  10108   Fri Jun 27 18:07:38 2014 NichinUpdateComputer Scripts / ProgramsUpdated script for acquiring data from Agilent 4395A network analyzerThe updated script for remotely getting
data from Agilent 4395A network analyzer
is located at /users/nichin
  
  10109   Fri Jun 27 20:52:30 2014 KojiUpdateCDSOTTAVIA was not on networkI came in the lab. Found bunch of white
EPICS boxes on ottavia.
It turned out that only ottavia was
  
  10110   Fri Jun 27 23:49:56 2014 KojiUpdateGeneralIR beam found, TTs not aligned well yetThe
IR beam was found on the PRM surface, some
CCDs, and in the X arm. 
  
  10111   Mon Jun 30 00:18:15 2014 NichinUpdateComputer Scripts / ProgramsUpdated script for acquiring data from Agilent 4395A network analyzer

    

       
            
  
  10112   Mon Jun 30 10:06:39 2014 SteveUpdateVAClow on pneumatic pressure of vacuum valvesThis morning valve condition: V1, VM1,
V4 and V5 valves were closed. IFO pressure
rose to 1.3 mTorr
 runoutofN2.pnglowN2.pngN2d100.png 
  10113   Mon Jun 30 16:55:24 2014 ericqUpdateGeneralIFO (mostly) alignedIR Alignment of the IFO is recovered!
Green alignment could use some attention. 
Arms
and PRC hold well, powers are within normal
  
  10114   Mon Jun 30 22:06:55 2014 JenneUpdateASCIFO (mostly) aligned - ASS working[Koji, Jenne]
The Yarm ASS is now working (as is
the Xarm ASS).  Both of the TT's pitch
  
  10115   Mon Jun 30 22:40:21 2014 ManasaUpdatePSLAOM ringdown

    

       
            
 AOM_ringSample1.pdf 
  10116   Tue Jul 1 13:57:33 2014 ericqUpdateComputer Scripts / ProgramsMC Autolocker on Megatron Just a quick update on the status
of the auto locker:
The auto locker now runs and respawns
  
  10117   Tue Jul 1 18:06:13 2014 nichinUpdateComputer Scripts / ProgramsNetwork Analyzer NWAG4395A data acquisitionEDIT:
The script and template file have been moved
to /opt/rtcds/caltech/c1/scripts/general/netgpibdata/
 LPF2_01-07-2014_175443.pdf 
  10118   Tue Jul 1 21:20:37 2014 AkhilUpdateElectronicsGain plots of UFC-6000 for 0.1s Sampling Rate  The attached are the gain plots at
carrier frequencies of 100 MHz, 500 MHz and
1 GHz measured using IFR 2023B (Marconi).
 gain.pnggain.pdf 
  10119   Wed Jul 2 11:32:44 2014 Jenne, TaraVUpdatePEMStatus of seismometer stations, Yend Guralp moved[Jenne, TaraV]
We had a look this morning at
the status of the seismometer array, so that
  
  10120   Wed Jul 2 11:47:26 2014 SteveUpdateVACbroken changeover regulator of N2 supply

    

       
            
  
  10121   Wed Jul 2 14:19:17 2014 SteveUpdateGeneralOphir pmeter gets new filterOphir power meter gets new filter with
calibration. This is not cheap. It was the
second time we lost it.
 ophirNewFilter.jpg 
  10122   Wed Jul 2 15:35:34 2014 ericqUpdateComputer Scripts / ProgramsLocal Chiara backupsKoji has provided a 2TB USB3 external hard
drive that will get daily backups of chiara:/home/cds,
the idea being that if the internal HD at
  
  10123   Wed Jul 2 16:16:45 2014 NichinUpdateGeneralLAN wire added [Nichin, Eric Q]
We added a new LAN wire from Rack
1Y4 to 1Y1 to connect the RF switch at 1Y1
  
  10124   Wed Jul 2 16:18:32 2014 JenneUpdateASCIFO aligned, PRMI + 2 arms achievedAfter the meeting, I aligned the IFO to
the IR, and then I aligned the Ygreen to
the Yarm.  I then found the beatnotes
  
  10125   Wed Jul 2 21:30:42 2014 JenneUpdateLSCLittle Bo-Peep has lost her phaseLittle Bo-Peep has lost her phase,

 CARM_loop_ArmPowers1_2July2014.pdf 
  10126   Wed Jul 2 22:58:11 2014 JenneUpdateLSCLittle Bo-Peep has found her phaseNever
mind.  This is just the
low pass filter that Den put in to try to
  
  10128   Thu Jul 3 16:28:38 2014 NichinUpdateElectronicsRF cables installed [ Nichin, Eric G]
RF cables have been installed between
deomodulator output PD RF MON and the RF
 AS55_03-07-2014_162634.pdf 
  10129   Fri Jul 4 09:17:13 2014 AkhilConfigurationElectronicsSetup Used for Characterization of Frequency Counter Goal:
To
 setup.pdf 
  10130   Sat Jul 5 04:18:45 2014 AndresUpdate40m Xend Table upgradeAdding Two Lenses After the Second Steering Mirror in Order Two Increase the Gouy Phase Difference Between the Sterring MirrorsI had been working on the Xend table optical
layout update. Since the two steering mirrors
in the Xend green are too close to each,
 7x 
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework   8days.png 
  10132   Mon Jul 7 09:46:00 2014 SteveConfigurationSUSall sus damping restoredAll suspension damping restored. There
had to be an earth quake.
 6.9MagMexico.png 
  10133   Mon Jul 7 10:35:43 2014 JenneUpdateElectronicsRF PDs needed

