  7488   Fri Oct 5 01:36:49 2012 DenConfigurationPEMchanged PEM DQ channels

    

       
            
  
  7487   Fri Oct 5 00:29:34 2012 DenUpdatePEMreadout box powerGuralp readout box received +13.7 /0/ -15V
instead +15V because of the broken fuse.
Power provided by the source is normal.
  
  7486   Thu Oct 4 23:01:49 2012 RijuparnaConfiguration cavitymode scan Here I am attaching the schematic
diagram of the experimental set-up for IMC
cavitymode scanning. A 30- 45MHz scanning
 diagram1.pdf 
  7485   Thu Oct 4 22:35:16 2012 DenUpdateSUSHow about the slow machines?

    

       
            
  
  7484   Thu Oct 4 22:27:54 2012 KojiUpdateSUSHow about the slow machines?One terrible concern of mine is that the
slow machines were rebooted at the power
  
  7483   Thu Oct 4 22:16:40 2012 DenUpdatePSLPMC is lockedPZT monitor is not lying to us, I've measured
it with a voltmeter. But PMC SERVO is still
interesting. If I break the loop after PMCERR
  
  7482   Thu Oct 4 22:16:28 2012 KojiConfigurationPSLAOM installationDo
more investigation to understand what is
causing the power reduction.
  
  7481   Thu Oct 4 20:57:43 2012 ManasaConfigurationPSLAOM installation

    

       
            
  
  7480   Thu Oct 4 18:48:04 2012 janoschConfigurationPSLAOM installation
  
  7479   Thu Oct 4 17:54:59 2012 ManasaConfigurationPSLAOM installation

    

       
            
  
  7478   Thu Oct 4 14:08:49 2012 jamieUpdateSUSsuspensions dampedAll suspension damping has been restored.   
  7477   Thu Oct 4 14:04:21 2012 jamieUpdateCDSfront ends back upAll the front end machines are back up
after the outage.  It looks like none
of the front end machines came back up once
  
  7476   Thu Oct 4 08:39:58 2012 SteveUpdateGeneralpower outage There had to be a power outage. Laser
and air condition turned back on. The vacuum
 Oct4R2012.png 
  7475   Thu Oct 4 01:06:52 2012 JenneUpdateIOOPZT diagnosis[Koji, Jenne]
We naively hoped that just replacing
the fuses would fix the problem with the
  
  7474   Wed Oct 3 23:36:54 2012 KojiConfigurationPSLAOM installationAfter the AOM work the beam wasn't well
aligned to the PMC. The PMC REFL CCD shows
large misalignment in yaw.
 PMCTRANS.png 
  7473   Wed Oct 3 23:24:05 2012 KojiUpdateSUS MC2 sus damping restored

    

       
            
  
  7472   Wed Oct 3 18:45:51 2012 jamieUpdateIOOwiki page for active IO tip-tiltsI made a wiki
page for the active IO tip-tilts. 
I should have made this a long time ago.
  
  7471   Wed Oct 3 16:52:16 2012 ManasaConfigurationPSLAOM installation{Jan, Manasa}
We set start to check the performance
of the AOM on the PSL table. The AOM driver
  
  7470   Wed Oct 3 16:26:58 2012 ManasaUpdatePEMants on the PSL tableI spotted around 4 within 30 minutes working
at the PSL table even after the deathly spray
  
  7469   Wed Oct 3 15:58:57 2012 SteveConfigurationIOOSOS coil drivers movedThe SOS coil drivers (Atm2) were moved
from 1X1 to 1Y2 location. Is this the best
place to locate the  IOO Tip-Tilt steering
 SOScoildriversTT.jpgIMG_1680.JPG 
  7468   Wed Oct 3 15:37:04 2012 SteveUpdatePEMants on the PSL tableWe observed one or two ants climbing over
PMC optics without booties and safety glasses.
 IMG_1690.JPG 
  7467   Wed Oct 3 11:43:33 2012 SteveUpdateSAFETYsafety trainingDen Martynov received 40m specific safety
training.
  
  7466   Wed Oct 3 07:41:23 2012 SteveUpdateSUS MC2 sus damping restoredThis is the third morning in a row that
the MC2 was tripped.  Would you look
at it Koji?
  
  7465   Tue Oct 2 16:32:43 2012 JenneUpdateIOOPZT diagnosis[Koji, Jenne]
Jamie and I pulled the whole PZT
driver for both PZT1 and PZT2. 
  
