40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 199 of 354  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  8759   Wed Jun 26 21:52:55 2013 CharlesUpdateISSCTN Servo Prototype CharacterizationFollowing the circuit
design in elog 8748, I constructed
a prototype for the servo portion of the
 TF_Mag-CTNServo_v2_Prototype.pngTF_Mag-CTNServo_v2_Prototype_AD829s.png 
  8771   Thu Jun 27 18:24:25 2013 CharlesUpdateISSCTN Servo Prototype Characterization - Done CorrectlyAs I showed in [elog
8759], measuring the transfer function
of my prototype servo was difficult due to
 TF-CTNServo_v2_Prototype-Individual_Stages.pngTF-CTNServo_v2_Prototype-Calc_vs_Meas.pngTF-CTNServo_v2_Prototype-Individual_Stages.figTF-CTNServo_v2_Prototype-Calc_vs_Meas.fig 
  8786   Fri Jun 28 16:19:06 2013 CharlesUpdateISS40m Noise Budget - Seismic Contribution I'm working on developing a full
noise budget for the 40m. To that end, I'll
use measurements from the GUR1 seismometer
 seismic_noise_6-28-13_raw.pngseismic_noise_6-28-13_raw.figseismic_noise_6-28-13_meters.pngseismic_noise_6-28-13_meters.fig 
  8791   Tue Jul 2 12:59:46 2013 CharlesUpdateISSGeneral Design for ISS Applicable to Multiple Applications While attempting to develop a somewhat
accurate noise budget for the 40m, I reasoned
that while the shape of the transfer function
 6x 
  8799   Wed Jul 3 20:51:43 2013 CharlesUpdateISSProposed ISS for CTN Experiment - Altium Schematic After familiarizing myself with Altium,
I drew up the attached schematic for the
ISS to be used in the CTN experiment. The
 CTNServo_v2_abbott-switch.pdf 
  8830   Thu Jul 11 13:52:51 2013 CharlesUpdateISSRMS threshold detection and triggeringThere are essentially two major portions
of the ISS I am designing. One system has
the voltage reference, differential amplifier
 40mServo_v1.pdfSimple_Comparator_Circuit.pngF0001TEK.JPG 
  8836   Fri Jul 12 12:51:13 2013 CharlesUpdateISSRMS Noise from PMC TransmissionI went out on the floor to look at the
transmitted signal from the PMC to get a
rough idea of the noise of the unstabilized
  
  8838   Fri Jul 12 13:15:43 2013 KojiUpdateISSRMS Noise from PMC TransmissionIt would be better to measure the power
spectrum density of the fluctuation. 
The RMS does not tell enough information
  
  8839   Fri Jul 12 18:30:20 2013 CharlesUpdateISSRMS Noise from PMC Transmission

    

       
            
  
  8876   Thu Jul 18 21:45:36 2013 CharlesUpdateISSISS - Full Schematic Here I have included the full schematic
(so far) of the proposed ISS. There are two
sheets: the first schematic details the filter
 40mServo_v1.pdf 
  8920   Wed Jul 24 22:58:03 2013 CharlesUpdateISSISS - Full Schematic - Updated I have made significant changes to
the ISS schematic, mostly in the form of
adding necessary subsystems.
 40mServo_v1.pdf 
  8922   Thu Jul 25 12:53:45 2013 CharlesUpdateISSComparator + Triggering Prototype I realized I totally forgot to post
this last week, but I prototyped the comparator
and boost triggering portion of the ISS,
 Comparator_Prototype.pngComp_Triggering_Behavior.jpg 
  8927   Fri Jul 26 14:39:08 2013 CharlesUpdateISSPower Regulation for ISS BoardI constructed a regulator board that can
take 
  
  8928   Fri Jul 26 22:19:24 2013 CharlesUpdateISSISS - Full Schematic - Updated

    

       
            
