Wed Jul 16 15:26:48 2014 |
Steve | Update | PSL | PSL Innolight controller fan is dying |
Quote: |
Quote: |
Also, while I was working on the PSL table, I heard noise that sounded like a bearing rolling around. I suspected the HEPAs, since the one on the north east corner of the table has a problem when it's turned up high (we've known about this for a long time), however turning off the HEPAs didn't affect the noise. The noise is strongest near the back of the PSL controller on the shelf above the table, and the PSL controller box is vibrating. So, I suspect that the fan on the PSL controller box is about to give out.
EDIT: To clarify, I mean the Innolight's controller.
|
The bearing is chirping in the back of the 2W Innolight laser controller. It is loud enough to hear it. I placed 4 soft rubber feet under the controller to avoid shaking other things on self.
The HEPA filter bearing becomes noisy at 50V
Keep it at 20V for low noise
|
The fan is dying. It is changing speed erratically and stops for short time periods. It is very likely to stop rotating soon. It will halt all operations in the lab. We can not see the PMC-T power because Manasa is working on
AOM alignment.
|
10220
|
Wed Jul 16 21:23:35 2014 |
Manasa | Update | PSL | PSL Innolight controller fan is dying |
[Koji, Manasa]
The air flow from the dying fan was kinda weak and we decided to give a help with an external fan.
Koji brought a fan taken from a junk found at EE shop in W.Bridge.
The fan has been tied to the cage of the existing fan using cable ties to provide air circulation.
So even if the existing one dies anytime, we still don't super-heat anything.
The power supply for the fan rests next to the controller.
The air from the fan ventilation was hot, and now with the additional fan this hot air is actually sucked
out with stronger flow. So this is relieving for now. |
Attachment 1: IMG_1659.JPG
|
|
Attachment 2: IMG_1658.JPG
|
|
10231
|
Thu Jul 17 17:19:25 2014 |
Steve | Update | PSL | PSL Innolight controller fan is dying with extra fan |
Quote: |
[Koji, Manasa]
The air flow from the dying fan was kinda weak and we decided to give a help with an external fan.
Koji brought a fan taken from a junk found at EE shop in W.Bridge.
The fan has been tied to the cage of the existing fan using cable ties to provide air circulation.
So even if the existing one dies anytime, we still don't super-heat anything.
The power supply for the fan rests next to the controller.
The air from the fan ventilation was hot, and now with the additional fan this hot air is actually sucked
out with stronger flow. So this is relieving for now.
|
PMC transmission as an indicator of laser controller with extra fan solution: 8 and 1day plot |
Attachment 1: fanadded.png
|
|
9998
|
Wed May 28 11:55:16 2014 |
Steve | Update | PSL | PSL Innolight controller fan is noisy |
Quote: |
Also, while I was working on the PSL table, I heard noise that sounded like a bearing rolling around. I suspected the HEPAs, since the one on the north east corner of the table has a problem when it's turned up high (we've known about this for a long time), however turning off the HEPAs didn't affect the noise. The noise is strongest near the back of the PSL controller on the shelf above the table, and the PSL controller box is vibrating. So, I suspect that the fan on the PSL controller box is about to give out.
EDIT: To clarify, I mean the Innolight's controller.
|
The bearing is chirping in the back of the 2W Innolight laser controller. It is loud enough to hear it. I placed 4 soft rubber feet under the controller to avoid shaking other things on self.
The HEPA filter bearing becomes noisy at 50V
Keep it at 20V for low noise |
Attachment 1: 2WinnoRFan.jpg
|
|
10295
|
Wed Jul 30 09:51:18 2014 |
Steve | Update | PSL | PSL Innolight controller fan is noisy |
Quote: |
The bearing is chirping in the back of the 2W Innolight laser controller. It is loud enough to hear it. I placed 4 soft rubber feet under the controller to avoid shaking other things on self.
The HEPA filter bearing becomes noisy at 50V
Keep it at 20V for low noise
|
Hello Steve,
I’ve received some fan pictures from our manufacturing center. Your system will have one of the two fans pictured. Please contact manufacture company for more information.
http://www.sunon.com/index.php
Best Regards,
Agustin (TJ) Tijerina
Commercial Product Support Center
Coherent, Inc.
5100 Patrick Henry Dr., Santa Clara, Ca. 95054
Product Support: (800) 367-7890
product.support@coherent.com
www.coherent.com
Finally we got it!
The fans are ordered. |
9397
|
Fri Nov 15 14:08:13 2013 |
manasa | Update | PSL | PSL Innolight shuts down again |
Quote: |
I have just turned on the PSL Innolight laser. The laser shut down with unknown reason a day ago.
|
PSL NPRO shut down again today for reasons unknown. I was working near the IOO rack and noticed there was no light at both the refl and trans PMC cameras. Jenne and I checked the PSL and found the 'OFF' red switch on the laser driver lit up. Switching ON the green button brought the laser back. PMC and MC autolocked after this. |
12021
|
Fri Mar 4 13:52:41 2016 |
ericq | Update | IOO | PSL Laser Opened |
PSL Table doors were open, and the laser shutter was closed.
Doors have been closed, laser has been opened. |
12022
|
Sat Mar 5 10:37:48 2016 |
rana | Update | IOO | PSL Laser Opened |
Sorry, that was me; taking some photos of the PSL and EX mirrors.
Quote: |
PSL Table doors were open, and the laser shutter was closed.
Doors have been closed, laser has been opened.
|
|
11759
|
Thu Nov 12 16:00:55 2015 |
ericq | Update | IOO | PSL Laser turned back on |
We found the PSL laser switched off. Looking at the wall StripTool, it looks like this happened about 4 hours ago. Gautam was working at and around the PSL table, and I suspect he accidently ran into the Big Red Button.
We turned the laser back on. |
12918
|
Thu Mar 30 00:16:09 2017 |
gautam | Update | PSL | PSL NPRO PZT calibration |
As part of the ongoing effort to try and calibrate the PMC DAQ channels into physical units, I tried to get a calibration for the PSL NPRO PZT actuator gain. In order to do this, I selected "Blank" on the PMC servo MEDM screen such that there was no feedback signal to the PMC PZT for length control. Then I used the summing box right before the PSL PZT to inject a ~1Hz triangular wave, 4Vpp. This was sufficient to sweep the NPRO frequency over 70MHz such that both sidebands and the carrier go through resonances in the PMC cavity. I then simultaneously monitored the applied triangular wave voltage and the PMC error signal (using the single pin LEMO connector on the front panel) on an oscilloscope. Analysis is underway, but a quick look at one measurement suggests a PZT actuator gain of ~1.44MHz/V, which is close to what we expect for the Innolight NPROs. The idea is to use this calibration to convert the DQ channels into physical units.
