40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 201 of 348  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  7420   Thu Sep 20 14:55:06 2012 JenneUpdateGeneralPickoffs are hard to see

    

       
            
  
  7419   Thu Sep 20 11:39:40 2012 ManasaUpdateGeneralDRMI aligned again, but with good arms 
 QPD at IPPOS has been centered
by removing the filter at the QPD.
  
  7418   Thu Sep 20 08:50:14 2012 MashaUpdateMachineLearningMachine Learning Update Hi everyone,
I've been working a bit on neural
network code for a controller, and thus far
  
  7417   Thu Sep 20 08:34:46 2012 ManasaUpdateGeneralDRMI aligned again, but with good arms

    

       
            
  
  7416   Thu Sep 20 01:29:04 2012 ManasaConfigurationPSLAOM installation

    

       
            
 TEK00000.PNG 
  7415   Thu Sep 20 01:28:14 2012 JenneUpdateGeneralDRMI aligned again, but with good arms[Jenne, Manasa]
Using the alignment of the PZTs and
BS from pre-dinner, where the beam was hitting
  
  7414   Wed Sep 19 23:17:25 2012 ranaConfigurationPSLAOM installationMannasa and Unni and I looked at the
RF driver for the AOM. It was fine.
With the ALC input left unconnected,
  
  7413   Wed Sep 19 19:38:37 2012 JenneUpdateGeneralSpot centered on BS, ETMY, ETMX[Unni, Manasa, Jenne]
It turned out that the beam was a
teeny bit high in the corner, so we touched
  
  7412   Wed Sep 19 17:48:47 2012 DenUpdateModern ControlETMXTime domain control using LQR technique
is now applied to ETMX sus position. The
plan was to do it for oplevs, I'll do it
 etmx_suspos.png 
  7411   Wed Sep 19 15:41:27 2012 ManasaConfigurationPSLAOM installation 
 AOM driver has been removed
from the PSL table for testing. However the
  
  7410   Wed Sep 19 13:12:48 2012 JenneUpdateIOOPower into vacuum increased to 75mWThe power buildup in the MC is ~400, so
100mW of incident power would give about
40W circulating in the mode cleaner.
  
  7409   Wed Sep 19 11:39:37 2012 ManasaConfigurationPSLAOM installation

    

       
            
 ALC_25.png 
  7408   Wed Sep 19 09:32:24 2012 SteveUpdateSUSalignment centering jigSOS alignment tool with ID 9.5 and 6.3
mm
 IMG_1639.JPGIMG_1651.JPG 
  7407   Wed Sep 19 09:24:01 2012 SteveOmnistructureIOOaccess connector at athmoshere

    

       
            
 IMG_1641.JPGIMG_1642.JPGacetateAC.png 
  7406   Wed Sep 19 01:15:15 2012 JenneUpdateGeneralLast of In-vac mirror photos taken - NOT!I'm making a separate entry to go along
with this thread of photos...
Putting the camera and 'bathroom'
  
  7405   Wed Sep 19 01:08:48 2012 JenneUpdateGeneralDRMI aligned againThe DRMI was aligned once again tonight. 
Here's a video: http://youtu.be/Cy8nHL9yMeM 
(Can someone please tell me / remind me how
 DRMI_aligned_19Sept2012_ETMYwasHighNeedToFix.png 
  7404   Tue Sep 18 22:06:21 2012 Mike J.UpdateElectronicsAS beam scan plots and chi-squaredResults of the Razor Blade Beam Scan
The horizontal blade test measured
the beam intensity as a razor blade passed
 beam_width.pyH_raz.pngV_raz.png 
  7403   Tue Sep 18 20:32:42 2012 ManasaConfigurationPSLAOM installation {Jan, Manasa}
We tried towards calibrating the
RF driver of the AOM. We decided to use the
  
  7402   Tue Sep 18 18:24:50 2012 JenneUpdateGeneralScattering in BS chamber or ITMX chamberI have touched PZT2 such that the beam
goes through the 45 degree non-iris target
on the beam splitter.  This puts the
  
  7401   Tue Sep 18 11:53:12 2012 JenneUpdateGeneralLast of In-vac mirror photos taken

    

       
            
 AllPhotos_Sept2012.pdf 
  7400   Mon Sep 17 23:58:01 2012 ranaUpdateGeneralLast of In-vac mirror photos taken My hope is that the DRMI flashes
will be bright enough to see on the PO beams.
IF we get 10 mW through the Faraday, you
  
  7399   Mon Sep 17 20:23:31 2012 JenneUpdateGeneralLast of In-vac mirror photos taken[Manasa, Jenne]
We took the last of the in-vac photos
of mirrors today.  I'll post in the
  
  7398   Mon Sep 17 18:04:01 2012 SteveUpdateCOC2 Layout Changes

    

       
            
 IMG_1635.JPG 
  7397   Mon Sep 17 13:39:32 2012 JenneUpdateGeneralMore photos taken

    

       
            
 AllPhotos_Sept2012.pdf 
  7396   Mon Sep 17 07:57:58 2012 ranaUpdatePEMBS and AS tables for REFL change 
 This was in response to my
suggestion to move the REFL beam path to
  
  7395   Sat Sep 15 20:27:54 2012 DenUpdatePEMBS and AS tables

    

       
            
 bs_as_h.jpgbs_as_v.jpg 
  7394   Sat Sep 15 18:46:50 2012 DenUpdatePEMmicrophone locationI've suspended microphones around the lab
C1:PEM-MIC_1 - MC2
C1:PEM-MIC_2
- ETMX
C1:PEM-MIC_3 - PSL
C1:PEM-MIC_4
 mics.png 
  7393   Sat Sep 15 18:29:25 2012 JenneUpdateGeneralMore photos taken{EricQ, Jenne]
More photos were taken.  Will
post Monday, because too hungry now.
  
