40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 207 of 357  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  14494   Thu Mar 21 21:50:31 2019 ranaUpdateVACProtection against AC power lossagreed - we need all pumps on UPS for their
safety and also so that we can spin them
down safely. Can you and Chub please find
  
  8727   Wed Jun 19 18:24:14 2013 JenneUpdateCDSProto-ASC implemented in ASS modelI have implemented a proto-ASC in the ASS
model.  
In an ASC block within the ASS model,
  
  8739   Mon Jun 24 16:41:40 2013 JenneUpdateCDSProto-ASC implemented in ASS modelI am working on making the Proto-ASC less
"proto".  I have put IPC senders
in the LSC model to send the cavity trigger
  
  8740   Tue Jun 25 00:13:00 2013 JenneUpdateCDSProto-ASC implemented in ASS modelI have finished my work on the LSC and
ASS models for now. The triggering is all
implemented, and should be ready to go. 
  
  8860   Tue Jul 16 18:20:25 2013 JenneUpdateCDSProto-ASC implemented in ASS modelThe proto-ASC now includes triggering. 
I have updated the hacky temp ASC screen
to show the DoF triggering.  I have
  
  951   Tue Sep 16 16:47:01 2008 peteConfigurationPSLPrototype FSS reference installedAfter verifying output, I installed the new
prototype 21.5 MHz FSS reference (Wenzel
crystal oscillator and ZHL-2 amp).  Yoichi
  
  4228   Sun Jan 30 19:26:03 2011 KojiSummaryGreen LockingPrototype freq dividerA prototype freq divider has been made
which works up to ~40MHz.
74HC4060 (14bit binary ripple counter)
 freq_divider.pdfIMG_3813.jpgIMG_3814.jpg 
  5976   Tue Nov 22 06:12:43 2011 ZachUpdateRF SystemPrototype temperature controllerTonight I built a simpler version of  refres1.pngrefres2.pngproto_temp_ctrl.pngschematic.png 
  14223   Mon Oct 1 22:20:42 2018 gautamUpdateSUSPrototyping HV Bias CircuitSummary:

I've been plugging away at
Altium prototyping the high-voltage bias
 CoilDriverBias.pdfcurrentNoise.pdfPSRR.pdf 
  8132   Thu Feb 21 18:10:13 2013 ranaUpdateSEIPump Down misalignmentsThis plot shows the trend of the OL during
the past several hours of roughing pumping.
The big steps at the start of the
 OL.png 
  8948   Wed Jul 31 21:12:05 2013 manasaUpdateGeneralPump down called off[Koji, Manasa]
We missed to check that we had the green
  
  5357   Wed Sep 7 12:03:49 2011 steveUpdateVACPump down has startedJamie and Steve
We closed ITMX and ITMY chambers
and started pumping around 11am
  
  15666   Mon Nov 9 17:40:17 2020 gautamUpdateGeneralPumpdown[koji, rana, gautam]

1100 - EY chamber inspected, no
issues were found --> EY heavy door on
 IMG_8937.jpgpumpdown.png 
  15667   Tue Nov 10 11:31:13 2020 KojiUpdateGeneralPumpdownMain volume pressure as of 11:30AM 2020/11/10  Screen_Shot_2020-11-10_at_11.30.21.png 
  12575   Thu Oct 20 15:59:52 2016 SteveUpdateVACPumpdown 80 has completedIFO pressure 1.7E-4 Torr on new not logged
cold cathode gauge. P1 <7E-4 Torr

 7hPd80.png8hPd80.png9hPd80.png 
  12574   Thu Oct 20 09:17:08 2016 SteveUpdateVACPumpdown 80 has startedPumping again after 7 days at atmosphere.

BS, ITMY and OMC chambers were
open only.
 readyPd80.pngbeforePd80.pngpd80at1h.png7d_atm.png 
  14426   Fri Feb 1 13:16:50 2019 gautamUpdateSUSPumpdown 83 underway[chub, bob, gautam]


Steps described in previous
elog were carried out
EY heavy
  
  14428   Fri Feb 1 21:52:57 2019 gautamUpdateSUSPumpdown 83 underway[jon, koji, gautam]


IFO is at ~1 mtorr, but
pressure is slowly rising because of outgassing
  
  8976   Wed Aug 7 10:51:49 2013 SteveUpdateVACPumpdown at 26hrs Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
 26hr.png14datm.png 
  17667   Wed Jul 5 11:43:23 2023 JCUpdateVACPumpdown begun this morning[JC, Radhika]

The vacuum system went down over
the weekend due to a loss of N2 pressure
 Screenshot_2023-07-05_11-42-38.png 
  8970   Tue Aug 6 10:06:29 2013 SteveUpdateVACPumpdown is at 500Torr The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
 befPd.png 
  8973   Tue Aug 6 16:45:31 2013 SteveUpdateVACPumpdown is completed IFO  P1=1mT PSL shutter is opened
 
 8hrPd76.png1mT.png 
  14369   Wed Dec 19 19:51:19 2018 gautamUpdateGeneralPumpdown prep[Koji,
gautam]

Summary:
 OMCscan.pdf 
  14631   Wed May 22 22:50:13 2019 gautamUpdateVACPumpdown prepI did the following:


Checked the ETMY OSEM sensing
matrix and OSEM actuation matrix - more on
  
  14370   Wed Dec 19 21:14:50 2018 gautamUpdateVACPumpdown tomorrow I just spoke to Jon who asked me to make
this elog - we will be ready to test one
or more parts of the pumpdown procedure tomorrow
  
  14372   Thu Dec 20 08:38:27 2018 JonUpdateVACPumpdown tomorrow Linked is the pumpdown
procedure, contained in the old 40m documentation.
The relevant procedure is "All Off -->
  
