  12335   Mon Jul 25 20:37:46 2016 gautamUpdateGeneralETMX suspension - Side OSEM test[Lydia, gautam]

Summary: We
did some preliminary tests to check if at
 osem_test_2016_07_25.png 
  12340   Tue Jul 26 18:07:57 2016 gautamUpdateGeneralETMX suspension - Further OSEM TestsToday, we did the following:


Once again, inserted all
four face OSEMs till the sensor voltage readouts
 OSEM_spectra.pdf 
  12347   Thu Jul 28 13:49:44 2016 gautamUpdateGeneralETMX magnets re-reglued


 ETMX_sideMagnet.JPGETMX_sideMagnet_zoomed.JPG 
  12349   Thu Jul 28 17:48:17 2016 gautamUpdateGeneralETMY LR magnet broke offWhile ETMX magnets were curing, I wanted
to try and suspend ETMY in the endchamber,
put in the OSEMS and see if the magnets aligned
  
  12357   Fri Jul 29 20:12:54 2016 gautamUpdateSUSthird time - no luck[lydia, gautam]

Summary:
  
  12362   Wed Aug 3 00:15:39 2016 gautamUpdateSUSETMX suspended[lydia, steve, ericq, gautam]

Summary:
  
  12370   Thu Aug 4 03:14:39 2016 gautamUpdateSUSETMX suspended


  
  12377   Fri Aug 5 02:17:10 2016 gautamUpdateSUSETMX Ruby Wire Standoff Ready for GluingPart
1: Rotation of optic


 8x 
  12381   Fri Aug 5 18:21:28 2016 gautamUpdateSUSETMX Ruby Wire Standoff GLUED
The latest twist in this apparently
never-ending saga was that even though fine
pitch balancing was achieved, the wire was
 11x 
  12396   Wed Aug 10 19:37:08 2016 gautamUpdateElectronicsMic AmplifierIn order to help Praful do his huddle test,
I have temporarily arranged
for the outputs of the 3 channels he wants
  
  12401   Thu Aug 11 11:56:40 2016 gautamUpdateSUSETMY re-suspended


 pitchBalancingWithBias.PDF 
  12407   Sat Aug 13 18:25:22 2016 gautamUpdateCOCRC folding mirrors - Numerical reviewThis elog
is meant to summarize my numerical simulations
for looking into the effects of curvature
 PRX_consolidated.pdfSRX_consolidated.pdfGouy_PRC.pdfGouy_SRC.pdf 
  12411   Mon Aug 15 18:28:15 2016 gautamUpdateSUSAir-bake preparationI
assume that we are prepared to live with
the pitch bias situation of ETMY
 IMG_6816.JPG 
  12413   Tue Aug 16 11:51:43 2016 gautamUpdateCOCRC folding mirrors - Numerical reviewSummary of roundtable meeting yesterday
between EricG, EricQ, Koji and Gautam:

We identified two possible courses
 PRC_consolidated.pdfSRC_consolidated.pdfGouyPRC.pdfGouySRC.pdf 
  12414   Tue Aug 16 16:38:00 2016 gautamUpdateCOCRC folding mirrors - Numerical reviewHere are the results for case 2: (flat
PR3/SR3, for purpose of simulation, I've
used a concave mirror with RoC in the range
 PRC_consolidated.pdfSRC_consolidated.pdfGouyPRC.pdfGouySRC.pdf 
  12415   Tue Aug 16 21:54:27 2016 gautamUpdateSUSAir-bake - IN PROGRESSI
put in both ETMX and ETMY into the air-bake
oven at approximately 8.45pm tonight.
 IMG_3005.JPG 
  12417   Wed Aug 17 14:37:36 2016 gautamUpdateCOCRC folding mirrors - Numerical review


 PRG.pdf 
  12420   Wed Aug 17 23:00:57 2016 gautamUpdateSUSAir-bake of towersI just put in the following into the air
bake oven for a 12 hour, 70C bake:


ETMX and ETMY cages (with
 IMG_3006.JPG 
  12422   Thu Aug 18 14:14:20 2016 gautamUpdateSUSAir-bake of towers - finishedI took the two cages, wires and wire clamps
out this morning, back into the cleanroom
after their 12 hour 70C bake. 
  
  12424   Fri Aug 19 22:51:12 2016 gautamUpdateSUSETMs first-contactedI've applied first contact to both
the ETMs. They're now ready to be suspended.
I've also cut up some lengths of the
  
  12426   Sun Aug 21 16:23:05 2016 gautamUpdateSUSETMX suspended
ETMX has been successfully suspended
I've
used one of the new wire clamps, and also
the new suspension wire 
Because
 IMG_3018.JPG 
  12428   Mon Aug 22 13:06:11 2016 gautamUpdateSUSETMY suspendedToday morning, I suspended ETMY and made
the same checks dscribed below. The clamping
went smoothly, 5 in. lb. of torque seems
 IMG_3019.JPG 
  12430   Mon Aug 22 18:04:24 2016 gautamUpdateSUSETMY OSEMs inserted[Johannes, gautam]

We worked on trying to insert the
OSEMs in the optimal positions such that
  
  12434   Tue Aug 23 19:35:38 2016 gautamUpdateSUSETMY back in IFO[johannes,
gautam]
 10x 
  12443   Thu Aug 25 20:07:35 2016 gautamUpdateSUSOSEM issues - maybe resolved?[lydia, johannes,
gautam]