Details + plots + error analysis to follow... |
12925
|
Mon Apr 3 17:25:13 2017 |
gautam | Update | PSL | PSL NPRO PZT calibration |
Summary:
By sweeping the laser frequency and looking at the PMC PDH error signal, I have determined the 2W Mephisto Innolight PZT actuator gain to be 1.47 +/- 0.04 MHz/V.
Method:
- Re-aligned the input beam into the PMC to maximize transmission level on the oscilloscope on the PSL table to 0.73V.
- Disabled control signal from IMC servo to PSL.
- Unlocked the PMC and disabled the loop by selecting "BLANK" on the PMC MEDM screen.
- Connected a 0.381 Hz 5Vpp triangular wave with SR function generator to the "SUM" input of the Fast I/F box just before the PSL PZT input. These params were chosen considering the Pomona box just before the NPRO has a corner at 2.9Hz, and also to sweep the voltage to the NPRO PZT over the full 150V permitted by the Thorlabs HV amplifier unit. Monitored the voltage to the Thorlabs HV amp from the "AFTER SUM" monitor point on the same box. Monitored the PMC PDH error signal using the single-pin LEMO monitor point on the PMC servo board (call this Vmon). Both of these signals were monitored using a Tektronix digital O'scope.
- Downloaded the data using ethernet.
- Fit a line to the voltage applied to the NPRO PZT - I assumed the actual voltage being applied to the PZT is 15*Vmon, the pre-factor being what the Thorlabs HV amplifier outputs. The zero crossings of the sideband resonances in the PDH error signal are separated by 2*fmod (separated by fmod from the carrier resonance, fmod = 35.5MHz assumed). With this information, the x-axis of the sweeps can be converted to Hz, from which we get the PZT actuator gain in MHz/V.
An example of the data used to calculate the actuator gain (left), and the spread of the calculated actuator gain (right - error bars calculated assuming 5e-4 s uncertainty in the sideband zero-crossing interval, and using the error in the slope of the linear fit to the sweep voltage):
 
This will now allow calibration of the PMC DAQ channels into Hz.
GV 4 April - The y-axis of the lower plot in Attachment #1 has mis-labelled units. It should be [V], not [MHz/V]. |
Attachment 1: PDHerr.pdf
|
|
Attachment 2: NPROcalib.pdf
|
|
12928
|
Tue Apr 4 17:27:58 2017 |
rana | Update | PSL | PSL NPRO PZT calibration |
good cal. I wonder if this data also gives us a good measurement of the cavity pole or if the photo-thermal self-locking effect ruins it. You should look at the data for the positive sweeps and negative sweeps and see if they give the same answer for the cavity poles. Also, maybe we can estimate the PMC cavity pole using the sidebands as well as the carrier and see if they give the same answer? |
13137
|
Mon Jul 24 12:00:21 2017 |
gautam | Update | PSL | PSL NPRO mysteriously shut off |
Summary:
At around 10:30AM today morning, the PSL mysteriously shut off. Steve and I confirmed that the NPRO controller had the RED "OFF" LED lit up. It is unknown why this happened. We manually turned the NPRO back on and hte PMC has been stably locked for the last hour or so.
Details:
There are so many changes to lab hardware/software that have been happening recently, it's not entirely clear to me what exactly was the problem here. But here are the observations:
- Yesterday, when I came into the lab, the MC REFL trace on the wall StripTool was 0 for the full 8 hour history - since we don't have data records, I can't go back further than this. I remember the PMC TRANS and REFL cameras looked normal, but there was no MC REFL spot on the CCD monitors. This is consistent with the PSL operating normally, the PMC being locked, and the PSL shutter being closed. Isn't the emergency vacuum interlock also responsible for automatically closing the PSL shutter? Perhaps if the turbo controller failure happened prior to Jamie/me coming in yesterday, maybe this was just the interlock doing its job. On Friday evening, the PSL shutter was certainly open and the MC REFL spot was visible on the camera. I also confirmed with Jamie that he didn't close the shutter.
- Attachment #1 shows the wall StripTool traces from earlier this morning. It looks like ~7.40AM, the MC REFL level went back up. Steve says he didn't manually open the shutter, and in any case, this was before the turbo pump controller failure was diagnosed. So why did the shutter open again?
- When I came in at ~10AM, the CCD monitor showed that the PMC was locked, and the MC REFL spot was visible.
- Also on attachment #1, there is a ~10min dip in the MC REFL level. This corresponds to ~10:30AM this morning. Both Steve and I were sitting in the control room at this time. We noticed that the PMC TRANS and REFL CCDs were dark. When we went in to check on the laser, we saw that it was indeed off. There was no one inside the lab area at this time to our knowledge, and as far as I know, the only direct emergency shutoff for the PSL is on the North-West corner of the PSL enclosure. So it is unclear why the laser just suddenly went off.
Steve says that this kind of behaviour is characteristic of a power glitch/surge, but nothing else seems to have been affected (I confirmed that the X and Y end lasers are ON). |
Attachment 1: IMG_7454.JPG
|
|
15642
|
Fri Oct 23 19:01:57 2020 |
Koji | Summary | PEM | PSL Particle Counter kit removed from the table |
The particle counter on the 40m PSL was removed. The package was made together with the OMC lab particle counter (see the packing list below).
The kit was picked up by Radhika for a python code to read out the numbers.
=== Packing List ===
- MET ONE 227A particle counter
- used at the 40m. It has the particle reading and the temperature reading.
- Power supply adapter (AC/DC) for 227A
- Caution: It is not compatible with GT-321.
- MET ONE GT-321
- I found another type of particle counter in West Bridge.
- Power supply adapter (AC/DC) for GT-321. (Labeled "for GT-321")
- Caution: It is not compatible with 227A.
- DB9 cable for GT-321
- Air Filter G3111
- When you run a particle counter attach this filter instead of the dust collecting cup to keep the air in take of the particle counter clean. This should keep the particle level down to zero.
|
Attachment 1: P_20201022_173529.jpg
|
|
Attachment 2: P_20201022_173419.jpg
|
|
7070
|
Wed Aug 1 15:14:20 2012 |
Jenne | Update | IOO | PSL Pointing QPD signals lost in late-June 2012 |
I was looking into why we don't have any light on the PSL pointing QPDs, and it turns out that it has been this way since ~June 29th 2012. I need to look back in the elog to see what was going on on the PSL table that day, but I suspect it has something to do with Yuta and I, working on the beat setup, since this is all very near that area.
Attached is a plot of the loss of signal on the QPDs.
UPDATE:
We lost IP POS on the same day as we lost the PSL pointing. See 2nd attachment. The _S_Calc is the sum, and it almost looks like the light got near the edge of the diode and just kept falling off until it was gone. The sum started getting lower on May 16th, and then was gone on June 29th.
