40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 210 of 344  Not logged in ELOG logo
Entry  Thu Dec 15 11:47:43 2011, jamie, Update, CDS, RTS UPGRADE IN PROGRESS 
Entry  Tue Jun 21 21:17:16 2022, yuta, Update, BHD, RTS models for BHD added but PCIE error remaining Screenshot_2022-06-21_20-12-55_C1HPC.pngScreenshot_2022-06-21_20-14-56_C1SU2.pngScreenshot_2022-06-21_20-13-38_C1LSC.pngScreenshot_2022-06-21_20-34-44_RED.png
    Reply  Thu Dec 15 22:22:18 2011, jamie, Update, CDS, RTS upgrade aborted; restored to previous settings 
    Reply  Thu Jan 5 20:40:21 2012, Jamie, Update, CDS, RTS upgrade aborted; restored to previous settings; fb symmetricom card failing? 
Entry  Thu Jan 5 09:59:27 2012, Jamie, Update, CDS, RTS/RCG/DAQ UPGRADE TO COMMENCE 
Entry  Tue Oct 26 14:53:24 2021, Koji, Update, Electronics, Rack P_20211026_143814.jpg
    Reply  Tue Oct 18 15:24:48 2022, Tega, Update, CDS, Rack 1X7 work proposal 
    Reply  Mon Nov 8 18:42:38 2021, Koji, Summary, BHD, Rack Layout / Power Strips rack_plan.pdf
Entry  Tue Sep 10 16:10:40 2019, Chub, Update, , Rack Update 20190910_154018.jpg20190910_154006.jpg
Entry  Wed May 19 16:09:11 2010, josephb, Update, CDS, Racks to small for IO Chassis rails 
Entry  Mon Apr 19 16:27:13 2010, Aidan, Update, Green Locking, Raicol crystals arrived and we investigated them 
    Reply  Tue Apr 20 11:14:31 2010, Aidan, Update, Green Locking, Raicol crystals arrived and we investigated them 
    Reply  Tue Aug 25 01:27:09 2009, rana, Configuration, Computers, Raid update to Framebuilder (not quite) 
Entry  Fri Aug 14 10:39:50 2009, josephb, Configuration, Computers, Raid update to Framebuilder (specs) 
Entry  Fri Apr 18 16:48:13 2008, Andrey, Update, PEM, Rain collector of weather station DSC_0520--before.JPGDSC_0537--after.JPG
Entry  Mon May 11 15:15:12 2015, manasa, Update, General, Ran ASS for arms 
    Reply  Wed Oct 13 11:25:14 2021, Anchal, Summary, CDS, Ran c1sus2 models in martian CDS. All good! CDS_screens_running.png
Entry  Thu Nov 1 19:54:22 2007, Andrey Rodionov, Bureaucracy, Photos, Rana's photo DSC_0120.JPG
Entry  Tue Sep 22 16:52:36 2015, ericq, Summary, General, Random Notes 
Entry  Thu Dec 17 23:27:23 2009, rana, Update, PEM, Ranger Noise: sim w. Rai FET box as readout ranger.pdf
Entry  Fri Mar 7 00:47:54 2008, rana, Configuration, PEM, Ranger SS-1 ss1.pdf
Entry  Mon Aug 25 15:50:18 2008, rana, Summary, PEM, Ranger SS-1 
    Reply  Tue Dec 2 19:18:10 2008, rana, Summary, PEM, Ranger SS-1 
Entry  Fri Mar 21 23:15:11 2008, rana, Configuration, PEM, Ranger SS-1: New Setup 
Entry  Wed Dec 3 19:21:09 2008, rana, Configuration, PEM, Ranger move c.pdfwsnb.pdf
Entry  Fri Nov 6 16:27:15 2009, Jenne, Update, PEM, Ranger moved 
Entry  Fri Dec 4 18:54:03 2009, Jenne, Update, PEM, Ranger moved RangerSeismometer_SR560settings_4Dec2009.JPG
Entry  Sun Nov 2 21:37:22 2008, rana, Update, PEM, Ranger recovery 
Entry  Wed Jun 18 22:47:48 2014, ericq, Update, CDS, Raspberry pi added to martian network 
    Reply  Mon Feb 1 09:16:32 2016, Steve, Update, PEM, Rat got cut bingo.jpgbingo3.png
    Reply  Tue Aug 28 15:29:19 2018, Steve, Frogs, PEM, Rat is cut rat#2.png.png
    Reply  Tue Jan 5 15:48:16 2016, Steve, Update, safety, Rat trap locations  Control_Room.jpgEarmCESdoor.jpg1Y1.jpgMC2.jpgXarmMaglev.jpg
    Reply  Tue Jan 5 17:19:57 2016, rana, Update, safety, Rat trap locations  
    Reply  Tue Jan 5 09:48:52 2016, Steve, Update, PEM, Rat trap moved  
    Reply  Mon Dec 21 14:31:41 2015, Steve, Update, PEM, Rat traps set ratsNC.jpg
Entry  Sun Dec 20 23:23:54 2015, ericq, Update, ALARM, Rats. 
    Reply  Fri Oct 31 11:46:15 2014, manasa, Update, , Rattling HEPA : Eventually stops 
Entry  Mon Jun 11 16:08:58 2012, Jenne, Update, Environment, Rattling in the HEPA 
    Reply  Mon Jun 11 21:35:55 2012, Jenne, Update, Environment, Rattling in the HEPA 
Entry  Wed Jun 25 17:49:36 2014, Harry, Update, General, Razorblade Analysis Pt. 2 RazorbladeSetup.pdf
Entry  Fri Jun 20 18:33:53 2014, Harry, Update, General, Razorblade Beam Analysis Setup 
    Reply  Tue Jun 24 13:04:49 2014, Harry, Manasa, Update, General, Razorblade Beam Analysis Setup 
    Reply  Wed Jun 25 09:17:33 2014, Harry, Manasa, Update, General, Razorblade Beam Analysis Setup 
Entry  Wed Jun 25 09:16:52 2014, Harry, Update, General, Razorblade Measurements 40m.zip
Entry  Thu Aug 12 16:18:00 2010, Jenna, Update, Electronics, Rb clocks overnight rbcomp.pdf
    Reply  Wed Apr 27 17:38:01 2011, kiwamu, Update, Electronics, Re : AS55 demod board with new 90 deg splitter : healthy relativephase.pngIQamplitude.png
    Reply  Wed Jul 6 02:12:36 2011, kiwamu, Update, SUS, Re : More normalization of all sus controllers 
    Reply  Wed Jul 6 10:35:35 2011, Jamie, Update, SUS, Re : More normalization of all sus controllers 
    Reply  Wed Jul 6 15:32:32 2011, Jamie, Update, SUS, Re : More normalization of all sus controllers 
    Reply  Thu Jun 9 12:21:07 2011, kiwamu, Update, PSL, Re : PMC needs help Untitled.png
ELOG V3.1.3-