  14634   Thu May 23 15:30:56 2019 gautamUpdateVACPumpdown underway - so far so good![chub, koji, gautam]


We executed the pre-pumpdown
tasks per the checklist - heavy doors were
 pumpdownPres.png 
  17662   Wed Jun 28 10:23:23 2023 HirokiUpdateVACPumping down[Koji, Mayank, Hiroki]

As Mayank and Koji solved the issue
of opening the gate valves yesterday (ID: 
 Screenshot_2023-06-29_05-18-29.pngScreenshot_2023-06-29_05-20-45.png 
  17665   Thu Jun 29 20:10:17 2023 KojiUpdateVACPumping downTowards Vacuum Normal


Closed V7 (Main volume
pumped by TP1/TP2)
Opened VA6
  
  17678   Tue Jul 11 17:21:58 2023 KojiUpdateVACPumping downManually switched TP2 to "Low Speed
(LS)" mode (aka "Stand by")

 
  
  17661   Tue Jun 27 19:49:37 2023 KojiUpdateVACPumping down attemp[Mayank, Hiroki, Yuta, JC, Koji]

After JC came back from the optical
table placement at Synchrotron, we tried
  
  64   Mon Nov 5 22:24:38 2007 Andrey, SteveOmnistructureVACPumping down goes smoothly
We (Steve and Andrey) started pumping down
at 3.25PM today. At 9 PM we turned off the
  
  16490   Mon Dec 6 14:26:52 2021 KojiUpdateVACPumping down the RGA sectionJordan reported that the RGA section needs
to be pumped down to allow the analyzer to
run at sufficiently low pressure (P<1e-4
  
  16493   Tue Dec 7 13:12:50 2021 KojiUpdateVACPumping down the RGA sectionSo that Jordan can run the RGA scan this
afternoon, I ran TP3 and started pumping
down the RGA section.
  
  16494   Wed Dec 8 10:14:43 2021 JordanUpdateVACPumping down the RGA sectionAfter an overnight pumpdown/RGA warm up,
I took a 100 amu scan of the RGA volume and
subsequent pumping line. Attached is a screenshot
 40m_RGAVolume_12_8_21.PNG40m_RGAVolume_Torr_12_8_21.PNG 
  16501   Fri Dec 10 19:22:01 2021 KojiUpdateVACPumping down the RGA sectionThe scan result was ~x10 higher than the
previously reported scan on 2020/9/15 (https://nodus.ligo.caltech.edu:8081/40m/15570),
  
  14406   Fri Jan 18 17:44:14 2019 gautamUpdateVACPumping on RGA volumeSteve came by the lab today, and looked
at the status of the upgraded vacuum system.
He recommended pumping on the RGA volume,
 CC4.png 
  15393   Thu Jun 11 17:35:34 2020 gautamUpdateVACPumpspool UPS needs battery replacementSummary:

The pumpspool UPS has its "
  
  15394   Fri Jun 12 01:23:32 2020 KojiUpdateVACPumpspool UPS needs battery replacement1. I agree that it's likely that it
was the temp signal glitch.
Recom #2: I approve to reopen the
  
  15396   Fri Jun 12 17:32:40 2020 KojiUpdateVACPumpspool UPS needs battery replacementJon and Koji remotely supported Jordan's
resetting the TP2 controller.

Here
 Screen_Shot_2020-06-12_at_17.22.23.png 
  15397   Fri Jun 12 19:02:52 2020 gautamUpdateVACPumpspool UPS needs battery replacementI still don't understand why restoring
the vacuum is contingent on this functionality
working. All the TPs have their own internal
  
  15398   Fri Jun 12 19:23:56 2020 KojiUpdateVACPumpspool UPS needs battery replacementThe vacuum safety policy and design are
not clear to me, and I don't know what
the first and second defense is. Since we
  
  15399   Fri Jun 12 19:33:31 2020 gautamUpdateVACPumpspool UPS needs battery replacementDidn't mean to sound whiny. I will
wait until the vacuum team tells me it is
okay.
  
  12338   Tue Jul 26 16:01:32 2016 SteveSummaryVACPurge compressed air systemThanks for checking this out Koji

The builder in 1996 was Process
System International, Inc ( Westborough,
 cleanAirSupl.pdfmobileHEPA.jpg 
  12339   Tue Jul 26 17:41:59 2016 KojiSummaryVACPurge compressed air systemWe have no number for the CFM without calculation.
We can't assume a random number like
10-15
  
  12337   Tue Jul 26 14:24:38 2016 KojiSummaryVACPurge compressed air system at LHOI've visited the purge clean
air system at LHO Yarm mid-station with John
Worden.
 12x 
  9440   Wed Dec 4 15:43:13 2013 JenneSummaryLSCPut LSC DAQ channels backLast week, Koji cleaned up the LSC model
to make it much more readable, while he was
working on piping the ALS signals to the
  
  4138   Tue Jan 11 18:41:43 2011 JenneUpdateIOOPut MC PZT offset onto MC board, instead of on awkward cart[Larisa and Jenne]
We wanted to get rid of the awkward
cart that was sitting behind the 1Y1 rack. 
 D040180-B.pdf 
  4140   Wed Jan 12 01:38:52 2011 KojiUpdateIOOPut MC PZT offset onto MC board, instead of on awkward cartI can not think of any reason that the
input impedance of 13kOhm between the pos/neg
inputs produces such a big change at the
  
  4147   Wed Jan 12 22:39:16 2011 SureshUpdateIOOPut MC PZT offset onto MC board, instead of on awkward cart


   
        
            
 P1120508.JPGP1120509.JPGD040180-B_with_5V_offset.pdf 
ELOG V3.1.3-