40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 192 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  272   Sat Jan 26 02:08:53 2008 JohnOmnistructureLSCFibresThere is now a fibre running from the SP table
to the ISCT at the Y-end. In the coming days
I will try to mode match the beam from this
  
  296   Mon Feb 4 22:01:57 2008 JohnSummaryLSCFibres auxiliary locking - FibersI managed to couple ~75% of the light transmitted
from the y arm, through the fibre, back to
the SP table. I hoped that this would be
  
  315   Wed Feb 13 20:37:11 2008 JohnUpdateLSCFibre locking - FiberSam and I observed fringes in the light reflected
from the Y arm. These fringes are due to
the sidebands and not the carrier. To improve
  
  342   Wed Feb 27 22:05:03 2008 JohnUpdateLSCAuxiliary lockingA summary of the status of the auxiliary arm
locking effort.
  
  348   Fri Feb 29 13:51:17 2008 JohnSummaryLSCPD6 responseI checked the response of PD6 using the AM
laser. It looks happy enough.[IMG]elog:348/1[/IMG]
 PD6Attempt3.jpg 
  349   Sun Mar 2 23:43:45 2008 ranaHowToLSCPD6 responseJohn's PD plotting script is superior to all
of the ones we had before; lets make him
post the script so we can all use it.
  
  360   Wed Mar 5 12:51:48 2008 JohnSummaryLSCInitial Ligo Arm finesse versus lambdaI've taken the coating recipes for the initial
ligo arm cavity from Rana's web page (ligo.caltech/edu/~rana/mat/)
and plotted the finesse as a function of
 FofLambdaLIGOI.jpg 
  367   Mon Mar 10 20:46:41 2008 JohnConfigurationLSCETMY Trans PD & QPDI've placed a 10% reflector in the path from
ETMY to the trans and quadrant photodiodes.
  
  373   Thu Mar 13 02:52:06 2008 LisaConfigurationLSCLocking with 3fToday we have tried to use the reflected signal
demodulated at 3*f1 ~ 99 MHz ([COLOR=chocolate][B]REFL31[/B][/COLOR])
for length control.
  
  381   Fri Mar 14 15:52:07 2008 robConfigurationLSCLSC code change
I've edited the LSC code to send different
signals to the ASS box.  Now, instead of
  
  386   Thu Mar 20 16:06:27 2008 robConfigurationLSCLSC code change
I changed the LSC code again.  I noticed
that when turning off the LSC (e.g., going
  
  396   Sun Mar 23 00:56:42 2008 JohnUpdateLSCMore on 3f We ended our last attempt at 3f locking concerned
about the beam size on PD6. I investigated
tonight. The beam was not obviously overfilling
  
  407   Mon Mar 31 14:01:40 2008 jamieSummaryLSCSummary of DC readout PD non-linearity measurementsFrom March 21-26, I conducted some measurements
of the response non-linearity of some mock-up
DC readout photodetectors.  The detectors
 t21-r21_v_power.png 
  429   Sun Apr 20 18:23:27 2008 ranaSummaryLSClocking attemptsI noticed that the adaptive FF for the MC
had stopped doing anything; this turned out
 quix.png 
  466   Tue May 6 17:28:39 2008 robConfigurationLSCAP33 -> POX33
I am in the process of switching the POX166
and AP33 photodetectors, so that they become
  
  467   Wed May 7 15:25:41 2008 robConfigurationLSCAP33 -> POX33[quote]
I am in the process of switching the POX166
and AP33 photodetectors, so that they become
  
  468   Thu May 8 01:07:24 2008 ranaSummaryLSCFrequency Noise test: MC Trans Backscatter[COLOR=purple][SIZE=4][FONT=Arial]There is
a wandering hump in the MC_F spectrum.[/FONT][/SIZE][/COLOR]
It can move around on the time 
  
  557   Tue Jun 24 15:15:09 2008 JohnSummaryLSCLocking effortsRob, Rana, John

In the past week or so we've been working
 mcl080623.png 
  583   Fri Jun 27 15:20:52 2008 robDAQLSC.ini file change
I removed C1:LSC-XARM_CTRL from the frames
and added C1:LSC-CARM_ERR
  
  690   Thu Jul 17 13:08:37 2008 JohnSummaryLSCHOM resonances in the armsOn Tuesday night we attempted to lock the
full DRFPMI in the optical spring configuration
with the +f2 sideband resonant in the SRC.
 HOMresonances.png 
  717   Tue Jul 22 22:11:58 2008 YoichiUpdateLSCX-arm g factor measurementAlberto, Yoichi

We measured the g factor of the X-arm by
  
  718   Tue Jul 22 22:25:31 2008 ranaUpdateLSCLooptickle for existing 40mJohn and I have adapted the Stefan-Looptickle
model of the 40m upgrade to have the parameters
of the old one.
 nb.png 
  728   Wed Jul 23 22:34:07 2008 YoichiUpdateLSCArm cavity g-factor measurementI tried the same thing as the X-arm to the
Y-arm.
I'm puzzled. I found exactly the same behavior
  
  729   Thu Jul 24 01:04:01 2008 robConfigurationLSCIFR2023A (aka MARCONI) settings[quote]

P.S.: We made a test by changing the frequency
  
  730   Thu Jul 24 01:27:00 2008 KojiUpdateLSCArm cavity g-factor measurement[quote]I locked the Y-arm and mis-aligned
the end mirror in Yaw until the transmission
power gets half.
  
  731   Thu Jul 24 02:57:26 2008 robUpdateLSCArm cavity g-factor measurement[quote]
So, now I feel that the method for the TEM01
quest should be reconsidered.
  