  7464   Tue Oct 2 16:15:22 2012 ManasaConfigurationPSLAOM installation

    

       
            
 psl_aom.png 
  7463   Tue Oct 2 15:14:54 2012 jenne, jamieUpdateIOOPZT diagnosispzt2 mod signals matched slider vals for
both pitch and yaw

  pzt2 yaw mon output = 6
 
  
  7462   Tue Oct 2 14:20:33 2012 ManasaConfigurationIOOPDA255 not workingThe PDA255 that Koji repaired is still
not alright. It seems to be saturating again.
I've left it in the PD cabinet where it is
  
  7461   Tue Oct 2 09:13:16 2012 SteveUpdateVACRGA scan at day 7

    

       
            
 pd73md7.png 
  7460   Tue Oct 2 07:45:49 2012 SteveUpdateSUS MC2 & PRM sus damping restored    
  7459   Mon Oct 1 19:21:03 2012 ranaConfigurationPEMchanged PEM DQ channelsChanged the list of channels to be written
to frames from having the IN1 suffix to OUT.
Now we can load the calibration of the channel
  
  7458   Mon Oct 1 17:03:01 2012 steveUpdateSUSETMY oplev relayed

    

       
            
 IMG_1673oplevETMY.jpg 
  7457   Mon Oct 1 16:05:01 2012 jamieUpdateCDSmx stream restart required on all front endsFor some reason the frame builder and mx
stream processes on ALL front ends were down. 
I restarted the frame builder and all the
  
  7456   Mon Oct 1 13:11:43 2012 JenneUpdateIOOPZT inspection elogsI'll come back to the PZTs later, but I
want to write down all the elogs I have found
so far that look relevant.
  
  7455   Mon Oct 1 11:08:25 2012 JenneUpdateIOOMC WFS adjustment

    

       
            
  
  7454   Mon Oct 1 09:02:17 2012 SteveUpdateVACpumpdown reached vacuum normal

    

       
            
 pd73md6.pngpd73md6b.png 
  7453   Mon Oct 1 07:25:48 2012 SteveUpdateSUSMC2 & ETMX sus damping restored    
  7452   Fri Sep 28 21:17:41 2012 KojiUpdateIOOMC WFS adjustmentMC
WFS was fixed. Now it is running constantly
with the autolocker.
 MC_WFS_12h.png 
  7451   Fri Sep 28 07:49:30 2012 SteveUpdate40m UpgradingNew ETMX layout - Version 1.0  Where is IP-ANG ? It is good
practice to use two mirrors at launching
and detecting the beam, so you can walk it
  
  7450   Thu Sep 27 20:05:57 2012 KojiUpdate40m UpgradingNew ETMX layout - Version 1.01. I wonder how the mode profiling/matching
was considered in the new layout.

I can see the distances between the
  
  7449   Thu Sep 27 19:03:06 2012 ManasaUpdate40m UpgradingNew ETMX layout - Version 1.0 I am working towards redesigning
the endtables. I've attached the first version
of the layout. As per Steve's comment I've
 ETMX_OldNew.png 
  7448   Thu Sep 27 17:00:41 2012 Eric GustafsonUpdateLSC40 meter photodiode frequency response measurement system installationMike and I installed all of the telescopes
and launching hardware for REFL11, REFL33,
REFL55, AS55, MCRef, POX11 and POP55. On
  
  7447   Thu Sep 27 16:26:11 2012 SteveUpdateLSCRF fibre protection in cable trays

    

       
            
  
  7446   Thu Sep 27 15:21:04 2012 SteveUpdateSUSTT height adaptor & PTICH damping

    

       
            
 09271201.PDFIMG_1656.JPGIMG_1654.JPG 
  7445   Thu Sep 27 13:05:55 2012 Eric GustafsonUpdateLSC40 meter photodiode frequency response measurement system installationJenne, Mike and   
  7444   Wed Sep 26 23:55:14 2012 JenneUpdateIOOWFS centeredSince the MC spots are good, I put the
beam back on WFS 1 and WFS 2.
Also, I changed the indicators on
  
  7443   Wed Sep 26 17:09:15 2012 DenUpdateSUSTT  [Koji, Steve, Den]
TT alignment is fine, yaw damping
is satisfactory, pitch damping is slow. We
  
  7442   Wed Sep 26 16:59:30 2012 jamieUpdateIOOIPANG ND filter installed

    

       
            
  
  7441   Wed Sep 26 11:03:04 2012 SteveUpdateVACpumpdown completed The new cold cathode gauge CC1 is
in place. We were at atmosphere for 28 days
......more later
 40mpd73md1.png28datm.png 
  7440   Wed Sep 26 01:10:34 2012 JenneUpdateIOOPZT2 not working?!?! MC back to normal[Jenne, Evan, Den]
MC REFL beam is back on the PD,
and the mode cleaner locks.  It
  
  7439   Tue Sep 25 22:40:55 2012 JenneUpdateIOOIPANG ND filter installed[Jenne, Evan Hall]
Both IPPOS and IPANG beams are (after
turning on the input and output PZTs) hitting
  