So far I've gone back as far as Jan 2012, but I still haven't found any data where we *did* have light on IP ANG. Sad.
UPDATE, UPDATE (like P.P.S.): June 29th was the day of the vent...see elog 6895. |
Attachment 1: IOO_QPDs_lost_midJune2012.png
|
|
Attachment 2: IP_QPDs_lost_midJune2012.png
|
|
778
|
Fri Aug 1 01:13:32 2008 |
rana | Configuration | PSL | PSL Quad change and new script |
Koji and I changed a few optics so that now ~60% of the beam that went to the PSL POS QPD
now goes to the west side of the table for the aux. laser locking PLL. The beam is sort of
on the QPD again but needs a centering.
After this work I wrote a script SUS/freeswing-all.csh which puts a 30000 count offset into
the UL coil of each suspension and then disables it. This is just good enough to kick it up
so that the eigenfrequency can be measured. I ran it and it worked -- it finished running at
Fri Aug 1 00:44:30 PDT 2008 |
781
|
Fri Aug 1 16:33:52 2008 |
rana | Configuration | PSL | PSL Quad change and new script |
Here's the sensor ringdown trend from the kick. |
Attachment 1: Untitled.png
|
|
15243
|
Tue Mar 3 17:59:33 2020 |
Yehonathan | Update | Electronics | PSL Shutter and PMC TRANSPD working |
I used existing BNC cables running from the PSL table to the PSL rack and reassigned them to the PSL Shutter and PMC transmission PD channels.
The PSL shutter turned out to be a sinking channel. Jordan reconnected the PSL shutter wires to a sinking BIO Acromag. Channel list is updated.
Both channels have been tested to be working as expected.
gautam add on about EPICS:
- the PSL shutter channels were previously hosted on c1aux.
- I didn't comment out the original database entries on c1aux because we changed the prefix for all these channels - i.e. C1:AUX-PSL_Shutter --> C1:PSL-PSL_Shutter.
- Modified the LSC offset script to close/open the PSL shutter by writing to the correct channel now.
- there is some EPICS logic that checks the main volume pressure and prevents the opening of the PSL shutter if the main volume pressure is between 0.003 torr and 500 torr. I preserved this capability (so there are some associated soft channels in the database as well).
P.S - there is a problem we noticed - if the modbus process is started with the local subnet not having a fixed IP address, then all the EPICS channels will not be responsive. The way to fix this is to run the following sequence of commands:
sudo systemctl stop modbusIOC.service
sudo ifdown enp4s0
sudo ifup enp4s1
sudo ssytemctl start modbusIOC.service |
15255
|
Thu Mar 5 15:03:48 2020 |
Yehonathan | Update | Electronics | PSL Shutter and PMC TRANSPD working |
[Jon, Yehonathan]
Summary
With the Acromag chassis now permanently installed, we tested the C1PSL channels going over the channel list one by one, excluding the IMC channels which Gautam is taking responsibility for (the servo board itself is also in question).
The strategy is to check the response of input channels to specific output channels for expected behaviour whenever is possible.
We marked on the channel list spreadsheet the status of the channels that were tested.
In more detail
FSS
Channels under test |
What was done |
C1:PSL-FSS_SW1 |
Switched C1:PSL-FSS_SW1 and observed the IMC unlock |
C1:PSL-FSS_SW2, C1:PSL-FSS_MIXERM |
Connected a signal to Test2 on FSS box and observed a proportional change on C1:PSL-FSS_MIXERM |
C1:PSL-FSS_INOFFSET |
Disconnected feedback by switching C1:PSL-FSS_SW1. Tweaked C1:PSL-FSS_INOFFSET and observed a proportional response in C1:PSL-FSS_MIXERM |
C1:PSL-FSS_MGAIN, C1:PSL-FSS_PCDRIVE |
Disconnected feedback, turned on some offset using C1:PSL-FSS_INOFFSET. Tweaked C1:PSL-FSS_MGAIN and observed a response in C1:PSL-FSS_PCDRIVE |
C1:PSL-FSS_SLOWDC, C1:PSL-FSS_SLOWM |
Disconnected feedback. Tweaked C1:PSL-FSS_SLOWDC and obsereved a proportional response in C1:PSL-FSS_SLOWM |
C1:PSL-FSS_FASTGAIN, C1:PSL-FSS_FAST |
Disconnected feedback, turned on some offset using C1:PSL-FSS_INOFFSET. Tweaked C1:PSL-FSS_FASTGAIN and obsereved a response in C1:PSL-FSS_FAST |
Frequency Ref
Channels under test |
What was done |
C1:PSL-PMC_PHCON |
Observed the PMC unlocks when a big change in C1: PSL-PMC_PHCON is made |
C1:PSL-PMC_RFADJ, C1:PSL-PMC_MODET |
Tweaked C1:PSL-PMC_RFADJ and obsereved a proportional response in C1:PSL-PMC_MODET |
C1:PSL-PMC_PHFLIP |
Observed the PMC unlock when C1:PSL-PMC_PHFLIP is switched |
PMC Servo Card
Channels under test |
What was done |
C1:PSL-PMC_SW1, C1:PSL-PMC_PMCERR, C1:PSL-PMC_INOFFSET, C1:PSL-PMC_PZT |
Unlocked the PMC by switching C1:PSL-PMC_SW1. Tweaked C1:PSL-PMC_INOFFSET and observed a proportional change in C1:PSL-PMC_PMCERR and C1:PSL-PMC_PZT |
C1:PSL-PMC_BLANK |
Observed the PMC unlock with when C1:PSL-PMC_BLANK is switched |
C1:PSL-PMC_GAIN |
Unlocked the PMC by switching C1:PSL-PMC_SW1. Turned on some offset using C1:PSL-PMC_INOFFSET. Tweaked C1:PSL-PMC_GAIN and observed response in C1:PSL-PMC_PZT |
C1:PSL-PMC_SW2 |
Unlocked the PMC by switching C1:PSL-PMC_SW1. Connected a signal to TP2 on the PMC card and observed a proportional change in C1:PSL-PMC_PZT. |
C1:PSL-PMC_RAMP |
Unlocked the PMC by switching C1:PSL-PMC_SW1. Tweaked C1:PSL-PMC_RAMP and observed a change in C1:PSL-PMC_PZT.
|
C1:PSL-PMC_RFPDDC |
Observed a high value 0.5V when PMC is unlocked and a low value 0.03V when it is locked |
WFSs
Channels under test |
What was done |
C1:IOO-WFS*_SEG*_ATTEN |
We misaligned MC1 to get a measurable signal in WFS channels. NDScoped the corresponding C1:IOO-WFS*_SEG*_I&Q channels and observed a change in those channels in response to switching the attenuation on and off.