    

       
            
  
  10134   Mon Jul 7 11:02:22 2014 manasaConfigurationGeneralIFO status post earthquake

    

       
            
  
  10135   Mon Jul 7 13:44:21 2014 JenneUpdateCDSc1sus - bad fb connection

    

       
            
  
  10136   Mon Jul 7 13:55:26 2014 JenneUpdateLSCc1cal model restartedI'm not sure why the c1cal model didn't
come up the last time c1lsc was rebooted,
but I did an "rtcds start c1cal"
  
  10137   Mon Jul 7 13:56:13 2014 AkhilConfigurationElectronicsSetup Used for Characterization of Frequency CounterWhen I was trying to plot PSD of the measurements,
I still couldn't get better resolution. There
still seems to be a problem with timing and
 FreqVsTime.pngMissing_Data.png 
  10138   Mon Jul 7 14:38:55 2014 SteveUpdatesafetysafety trainingTaraV
- geology major undergrad -  of Jenne's
  
  10139   Mon Jul 7 14:42:33 2014 HarryUpdateGeneralBeam WaistsI was finally able to get a reasonable
measurement for the beam waist(s) of the
spare NPRO.
 16x 
  10140   Mon Jul 7 16:39:09 2014 manasaUpdatePSLPMC ringdown setupI moved stuff on the PSL table to accommodate
the PMC ringdown setup.
I used the beam that leaks from the
 PMC_ring.png 
  10141   Mon Jul 7 16:39:26 2014 SteveUpdatePEMants on the PSL table

    

       
            
  
  10142   Mon Jul 7 16:52:02 2014 manasaUpdateElectronicsRF cables need to be reroutedThe RF cables have been routed incorrectly.
The cables run to the module from the front
of the rack. We cannot close the doors to
  
  10143   Mon Jul 7 17:20:09 2014 NichinUpdateElectronicsRF PDs needed

    

       
            
  
  10144   Mon Jul 7 18:11:04 2014 KojiUpdateGeneralBeam Waists-
Plots should be directly attached on the
elog. (Attaching codes in a zip
  
  10145   Mon Jul 7 18:38:27 2014 NichinUpdateElectronicsRF cables rerouted

    

       
            
 1.png2.png 
  10146   Mon Jul 7 21:36:33 2014 Jenne, ranaUpdatePSLPMC local oscillator is going wonkyThe PMC local oscillator is going
a little weird dying. 
We need to check out why the level
 PMC_LO_failing.pdf 
  10147   Mon Jul 7 22:07:29 2014 ranaUpdateElectronicsRF cables reroutedThis Red Ladder movement also probably
included some bumping of the MC2 stack (
 Untitled.pdf 
  10148   Mon Jul 7 22:18:26 2014 KojiUpdatePSLPMC local oscillator is going wonkyIt seems that there is no better chip in
MiniCircuits line-up with the same form factor.
  
  10149   Mon Jul 7 23:19:55 2014 ranaUpdatePSLPMC ringdown setup

    

       
            
  
  10150   Tue Jul 8 01:55:21 2014 JenneUpdateSUSETMX glitching[Jenne, Rana]
A few times this evening, I had been
having trouble locking CARM and DARM with
  
  10151   Tue Jul 8 09:02:02 2014 AkhilUpdateElectronicsPSD Plots for different sampling times of the Frequency Counter Although there were few timing issues
with the FC and the Raspberry Pi at the lowest
sampling time of the FC (0.1s) even after
 7x 
  10152   Tue Jul 8 15:07:24 2014 NichinHowToElectronicsRF Multiplexer in rack 1Y1The RF
multiplexer is configured as shown in the
figure. It is now effectively a 15x1 RF mux.
 RF_Multiplexers.png 
  10153   Tue Jul 8 15:28:32 2014 KojiUpdatePSLPMC local oscillator is going wonkyKoushik and Koji try to fix the PMC oscillator
issue. So we remove the module from the rack.
This means we don't have the PMC transmission
  
  10154   Tue Jul 8 16:45:15 2014 NichinUpdateGeneralWeekly plan My plan for next week is...
  
  10155   Tue Jul 8 17:59:12 2014 jamieOmnistructureElectronicsJamie 1811 power supply fixed!I finally made good on the LIFE TIME WARRANTY
on the ancient, Jamie-made 1811 power supply
with the faulty switch:
 20140708_165010.jpg 
  10156   Tue Jul 8 18:20:15 2014 jamieOmnistructureElectronicsJamie 1811 power supply fixed! Placed in PD cabinet in Y arm, next
to the OTHER Jamie-made 1811 power supply
from 1998.
  
  10157   Tue Jul 8 22:53:02 2014 Jenne, RanaUpdateElectronicsTransmon QPD / whiteningWe need to work farther on checking
out the end transmission QPD electronics
situation. 
  
  10158   Tue Jul 8 23:59:49 2014 HarryUpdateGeneralWeekly Plan (7.8.14) Last Week:
-I continued to struggle with the
razorblade beam analysis, though after a
  