channels in the triggering and
  
  9110   Thu Sep 5 10:28:17 2013 SteveUpdateSUSPRM side I think the crane repair guy accidentally 
stepped on the  BSC support beam.
PRM side is not coming down.
 craneguywashere.png 
  9111   Thu Sep 5 10:47:58 2013 SteveUpdateVACvertex crane folding issue 
 [Fred Goldbar, Mike Gerfen,
Dennis Coyne and Steve]
 5mmLess.jpg 
  9112   Thu Sep 5 11:19:33 2013 JenneUpdateSUSPRM side

    

       
            
  
  9113   Thu Sep 5 15:18:41 2013 JenneUpdateLSCFree swinging DRMI power buildupsI have the DRMI free swinging right now,
since it's not really locking.  Looking
at these time series in the attached pdf,
 DRMI_free_swing_power_buildups.pdf 
  9114   Thu Sep 5 21:07:09 2013 JenneUpdateLSCStarted work on logic for triggeringI want something like an "AND"
for the degree of freedom triggers. 
Koji and I talked through an idea, and I
  
  9115   Fri Sep 6 09:27:10 2013 SteveUpdateVAC31 days after pumpdown

    

       
            
 day31vac.png 
  9116   Fri Sep 6 23:01:08 2013 KojiUpdateLSCStable DRMI lock was recovered from the impact on the RF system modificationSummary
 DRMI.pngSensMat_PRMI_1000cts_580Hz_2013-08-26_235635.pngSensMat_PRMI_1000cts_580Hz_2013-09-06_201137.png 
  9117   Mon Sep 9 15:33:06 2013 SteveUpdateVACvertex crane repair is scheduled

    

       
            
  
  9118   Mon Sep 9 20:46:28 2013 MasayukiUpdateLSCMICH calbration[Manasa, Masayuki]
We took a bunch of measurements.
Transfer function and power spectrum using
  
  9119   Tue Sep 10 09:18:22 2013 SteveUpdateVACdry pump is getting loud 
 TP3 foreline's dry pump is
getting noisier and noisier.  Turbo
  
  9120   Tue Sep 10 15:43:01 2013 SteveUpdateVACTP3' dry pump is replaced

    

       
            
  
  9121   Tue Sep 10 17:35:50 2013 Masayuki, ManasaUpdateLSCMICH calbration

    

       
            
 MICH_calib_loops.pngOLTF_MICHDC.pngMICH_DC_resp.pngMICH_RF_resp.pngMICH_free_noise.png 
  9122   Wed Sep 11 17:35:38 2013 JenneUpdateLSCALS requirementI have done a quickie look at Optickle
to see how the linewidth of an arm cavity
changes versus the configuration. 
 ArmLinewidthComparison.pngLinewidthComparison.png 
  9126   Thu Sep 12 01:06:09 2013 JenneUpdateASCSRCL ASS implementedI have modified the ASS model to also have
an ASS for SRCL.  The input options
are POPDC, POP110, AS110.  I suppose
  
  9127   Thu Sep 12 23:36:25 2013 MasayukiUpdateLSCMICH calbrationFor Modelling of the OLTF, I measured the
response of the BS suspension. I used the
OSEM sensor for measurement. The attatchment1
 BSsus.PNGITMXsus.PNGITMY.PNGfree_running.PNG 
  9128   Fri Sep 13 19:22:01 2013 MasayukiUpdateLSCMICH calbration 
 I made sure the yesterday's
result was collect. I measured not only the
 noise.PNG 
  9129   Mon Sep 16 10:57:11 2013 SteveUpdateVACRGA scan at day 41

    

       
            
 pd76m41dRGA.pngpd76m41d.png 
  9130   Mon Sep 16 13:11:15 2013 EvanUpdateComputer Scripts / ProgramsComsol 4.3b upgradeComsol 4.3b is now installed under /cvs/cds/caltech/apps/linux64/COMSOL43b.
I've left the existing Comsol 4.2 installation
  
  9131   Mon Sep 16 14:11:47 2013 ranaUpdateLSCMICH calbration  There doesn't seem to be any
coherence among the different directions
of ground motion (as expected from seismic
 Screen_Shot_2013-09-16_at_2.10.31_PM.pngScreen_Shot_2013-09-16_at_2.18.47_PM.png 
  9134   Tue Sep 17 00:50:42 2013 MasayukiUpdateLSCMICH calbrationI found the bug in my calibration
code, and I fixed it.
 noise.PNG 
  9136   Tue Sep 17 18:44:29 2013 MasayukiUpdateLSCLSC calibration screenI update the LSC calibration screen. This
screen is for real time calibration of each
DOF with using error signal and control signal.
 calibration_screen.png 
ELOG V3.1.3-