While
  
  12444   Thu Aug 25 21:11:43 2016 gautamUpdateSUSETMY back in IFOThere was
some confusion as to the order in which we
should go about trying to recover the Y arm.
 ETMY_BounceSpectra_25Aug2016.pdf 
  12445   Fri Aug 26 11:35:44 2016 gautamUpdateSUSETMY UL sensor problematic I've been noticing that the ETMY UL
sensor output has been erratic  over
the last few days. It seems to be jumping
 ETMY_BounceSpectra_26Aug2016.pdf41.png19.png 
  12448   Fri Aug 26 17:48:14 2016 gautamUpdateSUSbounce mode coupling reductionWe worked on reducing the bounce mode coupling
into the sensor signals today. After some
trial and error, essentially following the
 ETMY_BounceSpectra_26Aug2016_1.pdf 
  12449   Sun Aug 28 21:40:11 2016 gautamUpdateSUSETMY UL sensor problematic I wanted to observe the UL coil for any
excursions over the weekend. Looking at the
2 day trend, something is definitely wrong.
 ETMY_UL_problematic.png 
  12450   Mon Aug 29 09:37:05 2016 gautamUpdateSUSETMY UL sensor problematic It looks like the problem is indeed in
the Satellite box. Attachment #1 shows the
second trend for the last 12 hours (~930pm
 satelliteBox.png 
  12451   Mon Aug 29 14:42:06 2016 gautamUpdateSUSETMY Satellite box diagnosticsI opened up the ETMY satellite box to investigate
the glitches seen in the UL sensor output. 

Attachments #1 & 2: The
 IMG_6840.JPGIMG_6841.JPG 
  12455   Tue Aug 30 20:26:36 2016 gautamUpdateSUSITMY installed[gautam,
johannes, lydia]
 IMG_3052.JPGSRM_sensor_level_comp.pngETMY_BounceSpectra_30Aug2016.pdf 
  12457   Wed Aug 31 22:09:18 2016 gautamUpdateSUSY arm locked to Green Koji tweaked the alignment sliders till
we were able to get the Y arm locked to green
in a 00 mode, GTRY ~ 0.5 which is the prevent
  
  12458   Wed Aug 31 23:01:02 2016 gautamUpdateSUSthe chamber HEPA tents are backSome more numbers we found while working
in/around the chamber today:

  
  12466   Fri Sep 2 21:09:08 2016 gautamUpdateSUSY arm locked in air[johannes, lydia, gautam]


The Y arm has been locked
to IR in air using POY11 as an error signal 
 03.png56.png 
  12467   Fri Sep 2 21:15:53 2016 gautamUpdateSUSITMX and ETMX preemptive table levelingThe ITMX table had relaxed overnight into
a slightly misaligned state overnight - since
the ITMX table holds PR2 and hence can affect
  
  12471   Tue Sep 6 00:14:14 2016 gautamUpdateElectronicsSatellite Amplifier 




 osempdComparison.pdf 
  12474   Tue Sep 6 20:45:14 2016 gautamUpdateSUSX arm test masses back in chamber[Teng, Johannes,
Lydia, gautam]


The
 IMG_3137.JPGIMG_3143.JPGIMG_3142.JPGIMG_3148.JPG 
  12475   Tue Sep 6 20:52:42 2016 gautamUpdateSUSOSEM issues



The
 P9060254.JPG 
  12476   Wed Sep 7 17:23:26 2016 gautamUpdateSUSPRM LR fixed for now[johannes, gautam]


We took the heavy door
off in the morning with Steve's help
The
 IMG_3208.JPGIMG_3211.JPG 
  12478   Thu Sep 8 22:12:36 2016 gautamUpdateSUSX arm in place, locked to green, IR flashes visibleDetailed elog to follow but summary of
todays activities:


ITMX and ETMX are back
  
  12480   Fri Sep 9 17:50:02 2016 gautamUpdateSUSHeavy doors on BS-PRM, ETMY chambers[steve, teng, johannes, lydia, gautam]


we set about doing some
final checks on the Y arm while Johannes
  
  12526   Fri Sep 30 19:53:07 2016 gautamUpdateendtable upgradeX end IR pickoff fiber coupled[johannes, gautam]

Today we re-installed the fiber
coupler on the X-endtable to couple some
  
  12532   Wed Oct 5 16:28:10 2016 gautamUpdateendtable upgradeEX laser power monitor PD installedI installed a 10% BS to pick off some of
the light going to the IR fiber, and have
added a Thorlabs PDA55 PD to the EX table
  
  12533   Wed Oct 5 19:10:04 2016 gautamUpdateGeneralArm loss measurement review[ericq,gautam]

There are multiple methods by which
the arm loss can be measured, including,
  
  12534   Wed Oct 5 19:43:13 2016 gautamSummaryGeneralVent reviewThis elog is meant to review some of the
important changes made during the vent this
summer - please add to this if I've forgotten
  
  12542   Mon Oct 10 11:48:05 2016 gautamUpdateCDSPower-cycled c1susaux, realigned PMC, spots centered on WFS1 and WFS2[Koji, Gautam]

We did the following today morning:


I re-aligned the PMC -
  
  12545   Mon Oct 10 18:34:52 2016 gautamUpdateGeneralPZT OM MirrorsI did a quick survey of the drive electronics
for the PZT OM mirrors today. The hope is
that we can correct for the clipping observed
  
  12551   Tue Oct 11 13:30:49 2016 gautamUpdateSUSPRM LR problematic againPerhaps the problem is electrical? The
attached plot shows a downward trend for
the LR sensor output over the past 20 days
 PRM_LR_decay.png 
  12552   Wed Oct 12 13:34:28 2016 gautamUpdateSUSPRM LR problematic againLooks like what were PRM problems are now
seen in the SRM channels, while PRM itself
seems well behaved. This supports the hypothesis
 08.png 