40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 207 of 335
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
16714 Entries
Goto page
Previous
1
,
2
,
3
...
206
, 207,
208
...
333
,
334
,
335
Next
Sat Oct 1 22:53:49 2011, kiwamu, Summary, General, Recovery from the power shutdown : lockable
Mon Oct 3 08:38:21 2011, steve, Summary, VAC, Recovery from the power shutdown is completed
Thu Oct 13 21:40:59 2011, rana, Summary, VAC, Recovery from the power shutdown is completed
Sun Oct 2 13:45:13 2011, rana, Summary, General, Recovery from the power shutdown: apache / svn
Wed Mar 23 12:40:22 2011, Chief Recycling Officer, HowTo, Environment, Recycle stuff!
Thu Sep 4 01:28:32 2014, ericq, Update, LSC, Recycling cavity lengths
Thu Sep 4 10:10:23 2014, Koji, Update, LSC, Recycling cavity lengths
Thu Sep 4 18:16:20 2014, ericq, Update, LSC, Recycling cavity lengths
Thu Oct 8 21:32:59 2009, Koji, Summary, General, Recycling cavity loss
Fri Aug 14 02:57:46 2009, Clara, Update, PEM, Redo of the Huddle Test
Tue Jan 25 16:42:03 2022, Anchal, Summary, BHD, Reduced filter gains in all damped new SOS
Tue Aug 2 17:40:04 2011, Jenny, Update, PSL, Reducing beam intensity incident on photodiode
Fri Jul 25 19:57:18 2008, Jenne, Update, PSL, Ref Cav & PMC
Thu Aug 6 18:26:26 2009, Jenne, Update, PSL, Ref Cav and PMC aligned
Thu Aug 6 23:29:47 2009, Jenne, Update, PSL, Ref cav reflection PD is funky
Fri Aug 7 00:10:14 2009, rana, Update, PSL, Ref cav reflection PD is funky
Fri Aug 7 17:05:34 2009, Jenne, Update, PSL, Ref cav reflection PD is funky
Sat Jul 30 20:41:50 2011, rana, Update, PSL, RefCav Stabilization back on
Wed Oct 19 18:32:25 2016, rana, yinzi, Update, PSL, RefCav thermal control: heater is dead
Fri Sep 26 19:08:43 2008, rana, Configuration, PSL, Refcav Trans: PD + Camera + Dumps
Tue Aug 18 14:24:43 2009, Yoichi, Summary, PSL, Reference Cavity Inspection
Fri Jul 16 20:25:52 2010, Megan, Update, PSL, Reference Cavity Insulation
Fri Jul 16 23:53:27 2010, Rana, Update, PSL, Reference Cavity Insulation
Fri Jul 23 16:02:16 2010, Rana, Update, PSL, Reference Cavity Insulation
Fri Jul 23 21:14:29 2010, Rana, Update, PSL, Reference Cavity Insulation
Mon Mar 29 21:43:27 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum
Tue Mar 30 06:37:32 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum
Sat Apr 3 11:35:47 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum
Sat Apr 3 16:07:40 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum
Wed Mar 31 15:31:53 2010, steve, Update, PSL, Reference Cavity RF PD base upgraded
Wed Aug 26 19:58:14 2009, Rana, Alberto, Update, PSL, Reference Cavity Temperature Control: MINCO PID removed
Thu Aug 27 13:42:08 2009, rana, Summary, PSL, Reference Cavity Temperature Control: psl.db changes
Wed Oct 1 23:21:03 2008, Yoichi, Configuration, PSL, Reference cavity reflection camera
Mon Aug 17 02:05:49 2009, Yoichi,rana, Update, PSL, Reference cavity reflection looks bad
Mon Aug 17 04:16:13 2009, Yoichi, Update, PSL, Reference cavity reflection looks bad
Fri Nov 14 19:20:42 2008, Yoichi, Update, PSL, Reference cavity ring down
Fri Nov 14 20:35:47 2008, rana, Update, PSL, Reference cavity ring down
Fri Nov 14 22:40:51 2008, Yoichi, Update, PSL, Reference cavity ring down
Mon Nov 17 15:07:06 2008, Yoichi, Update, PSL, Reference cavity ring down
Fri Dec 12 22:51:23 2008, Yoichi, Update, PSL, Reference cavity ring down measurement again
Tue Dec 16 19:06:01 2008, Yoichi, Update, PSL, Reference cavity ring down repeated many times
Wed May 12 02:35:13 2010, Koji, Rana, Kiwamu, Update, Green Locking, Reflection from ETM and ITM !
Wed May 12 03:52:54 2010, Koji, Update, Green Locking, Reflection from ETM and ITM !
Wed May 12 09:16:29 2010, steve, Update, Green Locking, Reflection from ETM and ITM !
Fri May 14 08:18:46 2010, steve, Update, Green Locking, Reflection from ETM and ITM !
Wed May 14 13:14:19 2008, Andrey, Summary, Computers, Reflective Memory Network is restored
Mon Dec 7 19:02:22 2009, Mott, Update, General, Reflectivity Measurements
Sat Apr 25 00:45:31 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed
Sat Apr 25 02:54:25 2009, Yoichi, Configuration, VAC, Reflector for the cryopump temperature monitor changed
Wed Feb 6 16:50:47 2008, josephb, Configuration, Cameras, Regions of Interest and max frame rate
Goto page
Previous
1
,
2
,
3
...
206
, 207,
208
...
333
,
334
,
335
Next
ELOG V3.1.3-