|
C1:IOO-WFS*_LO_LOCK_MON |
Disconnected the LO cable from the WFS boards and observed C1:IOO-WFS*_LO_LOCK_MON go to zero. |
C1:IOO-WFS*_SEG*_I&Q |
Connected a short SMA cable to the 29.5MHz frequency distribution board. Attenuated the signal by 20db and connected it to the different SEG channels one at a time and observed a response in C1:IOO-WFS*_SEG*_I&Q channels. |
C1:IOO-WFS*_SEG*_DC |
We shined a laser pointer to the different quadrants and observed saturation in the corresponding C1:IOO-WFS*_SEG*_DC with no cross talks. |
MC Servo
Channels under test |
What was done |
C1:IOO-MC_SW1, C1:IOO-MC_OPTIONA, C1:IOO-MC_POL, C1:IOO-MC_OPTIONB,C1:IOO-MC_FASTSW |
These switches unlocked the IMC when flipped. |
C1:IOO-MC_SW2, C1:IOO-MC_SUM_MON, C1:IOO-MC_SLOW_MON, C1:IOO-MC_FAST_MON |
A sine wave signal was injected in IN2 on the servo board. C1:IOO-MC_SW2 was switched on and the value of C1:IOO-MC_SUM_MON, C1:IOO-MC_SLOW_MON and C1:IOO-MC_FAST_MON changed accordingly. |
C1:IOO-MC_SW3 |
Connected a scope to OUT2 on the servo board. Switched C1:IOO-MC_SW3 on and observed a signal on the scope. |
C1:IOO-MC_EXCA_EN |
Unlocked the IMC by switching C1:IOO-MC_SW1 off. Connected a signal to EXC A and a scope to TP2A on the servo board and observed the signal on the scope when C1:IOO-MC_EXCA_EN was switched on. |
C1:IOO-MC_EXCB_EN |
Unlocked the IMC by switching C1:IOO-MC_SW1 off. Connected a signal to EXC B and a scope to TP2B on the servo board and observed the signal on the scope when C1:IOO-MC_EXCB_EN was switched on. |
C1:IOO-MC_REFL_OFFSET |
Unlocked the IMC by switching off. Tweaked C1:IOO-MC_REFL_OFFSET and observed a proportional change in C1:IOO-MC_SUM_MON. |
C1:IOO-MC_LATCH_EN |
Tweaked the VCO gain slider and observed the latch switch off and on. |
C1:IOO-MC_LIMIT |
Unlocked the IMC by switching C1:IOO-MC_SW1 off. Connected a sine wave signal to EXC B and enabled C1:IOO-MC_EXCB_EN. Ramped up the VCO gain. Raised the sine wave amplitude until C1:IOO-MC_LIMIT turned on. |
C1:IOO-MC_LIMITER |
We ramped the VCO such that C1:IOO-MC_LIMIT was switched on. We switched C1:IOO-MC_LIMITER on and observed C1:PSL-FSS_MIXERM high value go down. |
NPRO Diagnostics
Channels under test |
What was done |
C1:PSL-NPRO_* |
The signals were compared to previous values for consistency. Then they were unplugged from the Acromag chassis to confirm their values went to 0 and returned to the same values after being reconnected.
|
|
6252
|
Fri Feb 3 19:57:26 2012 |
rana | Configuration | SUS | PSL Shutter closed for SUS hysteresis test |
Fri Feb 03 19:57:20 2012
Fri Feb 03 20:25:19 2012 : Aligned all SUS to center their OL beams
Fri Feb 03 20:29:21 2012: Aligned all SUS to make OL_PIT = 0.5 |
13148
|
Fri Jul 28 16:47:16 2017 |
gautam | Update | General | PSL StripTool flatlined |
About 3.5 hours ago, all the PSL wall StripTool traces "flatlined", as happens when we had the EPICS freezes in the past - except that all these traces were flat for more than 3 hours. I checked that the c1psl slow machine responded to ping, and I could also telnet into it. I tried opening the StripTool on pianosa and all the traces were responsive. So I simply re-started the PSL StripTool on zita. All traces look responsive now. |
13150
|
Sat Jul 29 14:05:19 2017 |
gautam | Update | General | PSL StripTool flatlined |
The PMC was unlocked when I came in ~10mins ago. The wall StripTool traces suggest it has been this way for > 8hours. I was unable to get the PMC to re-lock by using the PMC MEDM screen. The c1psl slow machine responded to ping, and I could also telnet into it. But despite burt-restoring c1psl, I could not get the PMC to lock. So I re-started c1psl by keying the crate, and then burt-restored the EPICS values again. This seems to have done the trick. Both the PMC and IMC are now locked.
Unrelated to this work: It looks like some/all of the FE models were re-started. The x3 gain on the coil outputs of the 2 ITMs and BS, which I had manually engaged when I re-aligned the IFO on Monday, were off, and in general, the IMC and IFO alignment seem much worse now than it was yesterday. I will do the re-alignment later as I'm not planning to use the IFO today. |
13151
|
Sat Jul 29 16:24:55 2017 |
jamie | Update | General | PSL StripTool flatlined |
Quote: |
Unrelated to this work: It looks like some/all of the FE models were re-started. The x3 gain on the coil outputs of the 2 ITMs and BS, which I had manually engaged when I re-aligned the IFO on Monday, were off, and in general, the IMC and IFO alignment seem much worse now than it was yesterday. I will do the re-alignment later as I'm not planning to use the IFO today. |
This was me. I restarted the front ends when I was getting the MX streams working yesterday. I'll try to me more conscientious about logging front end restarts. |
16056
|
Wed Apr 21 00:08:15 2021 |
Koji | Update | PSL | PSL Table (sort of) covered / HEPA "chimney" |
Shutdown Procedure:
PSL Shutter closed / MC Autolocker disabled / PSL mechanical shutter closed / Laser injection current turned to zero / Laser turn off (red button) / Laser key turned off
The laser stat before the shutdown:
- LD Temp A: Set 22.07 (Untouched)
- LD Temp B: Set 21.03(Untouched)
- Laser Injection Current: Dial 9.53, Actual 2.100 -> Dial was moved to zero upon shutting down
- Laser Crystal Temp: Dial 3.34 (untouched) Set 30.57 Actual 30.60 (Untouched)
PSL Table covering
- Because of the so many cables going up and down, sealing the PSL table with the metalized sheet was not easy. Therefore, the sheets have been just softly laid above the optics. (Attachment 1)
- The largest sheet which covers the east half of the table was taped to the table at the bottom, so that the air from the chimneys (see below) does not come up to the table
- The large dust could come from the opening of the enclosure during the filter replacement. So it was considered to be easier to seal the openings. (Attachment 2)
- Of course, the HEPAs are going to be tested after the maintenance work. It means that vent paths were needed so that the seals do not explode with the pressure (together with dust).
