ID Date Author Typeup Category Subject Text Attachments
  8948   Wed Jul 31 21:12:05 2013 manasaUpdateGeneralPump down called off[Koji, Manasa]
We missed to check that we had the green
  
  8949   Thu Aug 1 12:12:35 2013 gautamUpdateCDSNew model for endtable PZTsI have
made a new model for the endtable PZT servo,
and have put it in c1iscex. Model name is
 C1ASX_GDS_TP.png 
  8950   Thu Aug 1 13:09:17 2013 gautamUpdateCDSNew model for endtable PZTs-procedure 
 These
are roughly the steps I followed in setting
  
  8951   Thu Aug 1 15:06:59 2013 jamieUpdateCDSNew model for endtable PZTs

    

       
            
  
  8952   Thu Aug 1 15:28:44 2013 gautamUpdateCDSNew model for endtable PZTs-problem solved

    

       
            
  
  8953   Thu Aug 1 16:03:52 2013 SteveUpdateGeneralreopen BS & IOO

    

       
            
 IOOnorth.jpg 
  8954   Thu Aug 1 16:33:39 2013 SujanUpdatePEMGuralp2 seismometer installed at North side of POX table1)Power to the seismometers were turned
down,
2)Guralp2 was moved to North side
 IMG_1213.JPG 
  8955   Thu Aug 1 18:55:20 2013 Alex ColeUpdateElectronicsPreliminary Photodetector Frequency Reponse Measurements

    

       
            
 POX11.jpgPOX11fit.jpg 
  8956   Thu Aug 1 20:58:56 2013 gautamUpdateCDSNew model for endtable PZTs-MEDM Screens setup 
I
 MAIN_SCREEN.pdfMATRICES.pdfLOCKINS.pdfCONTROL_FILTERS.pdf 
  8957   Thu Aug 1 21:28:09 2013 gautamUpdateCDSSlow channels set-up in ALS The following
slow channels have been added and are now
  
  8958   Thu Aug 1 22:49:31 2013 manasaUpdateGeneralGreen status after PR3 flipping investigated[EricQ, Koji, Manasa]
We opened the BS chamber to check
the status of the green beams. The X green
  
  8959   Thu Aug 1 22:58:45 2013 CharlesUpdateISSCTN Servo - Explicit Requirement and Proposed Servo In PSL
elog 1270, Evan elucidated the explicit
requirements for the CTN ISS board. Essentially,
 CTN_Servo_TF_-_Proposed_v_Req.pngCTNServo_v3.fil 
  8960   Fri Aug 2 17:50:10 2013 JenneUpdateGeneralPR3 wedge angle adjusted[Jenne, Manasa, Koji]
Earlier today, we locked and aligned
both the X and Y arms. 
  
  8961   Fri Aug 2 21:59:36 2013 CharlesUpdateISSFinalized ISS Schematic (hopefully) Attached is the finalized schematic. The
general circuit topology should remain the
same from this point forward, although individual
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  8962   Fri Aug 2 22:51:10 2013 JenneUpdateGeneralAll vent tasks complete, just need oplev check[Manasa, Koji, Jenne]
We went into the BS and IOO chambers,
and aligned the green beams such that they
  
  8963   Mon Aug 5 10:50:48 2013 SteveUpdateVACRGA background RGA background at day 12 of this
vent . The maglev is pumping on the rga through
VM2
 v75bgMd12.png 
  8964   Mon Aug 5 11:53:45 2013 EvanUpdateISSCTN Servo - Explicit Requirement and Proposed ServoI goofed on the transfer function requirement
by not giving you the plant transfer function,
which looks to be about 0.014 V/V,  independent
  
  8965   Mon Aug 5 18:02:34 2013 manasaUpdateGeneralClose up list checked

    
    Center
  
  8966   Mon Aug 5 18:18:32 2013 gautamUpdateCDSChoosing LO Amplitudes and Frequencies In
order to decide what frequencies to dither
the 4 degrees of freedom (M1-pitch&yaw,
 GTR_Power_Spectrum.pdf 
  8968   Mon Aug 5 19:10:01 2013 KojiUpdateCDSChoosing LO Amplitudes and Frequencies - I suppose the green transmission paths
were thoroughly inspected and aligned in
prior to the measurement
  
  8969   Tue Aug 6 07:52:58 2013 manasaUpdateGeneralReady to pump downI did an alignment check of the IFO before
we start pumping down.
Arms were locked. PRM and SRM were
 MCspot_0806.pngOSEM_0806.pngOL_0806.pngQPD_0806.png 
  8970   Tue Aug 6 10:06:29 2013 SteveUpdateVACPumpdown is at 500Torr The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
 befPd.png 
  8972   Tue Aug 6 16:36:51 2013 gautamUpdateCDSChoosing LO Amplitudes and Frequencies-revisedI redid
the power spectrum measurement for the X-arm
green transmission after aligning the arm
 powerSpec0806.pdf 
  8973   Tue Aug 6 16:45:31 2013 SteveUpdateVACPumpdown is completed IFO  P1=1mT PSL shutter is opened
 
 8hrPd76.png1mT.png 
  8974   Tue Aug 6 19:53:15 2013 JenneUpdateLSCArms locked in IR, aligned. IFO at nominal power[Koji, Manasa, Jenne]
The Y arm was locked in IR, and we
saw flashing in the Xarm (Gautam had the
  
  8975   Wed Aug 7 10:09:30 2013 KojiUpdateLSCArms locked in IR, aligned. IFO at nominal powerI have a concern about the SRM suspension.
The yaw alignment bias produces huge pitch
coupling.
  
