  7910   Thu Jan 17 00:17:31 2013 JenneUpdateLockingExpected PRC gains

    

       
            
  
  7912   Thu Jan 17 11:01:19 2013 JenneUpdateAlignmentYesterday's alignment work[Jamie, Jenne, Manasa]
Yesterday's goal was to get the input
beam centered on the PRM, the BS and ETMY
  
  7913   Thu Jan 17 15:48:21 2013 JenneUpdateLockingPRM - Flat mirror cavity 
 2" G&H mirror is installed
on a DLC mount just in front of the BS. 
  
  7914   Thu Jan 17 17:04:49 2013 SteveUpdateVACvac monitor screen changedThe COVAC_MONITOR.adl was changed. Ion
pump labeled as disconnected means: ion pump
controller power turned off and ion pump
 screenmod.png 
  7915   Thu Jan 17 19:33:53 2013 ManasaUpdateAlignmentPRM oplev We had to work on redesigning the
oplev layout in BSC when I found that the
positions of the mirrors were clipping IPPOS
  
  7916   Fri Jan 18 00:41:34 2013 JenneUpdateLockingDust?I was thinking tonight about more possible
reasons that our PRC sucks, and I wonder
if dust on the BS could create the problem.
  
  7917   Fri Jan 18 09:54:18 2013 JenneUpdateLockingPRM - Flat mirror cavity

    

       
            
  
  7918   Fri Jan 18 12:08:08 2013 KojiUpdateLockingDust?No


  
  7919   Fri Jan 18 15:08:13 2013 jamieUpdateAlignmentalignment of temporary half PRC[jenne, jamie]
Jenne and I got the half PRC flashing. 
We could see flashes in the PRM and PR2 face
  
  7920   Sat Jan 19 15:05:37 2013 JenneUpdateComputersAll front ends but c1lsc are downMessage I get from dmesg of c1sus's IOP:
[   44.372986] c1x02: Triggered
the ADC
 upside_down_cat-t2.jpg 
  7922   Sat Jan 19 18:23:31 2013 ranaUpdateComputersAll front ends but c1lsc are downAfter sshing into several machines and
doing 'sudo shutdown -r now', some of them
came back and ran their processes.
 FE.png 
  7923   Tue Jan 22 09:10:19 2013 SteveUpdatePEMbig foot is dirtyPlease wipe, clean car wheels and wear
booties entering the 40m lab.
Obviously this person has no idea
 IMG_1873.JPGIMG_1874.JPG 
  7924   Tue Jan 22 09:18:50 2013 SteveUpdateTip - Tilttip tilt bases orderedThe corrected drawing base for tip tilt
with coils are going to the shop. The will
be back by the end of the week.
 TTbc.PDF 
  7925   Tue Jan 22 11:09:58 2013 SteveUpdateTip - TiltSS mirror holder orderedKoji's design of the SS  2" mirror
holder with flexure spring optic retainer 
like Polaris-K1 has been ordered. We are
 D1201574_v1_Tip-Tilt_Mirror_Holder.SLDDRW 
  7926   Tue Jan 22 17:29:29 2013 RijuUpdate Photodiode transimpedanceRiju
Summary:  I am stuck with the
measurement of shot-noise-intercept-current
 pda255shotnoiseintercept.pdf 
  7927   Tue Jan 22 19:51:52 2013 KojiUpdate Photodiode transimpedance- The data should be plotted in a log-log
scale.
- The data points were only taken
  
  7928   Tue Jan 22 19:53:01 2013 JenneUpdateLockingPR-flat cavity status - not lockedThe PR-flat cavity is flashing, although
not locked.  I am too hungry to continue
right now.
  
  7929   Wed Jan 23 11:43:19 2013 RijuUpdate Photodiode transimpedance

    

       
            
 pda255shotnoiseintercept1.pdf 
  7930   Wed Jan 23 18:16:11 2013 ManasaUpdateGeneralLaseroptik mirror - SN6 I repeated the transmittance measurements
of LaserOptik SN6 @1064nm.
Transmittance for s-polarization 
 sn6_trans.png 
  7931   Wed Jan 23 19:05:16 2013 JenneUpdateLockingPR-flat cavity status - locks!Status update
I (with help from Q) have redone
the POP path on the ITMX table.  1"
  
  7932   Wed Jan 23 20:24:05 2013 KojiUpdateGeneralLaseroptik mirror - SN6Got confused (even after I talked with
Manasa).
The plot shows the number ~0.01 or
  
  7933   Wed Jan 23 20:27:05 2013 RijuUpdate Photodiode transimpedanceToday I have repeated the expt for shot
noise intercept current. Koji found that
the Spectrum analyzer is going to saturation,
  
  7934   Wed Jan 23 20:46:46 2013 Zen MasterUpdateLockingPR-flat cavity status - locks!

    

       
            
 yinYang.png 
  7935   Wed Jan 23 22:02:25 2013 ManasaUpdateGeneralLaseroptik mirror - SN6

    

       
            
  
  7936   Thu Jan 24 08:28:35 2013 SteveUpdateVACwhen to pumpdown ?Reminder: I will be on vacation next week.
We would have to put the access connector
in tonight if I'm pumping down Friday, tomorrow.
  