- Thus, the tubes of the sheets are attached to the seals to form "chimneys" for guiding the airflow beneath the table. (Attachment 2/3/4)
- This configuration was not meant to be sufficiently strong for a continuous run of the fans. Long running of the HEPAs may cause the failure of the seal tapes.
Therefore the HEPA test should be done with a low flow rate and/or a short period of high flow.
- Once the work has been done, all the sheets should be carefully removed without scattering the fallouts onto the optics.
|
Attachment 1: 20210420235324_IMG_0560.jpeg
|
|
Attachment 2: 20210420235304_IMG_0559.jpeg
|
|
Attachment 3: 20210420235243_IMG_0558.jpeg
|
|
Attachment 4: 20210420235344_IMG_0562.jpeg
|
|
16057
|
Wed Apr 21 01:14:03 2021 |
Koji | Update | PSL | PSL Table (sort of) covered / HEPA "chimney" |
I also located the (possible) HEPA filters in the lab. (Attachments 1~3)
Oh! This is NO-NO! We can't place anything in front of the mains breakers. (Attachment 2)
I relocated the objects (Attachment 3)
|
Attachment 1: P_20210421_005056.jpg
|
|
Attachment 2: P_20210421_005114.jpg
|
|
Attachment 3: P_20210421_005302.jpg
|
|
2127
|
Wed Oct 21 11:41:29 2009 |
Zach | Update | WIKI-40M Update | PSL Table Diagram wiki entry |
I made a wiki entry for the PSL table diagram under the PSL directory on the 40mHomePage. I tried to use the ImageLink macro to use a resized (smaller) version of the diagram as a link to the full image, which it is designed to do if there is no target given, but it didn't seem to work. Instead, I had to create a second page that had the full-sized diagram, and I used ImageLink with a smaller version to link to that page.
The inventory that is shown is clearly incomplete. Part of this is due to the fact that many labels were either missing or impossible to read without touching stuff. For those components with labels missing, I tried to infer what they were to the best of my knowledge, but I wasn't able to for all of them. In true wiki spirit, everyone is encouraged to fill in any additional information they might have on these components. |
2128
|
Wed Oct 21 13:07:54 2009 |
Koji | Update | WIKI-40M Update | PSL Table Diagram wiki entry |
http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL_Table_Diagram
Thanks. I love this. Could you also put the original file that is editable for future modification by anyone?
Quote: |
I made a wiki entry for the PSL table diagram under the PSL directory on the 40mHomePage. I tried to use the ImageLink macro to use a resized (smaller) version of the diagram as a link to the full image, which it is designed to do if there is no target given, but it didn't seem to work. Instead, I had to create a second page that had the full-sized diagram, and I used ImageLink with a smaller version to link to that page.
The inventory that is shown is clearly incomplete. Part of this is due to the fact that many labels were either missing or impossible to read without touching stuff. For those components with labels missing, I tried to infer what they were to the best of my knowledge, but I wasn't able to for all of them. In true wiki spirit, everyone is encouraged to fill in any additional information they might have on these components.
|
|
2134
|
Thu Oct 22 15:49:29 2009 |
Zach | Update | WIKI-40M Update | PSL Table Diagram wiki entry |
Quote:
|
http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL_Table_Diagram
Thanks. I love this. Could you also put the original file that is editable for future modification by anyone?
Quote: |
I made a wiki entry for the PSL table diagram under the PSL directory on the 40mHomePage. I tried to use the ImageLink macro to use a resized (smaller) version of the diagram as a link to the full image, which it is designed to do if there is no target given, but it didn't seem to work. Instead, I had to create a second page that had the full-sized diagram, and I used ImageLink with a smaller version to link to that page.
The inventory that is shown is clearly incomplete. Part of this is due to the fact that many labels were either missing or impossible to read without touching stuff. For those components with labels missing, I tried to infer what they were to the best of my knowledge, but I wasn't able to for all of them. In true wiki spirit, everyone is encouraged to fill in any additional information they might have on these components.
|
|
Do you mean the diagram or the inventory? The diagrams are online as attachments (small versions on the main "PSL Table Diagram" page and large versions on the linked pages). The inventory is easily editable on the wiki itself. It's just rendered in table form using the CSV parse utility for "comma-separeted values" (though you actually need to use semicolons, for reasons unknown). |
2135
|
Thu Oct 22 21:58:26 2009 |
Koji | Update | WIKI-40M Update | PSL Table Diagram wiki entry |
Diagram. I don't want to say PNG is an editable format for this purpose...
You have the PPT, PDF or any drawing format to create this diagram.
Quote: |
Do you mean the diagram or the inventory? The diagrams are online as attachments (small versions on the main "PSL Table Diagram" page and large versions on the linked pages). The inventory is easily editable on the wiki itself. It's just rendered in table form using the CSV parse utility for "comma-separeted values" (though you actually need to use semicolons, for reasons unknown).
|
|
2136
|
Thu Oct 22 23:14:54 2009 |
Zach | Update | WIKI-40M Update | PSL Table Diagram wiki entry |
Quote: |
Diagram. I don't want to say PNG is an editable format for this purpose...
You have the PPT, PDF or any drawing format to create this diagram.
Quote: |
Do you mean the diagram or the inventory? The diagrams are online as attachments (small versions on the main "PSL Table Diagram" page and large versions on the linked pages). The inventory is easily editable on the wiki itself. It's just rendered in table form using the CSV parse utility for "comma-separeted values" (though you actually need to use semicolons, for reasons unknown).
|
|
Good news and bad news. For the MOPA diagram, which I did recently, I have GIMP file with separate layers for the background image, ray traces, and labels. Unfortunately, I didn't realize that this was the best way to do it until I had done most of the ray tracing for the main diagram, so, although I have that file in GIMP as well, only the labels are on a separate layer. If this is a major issue I can do the tracing again. The other thing is that the original files are quite large: 17.3 MB for the MOPA, and 64.1(!) MB for the main diagram. Let me know what you think. |
3391
|
Tue Aug 10 05:56:07 2010 |
Koji | Update | PSL | PSL Table Lifting Preparation |
Work on Aug 9th
Steve, Jenne, Koji, Alberto, Aidan, Jan, Sharmila, Katherine
From 9am to 6pm
- Shutting down the PSL after the 90885 hours of service
- Removals
- The accelerometers
- The reference cavity chamber
- The periscopes were left so far
- The cables between the PSL table and the outside have been disconnected
- Listed items on Friday
- Some unlisted items recorded and disconnected
- Drained the cooling water from the chiller lines
- Pulled out the chiller connections at the control room as well as the chiller control cables (temp sens & RS232C)
- Sealed the PSL table with plastic sheets
- Put antistatic films to the table (they are supported by the long optical poles)
- Used capton tapes to fix the films on to the table
- Put the white huge plastic sheet to cover the table at once
- Some spaces at the edge of the tables are left flat such that the C-clamps can be attached
- Sealed the AP and the ITMY tables by capton tapes
Some photos are attached in this entry. All of the photos found in the picasa album (click the slideshow)
|
Attachment 1: IMG_2686.jpg
|
|
Attachment 2: IMG_2691.jpg
|
|
Attachment 3: IMG_2692.jpg
|
|
Attachment 4: IMG_2711.jpg
|
|
10371
|
Tue Aug 12 23:07:24 2014 |
Harry | Update | General | PSL Telescope |
I put the PSL telescope in place, and started coupling to it.