  7392   Fri Sep 14 21:03:02 2012 DenUpdatePEMBS and AS tablesI've measured seismic and acoustic noise
on BS and AS tables. It seems that horizontal
motion of BS table is ~1.5-2 times more then
 vert.pnghoriz_4_50.pngacoustic.pngcoh.png 
  7391   Fri Sep 14 18:28:25 2012 JenneUpdateGeneralIn Vac PicturesAll the photos so far:
PZT1:
 pzt1_light.jpgmmt1.jpgmmt2.jpgpzt2.jpgippo.jpg 
  7390   Fri Sep 14 18:18:33 2012 JenneUpdateGeneralIn Vac Pictures

    

       
            
 mmt2.jpg 
  7389   Fri Sep 14 18:15:43 2012 ranaUpdateASCFirst In Vac Picture 
 Looks good. Any way that you
can tell in an unambiguous way, where the
  
  7388   Fri Sep 14 16:39:14 2012 ericq, jenneUpdateGeneralFirst In Vac PictureAfter much fussing, we got a picture of
MMT1 with the beam.
Using the iris doesn't seem feasible.
 mmt1.jpg 
  7387   Fri Sep 14 12:51:43 2012 JenneUpdateSUSNeed risers for active TTsI was helping Den get started in the cleanroom
yesterday, and I noticed that the new active
TTs, like the old passive ones, are set to
  
  7386   Fri Sep 14 01:35:55 2012 Mike J.UpdateElectronicsAS beam scan PLOTS   H_razor.jpegV_razor.jpeg 
  7385   Fri Sep 14 01:18:51 2012 ranaUpdateCOC2 Layout ChangesAfter looking
at the in-vacuum layout I think we should
  
  7384   Fri Sep 14 01:05:36 2012 DenUpdateSUSMirrors being installed on active TTs

    

       
            
  
  7383   Fri Sep 14 00:56:13 2012 JenneUpdateGeneralDRMI aligned[Rana, Jenne]
We
aligned the DRMI, and have concluded that
  
  7382   Fri Sep 14 00:33:31 2012 ranaUpdatePSLPMC alignment - mystery in reflected powerThe PMC reflection made it seem that the
beam going into it was misaligned. I went
to the table and aligned the input beam to
 pmcr.jpge.pnga.png 
  7381   Thu Sep 13 23:27:14 2012 JenneUpdateGeneralPre-close checklistWe need
to do the following things:  Images
of optics in DRMI chain, place black glass
  
  7380   Thu Sep 13 19:59:43 2012 Mike J.UpdateElectronicsAS beam scan**EDIT:** Mixed up X and Y. Beam is
3.5844
  
  7379   Thu Sep 13 17:19:45 2012 JenneUpdateSUSMirrors being installed on active TTsI have given Den 4 G&H R>99.99%
mirrors to be installed on the 4 active tip
tilts.  He's in there working on things
  
  7378   Thu Sep 13 07:36:41 2012 SteveUpdateGeneralrestore conditions

    

       
            
  
  7377   Wed Sep 12 20:08:51 2012 ericqUpdateElectronicsAS beam scan

    

       
            
  
  7376   Wed Sep 12 19:26:08 2012 Rijuparna ChakrabortyUpdate cavitymode scan Summary: Recorded the presence of
higher order modes in IMC
What I did: Misaligned the flat mirror
 7x 
  7375   Wed Sep 12 17:02:00 2012 SteveUpdateCamerasbaffle plate hole getting larger

    

       
            
 IMG_1631.JPGIMG_1628.JPG 
  7374   Wed Sep 12 11:33:49 2012 SteveUpdateSAFETYsafety trainingEric Quintero and Mike Jenson received
40m specific basic safety training.
  
  7373   Wed Sep 12 08:16:49 2012 SteveConfigurationPEMchamber must be sealed overnight!

    

       
            
  
  7372   Tue Sep 11 17:17:51 2012 Eric Q., Mike J.ConfigurationElectronicsAS beam scanWe conducted a beam scan on the AP table
of the AS beam. We used a lens to focus the
beam onto a power meter, and slowly moved
  
  7371   Mon Sep 10 19:04:32 2012 ranaUpdateGeneralplan On Friday, Koji and I adjusted the
beam pointing into the DRMI using the PZT
yaw and found that the beam inside the DRMI
  
ELOG V3.1.3-