  7937   Thu Jan 24 11:31:45 2013 SteveUpdateSUSETMX damping restoredETMX sus damping restored.  It is
still noisy
  
  7938   Thu Jan 24 11:40:55 2013 JenneUpdateSUSETMX damping restored

    

       
            
  
  7939   Thu Jan 24 14:40:09 2013 SteveUpdateVACRGA backgroung RGA background with VM2 open to Maglev
at day 37
 
 Screenshot.png 
  7940   Thu Jan 24 15:16:50 2013 ManasaUpdateGeneralLaseroptik mirror - SN6I repeated the transmittance measurements
of Laseroptik SN6 at 1064nm. The rotation
stage could only resolve 2 deg rotation (We
 sn6_trans1.png 
  7941   Thu Jan 24 16:23:24 2013 KojiUpdateGeneralLaseroptik mirror - SN6The mirror T is completely out of spec.
We should find or request the data sheet
of the mirror.
  
  7942   Thu Jan 24 16:31:46 2013 SteveUpdatePEMbuilding exterier wall paintedThe wood exteier walls, gutters and doors
were painted at CES-Annex building #69
 IMG_1880.JPG 
  7943   Thu Jan 24 16:34:56 2013 ranaUpdateGeneralLaseroptik mirror - SN6  I have two questions:
1) Are we sure that the T measurement
is not being compromised by some systematic?
  
  7944   Fri Jan 25 08:10:42 2013 SteveUpdateGeneralLaseroptik mirrors Here are the German plots. Unfortunately
they are not logarithmic. 
 Ed: Proprietary data removed.
  
  7945   Mon Jan 28 17:01:19 2013 DenUpdateLockingVideo of PRM-flat test cavityWhat mode will you get if lock the cavity
PRM - ITMY/ITMX/TEST MIRROR without PR2,
PR3 and BS?
  
  7946   Mon Jan 28 17:59:02 2013 RijuUpdate Photodiode transimpedanceSummary: Measurement and plot of
shot-noise-intercept-current for PDA255.
 shotnoiseinterceptpda255.pdf 
  7947   Mon Jan 28 19:07:45 2013 ManasaUpdateGeneralSN6 Laseroptik mirror - Tranmittance measurementsI repeated the measurements using NPRO
instead of Crystalaser. I am attaching optical
layouts for these measurements for future
 sn6_trans0128.pngtrans_layout.png 
  7948   Mon Jan 28 19:15:14 2013 ManasaUpdateScatteringScattering setup [Jan, Manasa]
We are trying to get some scattering
measurements in the Y-arm cavity. We have
  
  7949   Mon Jan 28 21:32:38 2013 jamieUpdateAlignmenttweaking of alignment into half PRC[Koji, Jamie]
We tweaked up the alignment of the
half PRC a bit.  Koji started by looking
  
  7951   Tue Jan 29 10:50:02 2013 JenneUpdateLockingVideo of PRM-flat test cavity 
I think Den accidentally edited and
overwrote my entry, rather than replying,
  
  7953   Tue Jan 29 14:20:02 2013 KojiUpdateGeneralFiner rotation stage for optics characterizationA rotation stage has been ordered.

  
  7954   Tue Jan 29 14:34:42 2013 JenneUpdatePEMSecret Seis filters  
The BLRMS have been bad again, since
the computer crash of last week.  Finally
  
  7956   Tue Jan 29 18:40:20 2013 RijuUpdate Photodiode transimpedanceToday I have taken data for shot noise
intercept current for PDA10CF. I will process
the data and report.
  
  7957   Tue Jan 29 19:50:49 2013 JenneUpdateLockingBetter POP layout, no extra PRM motion with locked cavity[Jenne, Jamie, Manasa]
Today's activities focused on getting
the POP layout improved, so that we could
 HalfPRCL_PRM-flatMirror_RefsAreLocked_OthersUnlocked.pdfHalfPRCL_PRM-flatMirror_RefsAreLocked_OthersUnlocked.png 
  7958   Tue Jan 29 20:28:11 2013 ericqUpdateGeneralEarly work on Mirror Mounts [Q, Chloe]
Chloe has been to the lab twice to
start up her investigations in acoustic noise
 early.pdf 
  7959   Tue Jan 29 21:07:48 2013 JenneUpdateLockingPRM coils need diagonalizing 
 [Jenne, Jamie]
We tried actuating on PRM so that
  
  7960   Wed Jan 30 03:01:55 2013 KojiUpdateGeneralEarly work on Mirror MountsI
can't believe that SR785 can have
such a low input noise level (<1nV/rtHz).
  
  7961   Wed Jan 30 11:16:32 2013 JenneUpdateLockingMode spacing calc[Jenne, Jamie]
We did a few pen and paper calculations
yesterday to confirm for ourselves that the
  
  7962   Wed Jan 30 11:18:31 2013 ManasaUpdateScatteringScattering setup

    

       
            
  
  7963   Wed Jan 30 13:50:27 2013 JenneUpdateComputersc1iscex still down[Koji, Jenne]
We noticed that the iscex computer
is still down, but the IOP is (was) running. 
  
  7964   Wed Jan 30 14:00:02 2013 CharlesUpdateISSISS Design and PrototypingAttached are both the circuit diagram and
the liso formatted *.fil for the main branch
of the ISS, as well as the resulting transfer
 ISS.filISS_Transfer_Function.pngD020241-D2.pdf 