Unfortunately, I was only able to couple about 55 uW into the "fiber coupler" (read: fiber coupled splitter). See picture below:

Additionally, I'm not sure why this is, but both of the splitters we ordered don't split equally, but to 90% and 10% in each output port.
We also found that, since we aren't using the fibers we originally intended to, the specs are a little different, and the waist we're trying to have at the collimator face is now 283 um. |
3463
|
Tue Aug 24 12:03:57 2010 |
rana | Update | PSL | PSL Upgrade: Mode Matching from PMC to IMC |
I used the free software called 'ABCD' for Mac to construct this mode matching solution for going from the PMC to the IMC.
After getting it close by eye, I plugged the initial guess into Matlab and let it optimize the distances. I then plugged this into 'ABCD'
to get the exact solution. ABCD doesn't actually optimize anything; it just makes a nice table and graphically plots the solution.
- The first waist between the first lens (f = +200 mm) and the second lens (f = -150 mm) is where the triple mod EOM goes. I have not accounted for the index (1.75) of the KTP.
- The third lens we need is a f = +400 mm lens. I have put the lenses in the new layout drawing at the positions indicated in the Omnigraffle drawing. Each grid square corresponds to 1 inch.
The part numbers for these lenses are:
PLCX-25.4-103.0-UV-1064
PLCC-25.4-77.3-UV-1064
PLCX-25.4-206.0-UV-1064
 
|
3469
|
Wed Aug 25 15:32:52 2010 |
rana | Update | PSL | PSL Upgrade: Mode Matching from PMC to IMC |
In a manner similar to the now classic 'Mode Matching from PMC to IMC' entry, I have calculated the lenses and positions needed to match the 2W NPRO beam into the PMC.
The added complication is that we also want to have a reasonable beam size to get into the Faraday and the AOM. It seems that this should be possible using one lens.
After the beam comes out of the AOM, there's another lens to match to the PMC. Its possible to do this with more lenses, but this is just an effort to minimize the number
of surfaces in the beam.
 
|
3470
|
Wed Aug 25 15:42:01 2010 |
Jenne | Update | PSL | PSL Upgrade: Mode Matching from PMC to IMC |
Thoughts on where to take the pickoff for the SHG for the PSL-green? We discussed today at the meeting the possibility of putting a 90/10 beam splitter right after the PMC, so that the green team would get somewhere between 100-200mW.
Quote: |

|
|
13590
|
Wed Jan 31 15:29:44 2018 |
johannes | Update | DAQ | PSL acromag server moved from megatron to c1auxex2 |
I moved the epics IOC server process for the single Acromag ADC that monitors the PSL signals from megatron to c1auxex2.
First, I disabled the legacy support on all channels as explained in elog 13565. Then I copied the files npro_config.cmd and NPRO.db from /opt/rtcds/caltech/c1/scripts/Acromag to /cvs/cds/caltech/target/c1psl2/ following the pattern of the old Motorola machines and the new c1auxex2. I had to make some edits for correct paths and expanded the epics records to the standard we're using for ETMX.
I then added a service to systemd on c1auxex2 that runs the epics IOC for the Acromag PSL channels: /etc/systemd/system/modbusPSL.service. No more tmux on megatron.
Running two IOCs on a signle machine at the same time did not produce any errors and seems fine so far. |
10287
|
Tue Jul 29 18:52:42 2014 |
Harry | Update | General | PSL and AUX Coupling Waist Measurement |
//edit Manasa// Harry will update this elog with before/after pictures of the table and power of the 1064nm rejected beam from the SHG.
While making these measurements, I reduced the Y end laser power (decreasing the current) so that we could use the beam profiler without burning anything and then brought it back up to the nominal power after the measurements were done.
Purpose
We wanted to take measurements of "waists" of the PSL and AUX (Y-Arm) so I can then design a telescope to couple both into fibers for use in FOL.
Measurements
For both lasers, PSL and AUX, I measured the profile of the dumped red (1064nm) beams coming out of the second harmonic generators, as this is the light that we will be using in FOL.
The power in the beam I measured from the PSL was 87.5 mW, and the power in the measured beam at the end table was 96 mW (when reduced from nominal power).
I used the beam profiler to take measurements of spot size at multiple points along the optical axis of both lasers.
An issue with these measurements was space constraints. In other words, there was no room on either table for a translation stage to hold the Profiler. I used a tape measure to determine Z-Coordinates. However, especially in the case of the AUX laser, parallax error caused uncertainty in my position measurements, which I would estimate at plus and minus 1.5cm.
I then fit these data using ALM to determine waist size and location for use in telescope design.
Z = 0 in the PSL graph is the face of the first mirror in the beam path, and in the AUX graph Z = 0 is the face of the SHG.

 
My measurement of the PSL gave:
X Waist = 43um at z = 6.8mm, as measured from the face of the SHG.
Y Waist = 44um at z = 6.8mm, as measured from the face of the SHG.
AUX Measurements gave:
X Waist = 44um at z = -3.1mm from the SHG face
Y Waist = 36um at z = -3.6mm from the SHG face
Find attached alm files in .zip
Movement on the Tables
In order to facilitate the measurements, we needed to move some things around, as pictured below.
On the PSL table, we installed a steering mirror after the Green filtering mirror, which is immediately after the SHG output, in addition to appropriate beam dumps.
before after 
At the end table, we removed some unused optics, as well as a PD, which were in the way . //edit// manasa: We removed IPANG (which has no light on it) and the associated steering optics.
before  after 
Moving Forward
Either tonight or tomorrow morning, I will use these data to design coupling telescopes for the PSL and AUX light.