  733   Thu Jul 24 08:09:26 2008 YoichiUpdateLSCArm cavity g-factor measurement[quote]
A-ha! Do you always expect the 30Hz signal,
don't you?
  
  771   Wed Jul 30 15:28:08 2008 robUpdateLSCY arm locked
By using a combination of the SUS-DRIFT mon
screen and the optical levers (which turned
  
  830   Tue Aug 12 21:38:19 2008 JohnUpdateLSCAccidental higher order mode resonances in the armsRecently we had been having some trouble locking
the full IFO in the [COLOR=green][I][FONT=Verdana]spring[/FONT][/I][/COLOR]
configuration (SRC on [COLOR=blue]+166[/COLOR]).
 HOMresonances.pngHOMarms2.m 
  883   Mon Aug 25 21:15:23 2008 ranaConfigurationLSCaux NPRO off[FONT=Comic Sans MS][COLOR=purple]Looks like
no one has used the Lightwave NPRO on the
AS table after Koji left, so I turned it
  
  1028   Mon Oct 6 12:45:41 2008 AlbertoDAQLSCC1LSC in comaAlberto, Joe,

The C1LSC medm screen is frozen and the C1LSC
  
  1029   Mon Oct 6 16:41:33 2008 AlbertoDAQLSCC1LSC in coma[quote]Alberto, Joe,

The C1LSC medm screen is frozen and the C1LSC
  
  1097   Tue Oct 28 11:10:18 2008 AlbertoUpdateLSCHigher Order Mode resonances in the X arms[quote]Recently we had been having some trouble
locking the full IFO in the [COLOR=green][I][FONT=Verdana]spring[/FONT][/I][/COLOR]
configuration (SRC on [COLOR=blue]+166[/COLOR]).
 HOM_resonances_Xarm.png 
  1115   Wed Nov 5 12:41:36 2008 AlbertoUpdateLSCAbsolute Length and g-factor measurements conclusions[SIZE=4][B][COLOR=green]Absolute Length and
g-Factor Measurement for the 40m Arm Cavities,
Summary of Results[/COLOR][/B][/SIZE]
 2008-11-04_file_02-05.pngHOM_resonances_Xarm.pngHOM_resonances_Yarm.png 
  1197   Fri Dec 19 16:38:09 2008 steveUpdateLSCall optlevs centeredAll optlevs were centered after full alignment.

Qpd sums are:
  
  1214   Fri Jan 2 18:49:54 2009 YoichiUpdateLSCLSC modulation frequencies adjustedI noticed that the IFO did not lock in the
MICH configuration.
This was because AS166Q signal was too small.
  
  1223   Mon Jan 12 18:53:03 2009 YoichiUpdateLSCAS CCD centering and ASDD demod phaseAfter Rob's AS beam work, I centered the beam
on the AS CCD.
I also optimized the ASDD demod-phase for
  
  1225   Tue Jan 13 18:59:09 2009 KakeruUpdateLSCAS CCD centering and ASDD demod phaseI tuned the demod-phase for PRCL and SRCL
hand-off, but it have not been optimized
enoughly.
  
  1233   Fri Jan 16 18:25:32 2009 Yoichi, Kakeru, RanaUpdateLSCArms were unstableThe single arm lock had been unstable for
both arms in the past few days.
 TRXY.pdfErrorSignals.pdfcoherenceBetweenArms.pdfArmPowersAfterPDwasCentered.pdf 
  1241   Wed Jan 21 16:18:17 2009 KakeruUpdateLSCAS CCD centering and ASDD demod phaseI tuned the DD demod-pahse for SRM.
It was tuned as the error singnal is to be
0 when the cavity is locked.
  
  1242   Wed Jan 21 22:53:08 2009 ranaUpdateLSCAS CCD centering and ASDD demod phaseJust my opinion, but I think all we want out
of the DD signals is something to control
the DRM
  
  1285   Mon Feb 9 16:05:01 2009 YoichiUpdateLSCDRMI OKAfter the ISS work, I aligned the IFO and
confirmed that DRMI locks with good SPOB
and AS166 values.
  
  1296   Thu Feb 12 11:21:54 2009 YoichiUpdateLSCLocking effort resumedLast night, I restarted the locking work.
Quite some time was wasted by the disconnected
REFL199 by Alberto for the cavity length
  
  1298   Thu Feb 12 17:43:33 2009 YoichiUpdateLSCSRC strangeness solvedI found the problem with the DRMI lock I had
last night was caused by the zero gain in
the PD11_I filter.
  
  1301   Fri Feb 13 13:35:38 2009 YoichiUpdateLSCLocking statusYoichi, Jenne, Alberto, Rob

Last night, the locking proceeded until the
  
  1304   Sat Feb 14 16:53:26 2009 robUpdateLSCLocking status[quote]Yoichi, Jenne, Alberto, Rob

Last night, the locking proceeded until the
  
  1305   Sun Feb 15 09:35:00 2009 YoichiUpdateLSCLocking status[quote]
I found a '$<' in the offloadMCF script.
 I don't know precisely what that construct
  
  1306   Sun Feb 15 15:53:21 2009 RobUpdateLSCLocking status[quote]
  I didn't get a chance to do much testing
since the sus controller (susvme1) went nuts.
  
  1308   Mon Feb 16 10:18:13 2009 AlbertoUpdateLSCFE system rebooted[quote][quote]
  I didn't get a chance to do much testing
since the sus controller (susvme1) went nuts.
  
  1309   Mon Feb 16 14:12:21 2009 YoichiUpdateLSCFE system rebooted[quote]
I can't restart the MC autolocker on c1susvme2
because it doesn't let me ssh in. I tried
  
ELOG V3.1.3-