  1577   Tue May 12 15:22:09 2009 YoichiUpdateLSCArm Finesse[quote]
It looks as if the measured DARM response
is skewed by an extra low pass filter at
  
  1591   Fri May 15 17:30:00 2009 robUpdateLSCarms, coils, locksThis is the two arms locked, for an hour. 
No integrator in either loop, but from this
it looks like ETMY may have a bigger length2angle
 armslock_no_int.png 
  1592   Sat May 16 16:20:33 2009 robUpdateLSCarms, coils, locks, #2


   
        
            
 twoproblems.pngcoil_imbalanceETMY.pngITMXalignment.png 
  1650   Thu Jun 4 01:32:20 2009 robConfigurationLSCAS port mode scanHere is a set of mode scans of the AS port,
using the OMC as a mode scanner.  The
plot overlays various configurations of the
 modes.png 
  1661   Mon Jun 8 18:22:27 2009 AlbertoDAQLSCAdded PD11 I amd Q slow channelsI just added two slow channels to C0EDCUEPICS
to monitor the input of PD11. The names are:
[C1:LSC-PD11_I_INMON]
  
  1667   Thu Jun 11 03:15:15 2009 AlbertoUpdateLSCDD Handoff attemptsPete, Alberto,
tonight we worked on the tuning of
the double demod phases for the handoff of
  
  1669   Thu Jun 11 22:14:10 2009 AlbertoUpdateLSCDD Handoff for the Short DOFs completedThis afternoon I tuned the handoff script
for the SRC, after that Rob eralier during
the day had already adjusted that for PRC.
  
  1685   Thu Jun 18 23:20:40 2009 robSummaryLSCI-Q ratio with RF detected DARMThis is a ratio of PD1_I to PD1_Q (so a
ratio of the two quadratures of AS166), measured
in an anti-spring state.  It's not flat
 IQratio.jpg 
  1878   Mon Aug 10 17:27:47 2009 robConfigurationLSCTRX, TRY gain 
These are the settings which determine
the transmon (eg, TRX) amplitude, and which
  
  1929   Wed Aug 19 18:02:22 2009 JenneUpdateLSCRF PDs alignedAll of the LSC RF PDs have been aligned. 
I didn't really change much of anything,
since for all of them, the beam was already
  
  1966   Thu Sep 3 23:41:32 2009 AlbertoConfigurationLSCPOX (PD3) alignedToday I aligned the beam to PD3 (POX) since
Steve had moved it.
The DC power read 1.3mV when the
  
  1999   Thu Sep 24 20:17:05 2009 ranaSummaryLSCComparison of Material Properties for the new RFPD Mounts
    

       
             
  
  2016   Tue Sep 29 01:50:10 2009 robConfigurationLSCnew modulation frequenciesMode cleaner length measured tonight.
 
33196198
  
  2101   Fri Oct 16 03:16:50 2009 rana, robSummaryLSCfunny timing setup on the LSCWhile measuring the Piezo Jena noise
tonight we noticed that the LSC timing is
setup strangely. 
 1X3_1.JPG 
  2104   Fri Oct 16 13:25:18 2009 KojiSummaryLSCfunny timing setup on the LSCCould be this.
http://ilog.ligo-la.caltech.edu/ilog/pub/ilog.cgi?group=detector&task=view&date_to_view=10/02/2009&anchor_to_scroll_to=2009:10:02:13:33:49-waldman

  
  2111   Sun Oct 18 22:05:40 2009 kiwamuUpdateLSCLSC timing issueToday
I made a measurement to research the LSC
timitng issue as mentioned on 
 rough.pngdetail.png 
  2113   Sun Oct 18 23:02:03 2009 KojiUpdateLSCLSC timing issueYou yourself told me that tdsdata uses
some downconversion from 32k to 16k!
So, how does the downconversion appears
  
  2114   Mon Oct 19 10:00:52 2009 kiwamuUpdateLSCRE: LSC timing issueOf course I know there is a downconversion
in OMC signal from 32k to 16k.
But I was just wondering if the delay
  
  2122   Mon Oct 19 23:14:32 2009 kiwamuUpdateLSCLSC timing issueI measured
the noise spectrum of LSC_DARM_IN1 and OMC-LSC_DRIVE_EXC
by using DTT,
 SPE20Hz.pngSPE200Hz.pngSPE2kHz.png 
  2126   Tue Oct 20 16:35:24 2009 robConfigurationLSC33MHz Mod depthThe 33MHz mod depth is now controlled by
the OMC (C1:OMC-SPARE_DAC_CH_15).  The
setting to give us the same modulation depth
  
  2145   Mon Oct 26 18:49:18 2009 kiwamuUpdateLSCOMC-LSC timing issueAccording to my measurements I
conclude that LSC-signal is retarded from
 exp1.pngexp2.pngOMC_LSC60sec.png 
  2146   Mon Oct 26 19:12:50 2009 kiwamuUpdateLSCdiagnostic script for LSC timingThe diagnostic script I've written is available
in the 'caltech/users/kiwamu/work/20091026_OMC-LSC-diag/src'.
To run the script, you can just execute
  
  2153   Tue Oct 27 19:37:03 2009 kiwamuUpdateLSCcron job to diagnose LSC-timingI set a cron job on allegra.martian to
run the
diagnostic script every weekend.
  