Tomorrow, I will couple both lasers to fibers, and hopefully finish assembling the optics for FOL |
Attachment 4: FOL.zip
|
Attachment 8: AUXBefore.JPG
|
|
11940
|
Wed Jan 20 23:26:10 2016 |
gautam, rana | Update | LSC | PSL and AUX-X temperatures changed |
Earlier today, we did a bunch of stuff to see if we could improve the situation with the excess ALS-X noise. Long story short, here are the parameters that were changed, and their initial and final values:
X-end laser diode temperature: 28.5 degrees ---> 31.3 degrees
X-end laser diode current: 1.900 A ---> 1.942 A
X-end laser crystal temperature: 47.43 degrees ---> 42.6 degrees
PSL crystal temperature: 33.43 degrees ---> 29.41 degrees
PSL Diode A temperature: 21.52 degrees ---> 20.75 degrees
PSL Diode B temperature: 22.04 degrees ---> 21.3 degrees
The Y-end laser temperature has not yet been adjusted - this will have to be done to find the Y-beatnote.
Unfortunately, this does not seem to have fixed the problem - I was able to find the beatnote, with amplitude on the network analyzer in the control room consistent with what we've been seeing over the last few days, but as is clear from Attachment 1, the problem persists...
Details:
- PSL shutter was closed and FSS servo input was turned off.
- As I had mentioned in this elog, the beat can now only be found at 47.41 degress +/- 1 deg, which is a shift of almost 5 degrees from the value set sometime last year, ~42.6 degrees. Rana thought it's not a good idea to keep operating the laser at such a high crystal temperature, so we decided to lower the X-end laser temperature back to 42.6 degrees, and then adjust the PSL temperature appropriately such that we found a beat. The diode temperature was also tweaked (this requires using a small screwdriver to twist the little knob inset to the front panel of the laser controller) - for the end laser, we did not have a dedicated power monitor to optimize the diode temperature by maximizing the current, and so we were just doing this by looking at the beat note amplitude on the network analyzer (which wasn't changing by much). So after playing around a little, Rana decided to leave it at 31.3 degrees.
- We then went to the PSL table and swept through the temperature till a beat was found. The PMC wouldn't stay locked throughout the sweep, so we first did a coarse scan, and saw weak (due to the PMC being locked to some weird mode) beatnotes at some temperatures. We then went back to 29.41 degrees, and ran the PMC autolocker script to lock the PMC - a nice large beatnote was found.
- Finally, Rana tweaked the temperatures of the two diodes on the PSL laser controller - here, the optimization was done more systematically, by looking at the PMC transmitted power on the oscilloscope (and also the MEDM screen) as a function of the diode temperature.
- I took a quick look at the ALS out of loop noise - and unfortunately, our efforts today does not seem to have noticeably improved anything (although the bump at ~1kHz is no longer there).
Some details not directly related to this work:
- There are long cables (routed via cable tray) suitable for RF signals that are running from the vertex to either end-table - these are labelled. We slightly re-routed the one running to the X-end, sending it to the IOO rack via the overhead cable tray so that we could send the beat signal from the frequency counter module to the X-end, where we could look at it using an analyzer while also twiddling laser parameters.
- A webcam (that also claims to have two-way audio!) has been (re?)installed on the PSL table. The ethernet connection to the webcam currently goes to the network switch on the IOO rack (though it is unlabelled at the moment)
- The X-end area is due for a clean-up, I will try and do some of this tomorrow.
|
Attachment 1: 2016_01_20_ALS_OutOfLoop_1.pdf
|
|
11942
|
Thu Jan 21 18:34:04 2016 |
rana | Update | LSC | PSL and AUX-X temperatures changed |
Is the black ref spectrum from this year or from May of 2015 or ?
I wonder if the noise is a bunch of fast spikes or if its a true broadband rumble. Maybe we can tell by looking at the analog DFD or PLL outputs? |
10671
|
Wed Nov 5 17:50:29 2014 |
manasa | Update | General | PSL and AUXY beatnote in IR found |
Found the IR beatnote between PSL and Y end laser.
Since our goal was to find the beatnote ASAP to recover ALS, I ignored the fine details in alignment. I will revisit the setup to make some improvements in the near future.
1. Coupled the PSL IR beam leaking after the doubler into the fiber. We have only 10% coupling into the fiber at the PSL table right now (6mw); but this will be improved once I get a suitable translation stage for the telescope.
2. PSL IR --> PM980 fiber --->50-50 fiber beam splitter ---> 50-50 fiber beam combiner
AUX Y ---> PM980 fiber ---> 50-50 fiber beam combiner
The output port of the fiber beam combiner is connected to the fiber coupled broadband RF PD.
3. The RF output of the PD when connected to a spectrum analyzer shows a beatnote of -50dBm. The small amplitude of the beatnote is due to the laser power being attenuated before coupling into the fiber to keep the PD safe.
Attached is photo of how the setup is put on the PSL table. We will put all the stuff in a box once the X setup is also in place. |
Attachment 1: PSLsetup.jpg
|
|
10672
|
Wed Nov 5 18:08:00 2014 |
ericq | Update | LSC | PSL and AUXY beatnote in IR found |
Green beatnotes recovered.
It was just a matter of aligning the arm greens and PSL greens on the PSL table. I suppose something knocked the PSL alignment out of whack... I was also able to simultaneously see the green beatnote and IR beatnote respond to Yend laser temperature.
Locked arms on POX/POY, checked RMS of ALS-BEAT[X/Y]_FINE_PHASE_OUT_HZ channels.
- ALSY: 300Hz RMS
- ALSX: 700Hz RMS
These seem fine. Locked CARM and DARM on ALS, found IR resonances.
ALS is back in business  |
4629
|
Wed May 4 15:56:09 2011 |
valera | Summary | General | PSL and MC trends |
The attached plot shows 2 day trends of the PMC and MC reflected and transmitted power, the PSL POS/ANG QPD signals, and the temperature measured by the dust counter.
The power step in the middle of the plot corresponds to Koji/Jenne PMC realignment yesterday.
It looks like everything is following the day/night temperature changes. |
Attachment 1: pslmcdrift.pdf
|
|
4663
|
Mon May 9 09:37:51 2011 |
valera | Update | PSL | PSL and MC trends |
The attached plot shows 7 day trends of the MC and PMC power levels, PSL QPDs, and temperature. The MC stayed locked for ~40 hours over the weekend. The temperature swings were somewhat smaller over the past couple of days but one should remember to turn the PSL HEPA down after working on the table. Steve turned the HEPA flow from 100% down to 20% on Thursday and posted the reminder signs on the PSL enclosure. |
Attachment 1: pslmcdrift2.pdf
|
|
6724
|
Thu May 31 01:27:16 2012 |
yuta | Update | Green Locking | PSL and Y arm green beams aligned |
[Jenne, Yuta]
We aligned the PSL green optics so that the PSL green beam and Y arm green beam interfere. 2 beams are now hitting the Y arm beat PD. The DC level from the beat PD is about 13 mV.