  8976   Wed Aug 7 10:51:49 2013 SteveUpdateVACPumpdown at 26hrs Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
 26hr.png14datm.png 
  8977   Wed Aug 7 15:32:37 2013 KojiUpdateASCASS setting up accelerated (slightly)I moved bunch of ezcawrite from the ASS
Dither On script to a snapshot file.
This accelerated a half of the "up"
  
  8978   Wed Aug 7 15:36:29 2013 SteveUpdateVACTP2 drypump replaced 
 TP2's fore line - dry pump
replaced at performance level 600 mTorr after
 forelinesPs.jpg 
  8980   Wed Aug 7 19:16:20 2013 JenneUpdateASCASS setting up accelerated moreI have furthered Koji's work, and moved
the filter on/off state for all the filter
banks also to the burt snapshot.  
  
  8981   Wed Aug 7 21:52:11 2013 JenneUpdateSUSSRM coils fine - problem with slow bias slider[Koji, Jenne]
We have looked a little more at the
SRM situation.  We aligned the SRM,
  
  8982   Wed Aug 7 22:18:43 2013 KojiUpdateASCASS updateWhile Gautam is working on the Xarm green
ASS...
The EPICS monitor points for the
 Screenshot-Untitled_Window.png 
  8983   Wed Aug 7 23:40:49 2013 gautamUpdateCDSX-End Green ASS - A first update I
have done some preliminary testing of the
X-End Green ASS Servo. I will write a more
 time-series.pdf 
  8984   Thu Aug 8 07:57:23 2013 SteveUpdateVACpumpdown at 48 hrs

    

       
            
 48hrsPd76.png 
  8985   Thu Aug 8 10:31:28 2013 SteveUpdateVACfew reminders of this vent 1, Vacuum envelope grounds must be
connected all times!  After door removal
reconnect both cables immediately.
 GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg 
  8986   Thu Aug 8 11:18:46 2013 manasaUpdateComputer Scripts / ProgramsUnused scripts in ASS movedI was receiving missing path error when
I was trying to measure the MC spot positions.
Jenne pointed out that Koji had moved all
  
  8989   Thu Aug 8 21:25:36 2013 KojiUpdateGeneralPost-vent alignment cont'd- IPANG aligned on the QPD. The beam seems
to be partially clipped in the chamber.
- Oplev of the IFO mirrors are aligned.
  
  8990   Fri Aug 9 16:49:35 2013 Jenne, manasaUpdateElectronicsPost-vent alignment cont'd - RFPDsNotes to the fiber team:
I am aligning beam onto the RFPDs
(I have finished all 4 REFL diodes, and AS55),
  
  8991   Fri Aug 9 21:05:28 2013 KojiUpdateSUSfixed: SRM coils fine - problem with slow bias sliderNow the SRM Yaw bias in yaw is functional
without any strage behavior.
  
  8992   Fri Aug 9 22:51:37 2013 KojiUpdateLSCPRMI(sb) lock recoveredPRMI(sb) lock
was recovered
  
  8993   Sat Aug 10 05:53:51 2013 gautamUpdateCDSX-End Green ASS - RoundupOver
the last three days, I've had the interferometer
to test and optimize the ASX Servo. Based
 New_ASX_MEDM_MAIN.pdf 
  8994   Mon Aug 12 10:44:22 2013 ranaUpdateLSCPRMI(sb) lock recovered  In the past, we used to use
Stefan's 'ezcademod' or Matt's 'ezlockin'
to do auto phase adjustment.
  
  8995   Mon Aug 12 12:57:59 2013 JenneUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8996   Mon Aug 12 13:30:33 2013 JamieUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8997   Mon Aug 12 14:05:34 2013 JenneUpdateASCPRCL ASS software in place

    

       
            
  
  8998   Mon Aug 12 15:39:40 2013 JenneUpdateASCPRCL ASS screens in placeI have added the PRCL ASS to the main ASS
screen, and created the servo and lockin
screens.  The filters loaded are the
  
  8999   Mon Aug 12 17:30:03 2013 KojiUpdateASCPRCL ASS software in placeWhy POPDC???   
  9000   Mon Aug 12 21:27:03 2013 manasaUpdateCDSc1iscex needs helpI started to modify the c1asx model to
reduce the RFM model from hitting its max
time.
  
  9001   Mon Aug 12 23:13:14 2013 JenneUpdateASCPRCL ASS software in place

    

       
            
  
  9002   Tue Aug 13 07:40:53 2013 SteveUpdateCDSc1iscex needs help 
 Sorrensen ps ouput of +15V
at rack 1X9 was current limited to 10.3V
 c1iscexSick.png 