  2167   Mon Nov 2 10:56:09 2009 kiwamuUpdateLSCcron job works succesfully & no timing jitterAs
I wrote on Oct.27th, the cron job works
every Sunday.
  
  2174   Wed Nov 4 16:49:32 2009 AlbertoUpdateLSCArm Cavity Finesse MeasurementI'm going to work on the X arm to measure
the arm cavity finesse.
The idea is to measure the cavity
 DSC_0952.JPG 
  2175   Wed Nov 4 18:35:19 2009 AlbertoUpdateLSCArm Cavity Finesse Measurement

    
        
  
  2176   Wed Nov 4 21:46:18 2009 AlbertoUpdateLSCArm Cavity Finesse Measurement

    
        
  
  2177   Wed Nov 4 23:17:51 2009 AlbertoUpdateLSCX Arm Cavity transfer FunctionI measured the transfer function between
MC_TRANS and TRX and I'm attaching the result.
 ArmCavityTF02.png 
  2178   Thu Nov 5 05:07:22 2009 ranaUpdateLSCX Arm Cavity transfer FunctionI would have guessed that you have to calibrate
the detectors relative to each other before
trying this. Its also going to be tricky
  
  2184   Thu Nov 5 19:25:11 2009 AlbertoUpdateLSCX Arm Cavity transfer Function


   
        
            
 PDA255CalibrationTF03.png 
  2185   Thu Nov 5 22:30:09 2009 AlbertoUpdateLSCX Arm Cavity Transfer FunctionIt seems that just repeating the measurement
was enough to get a good transfer function
of the x arm cavity. Here's what I got.
 XarmTF01.png 
  2186   Thu Nov 5 23:09:34 2009 AlbertoUpdateLSCY Arm Cavity Transfer FunctionAs for the X Arm, this the transfer function
I measured for the Y arm cavity.
 YarmTF01.png 
  2188   Fri Nov 6 00:24:06 2009 AlbertoUpdateLSCY Arm Cavity Transfer Function

    
        
 YarmTF02.png 
  2189   Fri Nov 6 00:40:29 2009 AlbertoUpdateLSCEverything put back as it wasI disconnected the setup for the arm cavity
TF measurement. I opened the scitation switch
on the ISS medm screen. I reconnected the
  
  2208   Mon Nov 9 11:11:19 2009 AlbertoConfigurationLSCMC2 Watchdogs trippedThe MC2 watchdogs tripped. I just restored
them.
I also had to relock the MZ and then
  
  2217   Mon Nov 9 15:11:02 2009 AlbertoUpdateLSCEverything put back as it was


   
        
            
  
  2226   Tue Nov 10 13:02:36 2009 AlbertoUpdateLSCX and Y Arm Cavity Poles MeasurementFrom fitting the arm cavity transfer functions
I got the following values for the cavity
pole frequencies.
 SummaryOfFits.pdfCodeAndData.tar 
  2247   Thu Nov 12 02:02:18 2009 ranaSummaryLSCArm Locking with no feedback to the ETM or ITMSteps:
1) Turn off feedback to ETMY (the
ETMY button on the LSC screen).
 nohands-2.pdf 
  2277   Mon Nov 16 17:35:59 2009 kiwamuUpdateLSCOMC-LSC timing get synchronized !An interesting thing was happened in the
OMC-LSC timing clock.
Right now the
 OMC-LSC.png 
  2317   Mon Nov 23 21:30:29 2009 JenneUpdateLSCMeasured MC lengthWith Koji's help, I measured the length
of the Mode Cleaner.
The new modulation frequencies (as
  
  2319   Tue Nov 24 08:00:16 2009 ranaUpdateLSCMeasured MC lengthI propose that from now on, we indicate
in the elog what frequencies we're referring
to. In this case, I guess its the front panel
  
  2320   Tue Nov 24 10:36:21 2009 KojiUpdateLSCMeasured MC lengthWhat I meant was the VCO driver, not the
FSS box.
As for the frequency, all written
  
  2350   Thu Dec 3 15:55:24 2009 AlbertoAoGLSCRF AM Stabilizer Output PowerToday I measured the max output power at
the EOM output of one of the RF AM Stabilizers
that we use to control the modulation depth.
  
  2384   Thu Dec 10 13:10:25 2009 AlbertoConfigurationLSC166 LO DisconnectedI temporarily disconnected the Heliax cable
that brings the 166MHz LO to the LSC rack.
I'm doing a couple of measurement
  
  2389   Thu Dec 10 17:05:21 2009 AlbertoConfigurationLSC166 MHz LO SMA-to-Heliax connection repairedI replaced the SMA end connector for the
166 MHZ Local Oscillator signal that goes
to the back of the flange in the 1Y2 rack.
  
  2393   Thu Dec 10 18:31:44 2009 AlbertoConfigurationLSC166 LO Disconnected


   
        
            
  
  2395   Fri Dec 11 09:30:09 2009 KojiConfigurationLSC166 LO DisconnectedThey
must not be dBm, must be dB 

  
  2396   Fri Dec 11 11:42:26 2009 AlbertoConfigurationLSC166 LO Disconnected


   
        
            
  
  2398   Fri Dec 11 14:12:32 2009 ranaConfigurationLSC166 LO Disconnected 
 Seems like very strange cable
loss numbers. The Heliax is lossier than
  
  2402   Fri Dec 11 19:51:13 2009 AlbertoConfigurationLSC166 LO Disconnected


   
        
            
  
ELOG V3.1.3-