We didn't try to see the beat signal for today, because the temperature of the doubling crystal seemed funny. We need to look into it tommorow.
Currently, the temperature control is enabled and the set point is 36.9 deg C, but the temperature is stuck at 33.0 deg C. |
1326
|
Thu Feb 19 22:40:33 2009 |
Kiwamu | Update | Electronics | PSL angle QPD |
I checked a broken QPD, which was placed for PSL angle monitor, and finally I cocluded one segment of the quadrant diode was broken.
The broken segment has a offset voltage of -0.7V after 1st I-V amplifier. It means the diode segment has a current offset without any injection of light.
Tomorrow I will check a new QPD for replacement.
Kiwamu IZUMI
|
1389
|
Wed Mar 11 21:03:51 2009 |
Kakeru and Kiwamu | Update | IOO | PSL angle QPD |
Kakeru and Kiwamu
We placed a QPD on the PSL bench for PSL angle monitor.
Quote: |
I checked a broken QPD, which was placed for PSL angle monitor, and finally I cocluded one segment of the quadrant diode was broken.
The broken segment has a offset voltage of -0.7V after 1st I-V amplifier. It means the diode segment has a current offset without any injection of light.
Tomorrow I will check a new QPD for replacement.
Kiwamu IZUMI
|
As we mentioned before, old QPD which used to be placed is broken.
And we put broken QPD into the "photodiodes" box under the soldering table.
|
12493
|
Wed Sep 14 19:41:23 2016 |
Johannes | Update | General | PSL back to high power |
Today's summary:
- Replaced mirror in MC REFL path with R=10% BS and aligned beam on PD while still at low power
- Replaced HR mirror in Transmon path at EY table with 50/50 BS. Alignment onto QPD not yet confirmed because we need IR from the YARM for it.
- Put ND filters back on Transmon QPDs at both X and Y ends. For now I put all the filters on, for a combined OD of 1.6 at both ends (1.0 + 0.6 at YEND and 1.0 + 0.4 + 0.2 at XEND).
- Put ND filter back on Transmon CCD on EY table.
- Reverted MC autolocker to nominal, high power version.
- Raised PSL output power back to nominal level by turning the waveplate. At the PSL shutter I measured a power of 1.03W. It occured to me too late that I realigned the PMC only afterwards and increased its transmission by a few percent, so I'll have to re-measure the actual PSL power.
- MC is locked with its transmission back up to ~15,400 counts. The autolocker is not very good at obtaining the lock, as it seems to try to turn the VCO gain up too far and loses lock. The script probably needs a revision.
- The YARM was pretty badly aligned. We used the green light to visually center the beam on the test masses AND had to go exploring with the TTs to see IR flashes in the first place. We got the YARM to lock to IR and were able to run the dither alignment. The maximum transmission we saw was on the order of 0.85. However, something strange is happening with the LSC control of the armlength. When the lock is engaged it drives PIT and YAW, which manifests itself in the OpLev signal and variable transmitted power on the TRY PDs. Osamu helped us diagnose this and was able to reduce the effect by tuning the POS gains to the individual ETMY OSEMS. The problem persisted even after using the new matrix diagonalization coefficients, we'll have to investigate this further and also take a look at the filters in the feedback path.
- ITMX is still stuck and way out of alignment, so we couldn't even start with the green light in the XARM.
|
1725
|
Wed Jul 8 19:13:19 2009 |
Alberto | Update | PSL | PSL beam aligned to the Mode Cleaner |
Today I tuned the periscope on the PSL table to align the beam to the Mode Cleaner. With the Wave Front Sensor control off, I minimized the reflection from the MC and maximized the transmission. While doing that I also checked that the transmitted beam after the MC didn't lose the alignment with the interferometer's main Faraday isolator.
In this way, I've got a reflection, as read from the MC_REFLPD_MC, of about 0.6. Then I centered the WFS on the AS table. After that the WFS alignment control brought the reflection to 0.25 and a nice centered bull-eye spot showed on the monitor. |
3511
|
Thu Sep 2 01:44:13 2010 |
Jenne | Update | PSL | PSL beam hitting the PMC! |
[Rana, Jenne]
More PSL progress.
The new laser was raised to a 4 inch beam height using basically the most randomly thrown together method possible. (It'll work just fine for aligning things, but we seriously need to get a nice block made.) The PMC and the nice Osamu-mirror mount to go into the PMC also have temporary risers, so we'll need to replace them with the real deal as soon as we get things back from the shop.
So far we've got (1) the lens after the laser, (2) a Half Wave Plate (no quarter wave plate yet), (3) steering mirror that will go after the EOM, (4) 2 steering mirrors to get into the PMC, in addition to all of the stuff that we did the other day. With all of this stuff we've got the beam hitting the 1st PMC mirror. We still don't have the EOM and AOM in the beam path however.
To get the rough alignment that we did, we turned on the new 2W NPRO, operating at the minimum power we could see on a card. We turned it off after use, so it is still off. Steve, we left the cable for the interlock sitting on the PSL table on the NW corner....can you please hook it up tomorrow? Also, after the interlock is installed we should go back to regular running laser hazard mode.
|
3519
|
Fri Sep 3 06:55:42 2010 |
rana | Update | PSL | PSL beam hitting the PMC! |
NPRO
Koji and I inspected and photographed the laser after opening up its case. I then drilled the clearance holes in the 4 corners and tapped holes for 1/4-20. I was careful to tap with the laser sideways, to avoid shavings getting into the laser and suctioned out as much of the pieces as I could. The laser is now mounted on some bad 1/4-20 based NewFocus style pedestals. The riser block can now be made with 1/4-20 through holes and the laser will sit on its for corner feet. We'll make the base aluminum to avoid differential CTE based stress in the laser base.
We checked the level of the laser. With the new mounting the beam is level to within ~1 mrad and has a 4" beam height.
Faraday
I've mounted the Faraday Rotator from the old MOPA. It has 8-32 mounting holes (who's shafts are curiously not parallel). We need an aluminum block of the proper height (2 3/4" ??) to make a permanent solution.
I've also mounted the thin-film polarizer. This works well, but it also needs a block machined to get the mounting to be less Mickey Mouse.
Pockel Cell for phase correction and 35.5 MHz PMC modulation
The EOM is mounted as before on the angle bracket to align it for P-pol light. The beam now goes cleanly through there. No further mounting hardware required.
Lenses
The 2 lenses in the 'mode matching telescope' between the laser and the PMC are in place, but not placed with any accuracy.
By sheer luck, I saw the PMC flashing in the TEM27 mode without any alignment from me. Next step is to get the lens positions tuned and then do the beam scan on the beam going towards the PMC to verify the approximate mode matching. This is all crude, but I just want to get the beam going into the vacuum as fast as possible. |