 40mServo_v1.pdf 
  8959   Thu Aug 1 22:58:45 2013 CharlesUpdateISSCTN Servo - Explicit Requirement and Proposed Servo In PSL
elog 1270, Evan elucidated the explicit
requirements for the CTN ISS board. Essentially,
 CTN_Servo_TF_-_Proposed_v_Req.pngCTNServo_v3.fil 
  8961   Fri Aug 2 21:59:36 2013 CharlesUpdateISSFinalized ISS Schematic (hopefully) Attached is the finalized schematic. The
general circuit topology should remain the
same from this point forward, although individual
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  8964   Mon Aug 5 11:53:45 2013 EvanUpdateISSCTN Servo - Explicit Requirement and Proposed ServoI goofed on the transfer function requirement
by not giving you the plant transfer function,
which looks to be about 0.014 V/V,  independent
  
  9016   Thu Aug 15 21:42:53 2013 CharlesUpdateISSISS - Schematic + PCB Layout After many, many moons of getting
to know exactly how frustrating Altium can
be, I have completed the PCB layout for my
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  9328   Fri Nov 1 18:59:41 2013 EvanConfigurationISSAOM cabling[Rana, Nic, Evan]
We did some work today on getting
the AOM back up and running so that we can
 aom.jpgaom_driver.jpgaom_driver_power.jpg20131101_170120.jpg 
  9331   Sat Nov 2 22:49:44 2013 CharlesUpdateISSCTN ISS Noise Suppression Requirement - Updated 10/27 Previously in elog
8959, I gave a very simple method for
determining the noise suppression behavior
 7x 
  9332   Sun Nov 3 00:05:52 2013 CharlesSummaryISSISS Update - Bout' timeRight near the end of summer, I had an
ISS board that was nominally working, but
had a few problems I couldn't really sort
 full-op-loop.pngfull-cl-loop.pngreq-vs-meas.png 
  9376   Wed Nov 13 18:32:04 2013 Nic, EvanUpdateISSSR560 ISS loopWe have implemented an SR560-based ISS
loop using the AOM on the PSL table. This
is a continuation of the work in 
 psl_aom_overhead.jpgaom_driver.jpgloop_on_settings.jpgfxn_gen.jpg40m_iss.pdf 
  9379   Wed Nov 13 19:41:55 2013 JenneUpdateISSISS AOMAOM driving from DAC:
I found that the DAC channels for
TT3 and TT4 are connected up in the simulink
  
  9380   Wed Nov 13 20:02:12 2013 Nic, EvanUpdateISSSR560 ISS loop

    

       
            
 ISS_560_rot.pdfISS_560cal.pdf 
  9392   Fri Nov 15 10:31:45 2013 SteveUpdateISSSR560 ISS loop connection

    

       
            
 ISS.png 
  9929   Thu May 8 02:03:51 2014 ranaUpdateISSISS: fuse was blown, repaired, loop back onBack in November, Nic and Evan turned on
an SR560 based ISS. It uses the PMC TRANS
PD as the error signal and makes an AC coupled
 ISS.pdf 
  69   Tue Nov 6 15:36:03 2007 robUpdateLSCXARM lockedEasily, after resetting the PSL Uniblitz shutters.
 There's no entry from David or Andrey about
the recovery from last week's power outage,
  
  240   Wed Jan 16 14:06:24 2008 robUpdateLSCmonday's lockingrob, tobin, johnnie

We did some locking work monday night, with
  
  241   Wed Jan 16 14:09:45 2008 robUpdateLSCtuesday's locking
I got a little further with the locking (PRFPMI)
last night, after discovering that the cable
  
  244   Thu Jan 17 14:13:20 2008 robUpdateLSCWednesday's lockingIncremental progress on locking yet again.
 This time the handoff of DARM to the OMC
worked, and progress halted at handing off
  
  249   Fri Jan 18 15:31:47 2008 robUpdateLSCThursday's locking
[I]rob, johnnie, andrey[/I]
 DARMnoise080118.png 
  252   Tue Jan 22 02:33:45 2008 robUpdateLSCDRMI work
0) The ETMY oplev needs work/centering
  
