40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 18 of 355
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17705 Entries
Goto page
Previous
1
,
2
,
3
...
17
, 18,
19
...
353
,
354
,
355
Next
Tue May 31 16:07:57 2011, Larisa Thorne, Configuration, Electronics, Seismometer Box Update
Mon Jun 6 17:22:09 2011, valera, Configuration, LSC, Clipping in the X arm 1064 um trans path
Mon Jun 6 23:56:16 2011, rana, valera, Configuration, SUS, ETMX/ETMY OSEM whitening
Mon Jun 13 19:26:42 2011, Jamie, Joe, Configuration, CDS, SUS binary IO chassis 2 and 3 moved from 1X5 to 1X4
Tue Jun 14 09:24:36 2011, steve, Configuration, Photos, SUS binary IO chassis 2 and 3 moved from 1X5 to 1X4
Fri Jun 17 00:17:26 2011, rana, Configuration, Electronics, 2 RFPDs sent to LLO
Fri Jun 24 22:35:23 2011, rana, Configuration, CDS, dataviewer broken on pianosa
Thu Jun 30 21:55:16 2011, rana, Configuration, DAQ, NDS2 conf change
Mon Jul 11 10:10:31 2011, Ishwita, Configuration, , AA board
Sat Jul 16 18:54:05 2011, Ishwita, Manuel, Configuration, Electronics, AA board
Wed Jul 27 15:49:13 2011, jamie, Configuration, CDS, dataviewer now working on pianosa
Fri Aug 12 16:42:51 2011, Yoichi, Configuration, LSC, LSC Feed Forward Compensator
Fri Aug 12 16:50:37 2011, Yoichi, Configuration, CDS, FE Status screen rearranged
Fri Aug 12 17:05:22 2011, Manuel, Ishwita, Configuration, PEM, STS2 Cable configuration
Mon Aug 22 20:37:43 2011, Anamaria, Configuration, RF System, Plan for install of 3f PDs
Mon Aug 29 16:27:34 2011, Manuel, Configuration, SUS, SUS Summary Screen
Mon Sep 12 18:45:04 2011, Anamaria, Configuration, LSC, AP table current layout
Mon Sep 12 23:45:14 2011, Suresh, Configuration, Computer Scripts / Programs, StripTool does not scale properly on Pianosa
Wed Sep 14 01:19:20 2011, Anamaria, Configuration, LSC, 3f PD Install in Progress
Tue Sep 20 20:58:35 2011, Anamaria, Configuration, LSC, New AP Table Drawing
Fri Oct 7 22:41:05 2011, Koji, Configuration, General, Script backup fixed
Tue Oct 18 21:19:18 2011, rana, Configuration, IOO, WFS disabled in SUS
Tue Oct 18 22:47:09 2011, Suresh, Configuration, IOO, MC autolocker script edited to shutdown and restart WFS loops
Mon Nov 14 21:22:48 2011, rana, Configuration, Computers, primetime RSYNC slowing down NODUS
Wed Nov 23 14:47:14 2011, Jenne, Configuration, Environment, AC in the IFO room was off
Wed Dec 21 14:23:08 2011, rana, Configuration, SUS, Hysteresis in suspensions?
Thu Jan 12 21:22:16 2012, Leo Singer, Configuration, WIKI-40M Update, Unable to create Wiki page
Thu Jan 12 23:13:42 2012, Koji, Configuration, WIKI-40M Update, Unable to create Wiki page
Sat Jan 14 00:50:08 2012, rana, koji, Configuration, IOO, Towards coating thermal noise measurement with RefCav / MC beat
Tue Jan 17 03:10:27 2012, kiwamu, Configuration, IOO, rotated lambda/2 plate
Fri Feb 3 19:54:21 2012, rana, Configuration, IOO, MC trans awry
Fri Feb 3 19:57:26 2012, rana, Configuration, SUS, PSL Shutter closed for SUS hysteresis test
Fri Feb 3 20:58:56 2012, Steve, Configuration, General, Illuminator Picture
Mon Mar 5 23:47:15 2012, keiko, Configuration, LSC, ND2 at REFL OSA
Tue Mar 6 16:06:15 2012, Jenne, Configuration, SUS, PRM watchdog tripped
Thu Mar 15 04:04:23 2012, Koji, Configuration, Locking, PRC Matching issues
Tue Mar 27 21:37:51 2012, keiko, Configuration, IOO, Beam Profile measurement: IPPOS beam
9x
Thu Mar 29 20:13:21 2012, jamie, Configuration, PEM, PEM_SLOW (i.e. seismic RMS) channels added to fb master
Wed Apr 4 13:25:29 2012, jamie, Configuration, PEM, PEM_SLOW (i.e. seismic RMS) channels aquiring
Thu Apr 5 18:24:55 2012, Den, Configuration, Adaptive Filtering, oaf starts to work
Tue May 22 11:45:12 2012, Jamie, Configuration, CDS, Please remember to commit SVN changes
Fri May 25 16:58:54 2012, Jamie, Configuration, Computers, .bashrc for workstations
Tue Jun 12 13:49:32 2012, Jamie, Configuration, Computer Scripts / Programs, tconvert
Mon Jul 9 16:28:13 2012, Masha, Configuration, General, Seismometer repositioning
Tue Jul 10 10:50:02 2012, Jamie, Configuration, General, Seismometer repositioning
Tue Jul 31 15:33:17 2012, Masha, Configuration, PEM, Gurlap Pin Map
Thu Aug 2 22:52:23 2012, Masha, Configuration, PEM, STS, GUR2, and Trillium in isolation box.
Wed Aug 8 19:54:06 2012, Manasa, Configuration, IOO, MC trans optics configured
Wed Aug 8 22:12:30 2012, rana, Configuration, IOO, MC trans optics configured
Wed Aug 8 22:17:43 2012, Manasa, Configuration, IOO, MC trans optics configured
Goto page
Previous
1
,
2
,
3
...
17
, 18,
19
...
353
,
354
,
355
Next
ELOG V3.1.3-