  272   Sat Jan 26 02:08:53 2008 JohnOmnistructureLSCFibresThere is now a fibre running from the SP table
to the ISCT at the Y-end. In the coming days
I will try to mode match the beam from this
  
  296   Mon Feb 4 22:01:57 2008 JohnSummaryLSCFibres auxiliary locking - FibersI managed to couple ~75% of the light transmitted
from the y arm, through the fibre, back to
the SP table. I hoped that this would be
  
  315   Wed Feb 13 20:37:11 2008 JohnUpdateLSCFibre locking - FiberSam and I observed fringes in the light reflected
from the Y arm. These fringes are due to
the sidebands and not the carrier. To improve
  
  342   Wed Feb 27 22:05:03 2008 JohnUpdateLSCAuxiliary lockingA summary of the status of the auxiliary arm
locking effort.
  
  348   Fri Feb 29 13:51:17 2008 JohnSummaryLSCPD6 responseI checked the response of PD6 using the AM
laser. It looks happy enough.[IMG]elog:348/1[/IMG]
 PD6Attempt3.jpg 
  349   Sun Mar 2 23:43:45 2008 ranaHowToLSCPD6 responseJohn's PD plotting script is superior to all
of the ones we had before; lets make him
post the script so we can all use it.
  
  360   Wed Mar 5 12:51:48 2008 JohnSummaryLSCInitial Ligo Arm finesse versus lambdaI've taken the coating recipes for the initial
ligo arm cavity from Rana's web page (ligo.caltech/edu/~rana/mat/)
and plotted the finesse as a function of
 FofLambdaLIGOI.jpg 
  367   Mon Mar 10 20:46:41 2008 JohnConfigurationLSCETMY Trans PD & QPDI've placed a 10% reflector in the path from
ETMY to the trans and quadrant photodiodes.
  
  373   Thu Mar 13 02:52:06 2008 LisaConfigurationLSCLocking with 3fToday we have tried to use the reflected signal
demodulated at 3*f1 ~ 99 MHz ([COLOR=chocolate][B]REFL31[/B][/COLOR])
for length control.
  
  381   Fri Mar 14 15:52:07 2008 robConfigurationLSCLSC code change
I've edited the LSC code to send different
signals to the ASS box.  Now, instead of
  
  386   Thu Mar 20 16:06:27 2008 robConfigurationLSCLSC code change
I changed the LSC code again.  I noticed
that when turning off the LSC (e.g., going
  
  396   Sun Mar 23 00:56:42 2008 JohnUpdateLSCMore on 3f We ended our last attempt at 3f locking concerned
about the beam size on PD6. I investigated
tonight. The beam was not obviously overfilling
  
  407   Mon Mar 31 14:01:40 2008 jamieSummaryLSCSummary of DC readout PD non-linearity measurementsFrom March 21-26, I conducted some measurements
of the response non-linearity of some mock-up
DC readout photodetectors.  The detectors
 t21-r21_v_power.png 
  429   Sun Apr 20 18:23:27 2008 ranaSummaryLSClocking attemptsI noticed that the adaptive FF for the MC
had stopped doing anything; this turned out
 quix.png 
  466   Tue May 6 17:28:39 2008 robConfigurationLSCAP33 -> POX33
I am in the process of switching the POX166
and AP33 photodetectors, so that they become
  
  467   Wed May 7 15:25:41 2008 robConfigurationLSCAP33 -> POX33[quote]
I am in the process of switching the POX166
and AP33 photodetectors, so that they become
  
  468   Thu May 8 01:07:24 2008 ranaSummaryLSCFrequency Noise test: MC Trans Backscatter[COLOR=purple][SIZE=4][FONT=Arial]There is
a wandering hump in the MC_F spectrum.[/FONT][/SIZE][/COLOR]
It can move around on the time 
  
  557   Tue Jun 24 15:15:09 2008 JohnSummaryLSCLocking effortsRob, Rana, John

In the past week or so we've been working
 mcl080623.png 
ELOG V3.1.3-